freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

reducingppidscanning(ppt29)-經(jīng)營管理-全文預覽

2025-09-11 14:44 上一頁面

下一頁面
  

【正文】 LRR from Sep. ‘00 to Nov. ‘00, and the PPID Scan Problem here was only calculated the data in Foxconn(DELL integrator). The same problem at other sites was just handled by LiteOn Service Centers and was omitted, which means the defective rate should be more than the quantity listed above. Category Q’ty Impact % SubImpact PPID Scan 51 % % CND 42 % % Wire Bushing 38 % % Resistors 35 % % MISC 26 % % Others 64 % % Total 256 % % 084168252PPID Scan CND Wire Bushing Resistors MISC Others%%%%%% for selecting this theme: For back up 2020/9/18 2020 LiteOn DELL CQS QIT TEAM 7 ? Foxconn plained some of the PPID labels on 9228C and 8765D models are very difficult to be scanned, which caused Foxconn lines shut down in Oct. and Nov. ‘00(VDCS No. IQC001120704) ? The Foxconn line DPPM is: Of Present Situation: Month Sep. Oct. Nov. TotalInput 127671 117047 188928 433646PPID defectives 2 9 40 51DPPM 16 77 212 118Goal 10 10 10 10PPID Scan Failure In Foxconn Line060120180240Sep. Oct. Nov.DPPMGoal2020/9/18 2020 LiteOn DELL CQS QIT TEAM 8 ? The other DELL sites, such as EMF, AMF and APCC, have encountered PPID scanning problem also. And failures are: a. Little zero area at the edge of PPID labels。2020/9/18 2020 LiteOn DELL CQS QIT TEAM 1 2020/9/18 2020 LiteOn DELL CQS QIT TEAM 1 Reducing PPID scanning problem in DELL integrators LiteOn Power Plant III 2020/9/18 2020 LiteOn DELL CQS QIT TEAM 2 a. Team Leader: Jay Wu b. Team Members: Able Song(JQE), Kate Gu(BCC), Penny Pan(IPQC), Tom Tang(MFG), Satch He(TE), Dalia Dai(CQS). c. Advisor: Jonathan Ma Team Name:Blue eyes Team Structure: 2020/9/18 2020 LiteOn DELL CQS QIT TEAM 3 Project Planning amp。01 FebAbleDaliaTeammembers職責分配項目AbleDaliaJay AbleDaliaAbleDaliaTeammembersTeammembersTeammembersTeammembersTeammembersTeammembers2020/9/18 2020 LiteOn DELL CQS QIT TEAM 4 Title: Reducing PPID Scanning Problem in DELL integrators, by improving DPPM from 212 to below 10. 2020/9/18 2020 LiteOn DELL CQS QIT TEAM 5 ?Improve LRR in DELL Matrix。 Effect: Material Equipment Operation Environment Printer maintain Inspection method Inspection standard Inspector Sticking Handling Put into carton Repaired unit reinput 2020/9/18 2020 LiteOn DELL CQS QIT TEAM 10 ? Root Cause Analysis (Fishbone) Of Root Cause amp。Prin
點擊復制文檔內(nèi)容
教學課件相關推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1