freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內容

six sigma 簡介(文件)

2025-02-28 19:50 上一頁面

下一頁面
 

【正文】 focused system of problem solving. * the land of QZ * Yellow Brick Road that takes us there. * problemsalving venture * direct to find solution improve bottomline 12 (2). 6 sigma focus on 1). A systematic road map to reduce variability in a process though assimilation anization of information that increase bottom line dollar savings. 2). The process that creates or eliminates the defects rather then the defects themselves. 3). Process : Process add value to it Input Output 13 5. The process of six sigma Measure 1. Select Critical To Quality characteristic 2. Define performance standard 3. Validate measurement system Analyze 4. Establish product capability 5. Define performance objectives 6. Identify variation sources Improve 7. Screen potential causes 8. Discover variable relationship 9. Establish operating tolerances Control 10. Validate measurement system 11. Determine process capability 12. Implement process controls 14 StageBreakthroughstrategy phaseIdentification(Question input vs inspecting) Recognize DefineCharacterization( are measured described)MeasureAnalyzeUnderstand currentperformance levelsOptimization (maximize maintain the enhancedprocess capability)ImproveControlAchieve breakthroughimprovementInstitutionalization(the results applied,culture)StandardIntegrateBreakthrough SystemBlack beltprojectsObjectiveIdentify keybusiness issuesTransfer how day to daybusiness is conducted6 . The Six Sigma Road map 15 7. Why 8 Steps of Six Sigma To ensure 1). Apply the breakthrough strategy in a methodical and disciplined way 2). Six sigma projects are correctly defined and executed. 3). The results of these projects are incorporated into running the day to day business. 16 8. 3 levels of anization 1). The highest level: business level (Deployment champion。6 sigma 圖 22 移動177。2 sigma 308700 177。4 sigma 63 177。1 Six Sigma Basic Concept 六個標準差 基本概念 2 一 . Preface 1. 1980 USA face to Japan’ s petition Japan’ s weapon: quality 2. 1985: Motorola’ s engineer Bill Smith reported,” if a product was found,defective and corrected during the production process,other defects were bound to be missed and found later by the customer during early use of the product, However,when the product was MFG errorfree,it rarely failed during early use by the customer.” 3. 1987 Motorola phase in 6 sigma 4. 1989 Motorola win the Malcolm Baldrige National Quality Award. 5. 1991 Allied Signal phase in 6 sigma, Saving BUSD/YR Productivity :6% up Profit : improved 13% 6. 1996 GE phase in 6 sigma due to Allied Signal’ s result. Six Sigma 3 6 Sigma Concepts 二 .. Why 1. GE phase in:1996 . 1997 saving E USD, . 1999 saving 15E, . Profitability improvement: from10% upto 15% 2. Quality level of 4 sigma : 6210 DPPM 3. Quality level of 6 sigma : DPPM 4. 20%margin improvement 5. 12%~18% capacity increase 6. 12% reduction of employee 7. 10%~30% capital reduction 4 希 格 瑪 規(guī) 格 界 限 規(guī)格界限
點擊復制文檔內容
畢業(yè)設計相關推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1