【正文】
tain amount of sense, when the mechanical arm is to use the program as a basis. Difference is that the robot begand生命是永恒不斷的創(chuàng)造,因?yàn)樵谒鼉?nèi)部蘊(yùn)含著過剩的精力,它不斷流溢,越出時間和空間的界限,它不停地追求,以形形色色的自我表現(xiàn)的形式表現(xiàn)出來。deposition and the deposition network figure (according to safety guarantee system for deposition) 4, and project security responsibility target assessment standard (Enterprise according to actual itself developed) 5, and Safety responsibilities evaluation form table construction safety management objectives of the project (s): project name: Ann 21 injury control index of construction safety standards of civilization applied objective Note: assigned by the higher authorities. Project management roster project name: construction: site Office Tel: 22 Lister: Reviewer: submission date: year month day safety assessment methods of management by objectives (reference) 23, assessment agencies in order to further implement safety first, prevention first approach, strengthening safety management work, earnestly implement the responsibility system for production safety, achieving safety management objectives to ensure smooth production, led by the safety assessment conducted by the Panel. Second, the content and requirements: 1, safety, construction. All team members must strictly implement safety procedures, may not be illegal, wear the personal protective equipment correctly, any person who, without consent, it may not remove all security protection facilities in the field, without the use of a variety of electrical facilities and temporary power lines. According to the parent pany and mental requirements relating to construction of the project, doing the construction work. 2, special operations. Special operations personnel must hold relevant certificates, without the trainer does not post. 3, accident, put an end to a major accident, major accident control is zero, minor injury accident control for births. 4, team activities, each team must plete an activity record each week. Third, evaluating and scoring. Project organizations relating to personnel conduct prehensive checks each month to target every team every quarter. Check into unqualified, qualified, excellent three levels (below 70 points for the unqualified, 7080 is qualified, more than 80 points as well). Scores awarded to team projects reached more than 90 minutes, 70 points below the team penalized. Project safety objective management network diagram 24 Project Department safety target deposition (reference) Ann 241 for implement security first, prevention approach, implemented who tube who is responsible for principles, to caught focus parts (dangerous points, and source), and except hidden, and antiaccident for total target, effective implement safety target accountability, closely control and prevention three big hurt of occurred, developed security target deposition following: a, and project manager project safety first responsibility people. Target: implementation of national security policies and laws and regulations for project management and construction personnel security awareness,regulations. The revised regulations from the original 3 series, Chapter 15, 178, more than 24000 words reduced to 3, Chapter 11, 133, 17000 words. For example, before theWith criminal law coincidence of corruption and bribery, dereliction of duty dereliction of duty and other content, not a separate provisions in the party. Special supervisors of the Commission, Ma, vice president of China University of politics and law said, current disciplinary punishment regulation of December 2003 promulgated and implemented, but with the development of the situation, have been unable to fully meet the strictly new needs. The biggest problem is discipline law, of which nearly half of the content and the criminal law, the law on administrative penalties for public security, such as repeated, in fact, it is difficult to use, but also a waste of administrative costs, even in very few cases will appear to Ji generation method, pre empt. The revised implementation of the strictly, the party must manage the party, strengthening discipline check , for the party to overweight, before the law for the party delineated discipline bottom line, from wrong grabbed, not to bee Dang Jiyan Yu Guofa empty. The amendment Ordinance: to strengthen the role of the negative list, the provisions of the original Ordinance 10 categories of misconduct bing the integration and scientific revision for six categories: violation of political discipline, discipline, honesty and discipline, discipline of the masses, work discipline and discipline, the party constitution about discipline specific requirements, and sorting in the provisions of chapters in accordance with the similar similar and severely to the principle of National School of administration Professor Wang Yukai says, in the past, in violation of the party constitution, damage the authority of Party Constitution of misconduct lack seriously In terms of responsibility, to amend the legislation integration clear the members of the negative list, of Party members and cadres prohibited behavior of the scope of the facts were adjusted, refining the content, operation and not only told party members and cadres, what kind of behavior is not, also put forward clear basis for punishment, disciplinary action is no longer available drilling. The Central Party School professor Xin Ming said that the old regulations is a prominent issue is what are the tube, but some problems did not manage well. For example, political discipline, political rules previously difficult to grasp, there is a gray area, the amendment clarifies lists can condemnation , the discipline can not luck. Amendment: strict since the eighteen Political discipline an