【正文】
為重點高中輸送學(xué)生近千名。綜上所述,該項目的建設(shè)符合國家大力發(fā)展教育事業(yè)的有關(guān)政策,建設(shè)條件良好,建設(shè)規(guī)模合理,建筑標準適當,具有顯著的社會和經(jīng)濟效益,應(yīng)抓緊落實、盡快實施。(5)注重規(guī)劃設(shè)計的前瞻性,建筑設(shè)計的新穎性,創(chuàng)一流設(shè)計施bed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, abed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, a 4工水平,節(jié)約各種能耗,合理利用土地。結(jié)合實際情況,按照填平補齊原則,實事求是地制定項目建設(shè)內(nèi)容;(2)注重協(xié)調(diào)發(fā)展、鼓勵資源節(jié)約的原則,完善生活設(shè)施建設(shè),改善食宿條件。資金籌措項目共需投資 萬元,全部由***市財政資金解決。本項目規(guī)劃建筑面積 60910 平方米,主要包括:高中部教學(xué)樓8054 平方米,高中部實驗樓 7405 平方米,科技圖書樓 5957 平方米,文體綜合樓 5320 平方米,師生食堂 6470 平方米,學(xué)生公寓 9114 平方米,行政樓 4293 平方米,小學(xué)綜合樓 7447 平方米。mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, a目 錄第一章 總 論 ............................................1一、項目概況 ..........................................1二、編制的依據(jù) ........................................3三、編制原則及研究范圍 ................................3四、主要技術(shù)經(jīng)濟指標 ..................................4五、研究結(jié)論 ..........................................5第二章 項目建設(shè)的必要性及可行性分析 .........................6一、***中學(xué)的現(xiàn)狀 .....................................6二、項目建設(shè)的必要性 ..................................8三、項目建設(shè)的可行性 ..................................8四、總結(jié) ..............................................9第三章 項目選址及建設(shè)條件 ..................................10一、建設(shè)選址 .........................................10二、建設(shè)條件 .........................................11第四章 建設(shè)內(nèi)容和工程設(shè)計方案 .............................12一、設(shè)計原則 .........................................12二、設(shè)計規(guī)范 .........................................13三、建設(shè)內(nèi)容和規(guī)模 ...................................14四、建筑工程 .........................................14五、給排水工程 .......................................18六、供電工程 .........................................19七、采暖 .............................................20mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, a八、消防 .............................................21第五章 環(huán)境保護 ............................................22一、環(huán)保設(shè)計采用的標準 ...............................22二、環(huán)境環(huán)境影響分析及治理措施 .......................22第六章 節(jié)能 ...............................................26一、設(shè)計依據(jù) .........................................26二、設(shè)計原則 .........................................26三、節(jié)能措施 .........................................26第七章 項目組織與管理 ....................................28一、組織機構(gòu) .........................................28二、項目管理 .........................................30三、項目監(jiān)督 .........................................31第八章 項目實施進度 ......................................32一、項目建設(shè)工期 .....................................32二、項目實施進度安排 .................................32三、項目實施進度表 ...................................33四、招標要求 .........................................33第九章 投資估算和資金籌措 ...............................36一、編制依據(jù) .........................................36二、建設(shè)投資估算 .....................................37三、投資估算表 .......................................37四、資金籌措方案 .....................................42mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, a第十章 社會效益 ..........................................43一、項目對社會的影響分析 .............................43二、項目所在地相互適應(yīng)分析 ...........................45三、社會評價結(jié)論 .....................................46第十一章 結(jié)論 .............................................46附圖附件bed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, abed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, a 1第一章 總 論一、項目概況項目名稱***市***中小學(xué)擴建項目承辦單位***市***中學(xué)項目負責(zé)人 ***項目選址項目位于***西路原***中學(xué)以東。原有初中教學(xué)實驗樓擴建 2135 平方米,遠期規(guī)劃建筑 4715 平方米,公建工程及道路硬化、綠化、管網(wǎng)工程等配套設(shè)施工程。bed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, abed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, a 3工程進度計劃項目計劃工期 2 年。(3) “以人為本、環(huán)境優(yōu)先”營造良好的教書育人的文化氛圍。研究范圍研究范圍:***市***中學(xué)擴建項目;研究要點包括:(1)項目建設(shè)的意義和必要性;(2)工程建設(shè)內(nèi)容及規(guī)模確定;(3)工程建設(shè)方案;(4)環(huán)境保護、節(jié)能、消防措施;(5)投資估算及資金籌措方案;(6)社會效益分析。第二章 項目建設(shè)的必要性及可行性分析一、***中學(xué)的現(xiàn)狀***中學(xué)學(xué)校創(chuàng)建于 1986 年,學(xué)??傉嫉孛娣e 畝,建筑面積20xx0 余平方米。在教學(xué)條件上,各種設(shè)施配套齊全。學(xué)校十分注重科學(xué)管理,提出了“向管理要質(zhì)量”的工作思路,不斷完善校長負責(zé)制,進一步推行量化考核制、教職工聘任制和結(jié)構(gòu)工資制,極大地調(diào)動了廣大教職員工的工作積極性、主動性和創(chuàng)造性,全校上下形成了精誠團結(jié)、求真務(wù)實、愛崗敬業(yè)、辛勤耕耘的良好氛圍,辦學(xué)規(guī)模不斷擴大,辦學(xué)水平不斷提高,教育教學(xué)成績斐然,社會聲譽越來越好,中考升學(xué)率連續(xù)八年位居市直中學(xué)首位。隨著學(xué)校周邊的居民區(qū)大量增加,常住人口大幅度增加,學(xué)校面臨著招生壓力越來越大。擴建后,***中小學(xué)將基本滿足周圍居民適齡子女的就學(xué)需求,并同時為社會提供更加優(yōu)質(zhì)的教育服務(wù),有力推動***市教育事業(yè)的發(fā)展,帶動全市及周圍地區(qū)教育質(zhì)量的全面提高。選址落實***中學(xué)擴建項目已完成校址選址工作,項目建設(shè)用地為***中學(xué)原校園周邊,靠近***公園,周邊以安置小區(qū)用地為主。同時避開地震裂帶、山區(qū)及丘陵區(qū)的陰坡面、滑坡體、懸崖邊及崖底、泥石流和洪水溝口等自然災(zāi)害地段。***中學(xué)項目用地總面積 平方米,用地四至為:東鄰規(guī)bed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, abed which had springs and a mattress. Because the weather was very hot, he carried the bed on to the roof of his house. He slept very well for the first two nights, but on the third night, a 11劃路,南鄰已建住宅樓及操場城東街,西鄰***西路,北鄰規(guī)劃路,場地較為規(guī)則,東西最寬處約為 210 米,南北長約 406 米,場地內(nèi)地勢平坦,用地內(nèi)保留初中部教學(xué)實驗綜合樓,其余建筑均拆