【正文】
p rate.3. To add discontinuation heat consumption of high impactAccording to the high add operation care for some homemade, maintenance manual calculation steam turbine unit, GaoJiaShi discontinuation heat consumption will increase.4. last word:Whether to add put into operation high unit loads and efficient influence is very big. So, it is hoped that through the above measures of high power countermeasure, and enhance the onset of attention and with all relevant improvement in practical work.Reference: the steam turbine equipment and system , author: WuJiLan, China power publishing, publication date: in 1998. The turbine operation , write: GongYeJu power in liaoning province, China publishing power , publication date: April 1995.Author introduction: born in December, 62, graduated from xinjiang school, power has 25 years of work and training experience, 94 in turbine in 2002 as a technician, professional founded teach cultivates center dedicated, professional training as turbine in August 2005 adjustable security specialist, merged as turbine safety in February 2006 production department to until now.高壓加熱器運行中存在的問題及對策內(nèi)容摘要:火力發(fā)電廠高壓加熱器由于處于高溫高壓下工作,故較易損壞,損壞后高加不能投入運行,給水溫度將要下降,文章指出了電廠高壓加熱器存在的管子及脹口泄漏,給水自動旁路密封不佳,疏水系統(tǒng)自動投入不良等一些較普遍的問題,分析了這些問題的成因,進(jìn)而提出了針對性的處理對策。 countermeasures1. preface Steam turbine thermal heating system is adopted to improve the unit operation of the important means of economic. Back to heat heating system operation reliability and performance directly affected the height, plete unit operation of economy TouRuLv is economic indicators heater in important evaluation indexes. As coalfired power plants to the large capacity, high parameter unit development, high pressure heater add) (hereinafter referred to as high as water supply under pressure and temperature rise accordingly。In the operation of high pressure heater problems and countermeasuresabstract: coalfired power plants in highpressure heater due to work under high temperature and high pressure, so easily damaged, damage could not invest in operation with high water temperature will drop, power, this paper points out the existing high pressure heater leakage pipes and bilge mouth water distribution automatic bypass seal not beautiful, scanty water system automatically into bad and so on some mon problems, analyses the causes of these problems, and p