【正文】
specifications for the interfaces shown above. Hongkong Tele will be required to review and signoff on the detail design specifications for each interface, prior to the mencement of the next stage of development activities.It is assumed that Hongkong Tele will build feeder programs from legacy systems that will meet the requirements of the Oracle Applications interfaces and correspond with Oracleproduced design specifications. Hongkong Tele will build feeder programs from legacy systems using standard flat file formats, with additional assistance from Oracle as necessary.Hongkong Tele will provide and maintain a development environment。B Accounts ReceivableHighReturn Material Authorization information for Credit Memo creation within Damp。B General LedgerInboundDamp。 Identification of these percentages for each Purchase Order Line. Automatic creation of requisitions when the available quantities in Inventory are not sufficient to satisfy demand. AP Archive Data System Utilities System Receipt and Inspection System Equipment Register System Stores Location System Oracle Work in Process Oracle Quality Oracle Alert Business Process Reengineering/Redesign: The assumption that we make in this proposal is that the business processes will not differ substantially from what was provided in the tender document provided HKT. The team members will perform analysis and understand these processes and map it to the proposed package. They will not undertake to remend changes or undertake to change these processes. However in the course of mapping these to the package, if a modification to the process is necessary and has a positive result, the team may remend a change. This will have to be accepted by HKT before any implementation. Again any changes proposed will have to be handled as per the Change Control Procedure. Key Deliverables Section Out of Scope AreasThe scope of work in this implementation proposal does not include any tasks or activities related to the following : Project Organization Section Interfaces Section Section 5: Option 2 Phase 1 Implementation (Logistics) SummaryOracle has recognized that HKT needs to focus on Y2000 pliance for its Logistics Information System and thus stay operational beyond 1999. In addition to Oracle ‘s proposed Option1 Phase 1 Oracle has evaluated the functionality of HKT’s internal Legacy Satellite Systems and their fit to the Oracle proposed products. Oracle proposes HKT to replace most of the internal Legacy Satellite Systems through use of standard Oracle Applications. This approach not only builds a foundation for further improvements using Oracle’s products and services but also gives a new dimension of flexibility on a short term basis securing meeting the critical Y2000 deadline and at the same time providing the ability to incrementally improve HKT’s business operations.This approach is going to be less plex from both an implementation standpoint as well as from a user acceptance standpoint as in long term there will be less data redundancy and less effort in maintaining the satellite system. It is Oracle’s opinion that Option2 would give the safest way to meet short term goals and also satisfy long term strategic objectives with a cost effective program.Option 2 Phase 1 of the Business Support System will be positioned as the core element of Hongkong Tele’s integrated operational and management information system which will allow Logistics operational analysis and forecasting at both the management and operational level. The core of the Option 2 Phase 1 solution is the Oracle Logistics and Distribution Packages. These application software packages are “off the shelf” applications which support the business activities of Order Management, Purchasing Supply Chain Planning and Distribution. These applications have been built using Oracle Developer/2000 on Oracle RDBMS.Surrounding this core package will be a minimum set of custom extensions to support agreed upon functionality gaps not supported by the applications. Initially these gaps will be carefully reviewed for Option 2 Phase 1 impact with a desire to minimize risk and realize a faster implementation. Custom extensions will be developed using Oracle Developer/2000 for consistency in the user interface. ScopeA welldefined scope establishes the parameters and outes of the project. This section presents our current understanding of what Hongkong Tele requires from Oracle to address the stated system needs. Hongkong Tele’s requirements serve as the foundation for this proposal. The scope of this proposal is based on the Request for Proposal information , interviews with the key users from the main business functions, the document “Requested Scope And Strategy For Quotation From Suppliers” dated 3 October 1997, and is outlined in the following sections.Please refer to Appendix B Compliance Table Logistics Requirements. Appendix B1 provides the Statement of Compliance and Appendix B2 provides Option 2, Phase 1 Inclusion List.Appendix C of this proposal lists all Hongkong Tele Business Requirements for Financials. Appendix is a statement of pliance for all financials business requirements to be included in Option 1 and Option 2. In this document, all financials requirements that are NOT underlined (unless specified) will be PMO requirements and will be included in Option 1. Those that are underlined and in italic form will be FMO requirements and will be included in Option 2. Those that are underlined but not in italic form will be out of the scope of both Option 1 and Option 2. For details about what will NOT be included in Option 1 Phase 2, please