【正文】
前 言進(jìn)入二十一世紀(jì)以來(lái),隨著社會(huì)的進(jìn)步與科技的發(fā)展,空調(diào)制冷技術(shù)也日益發(fā)展成熟。作為一名空調(diào)技術(shù)人員,重要的是在加強(qiáng)自己的理論知識(shí)的同時(shí),注重實(shí)踐經(jīng)驗(yàn)的積累,為人類創(chuàng)造更舒適的學(xué)習(xí)、工作及生活環(huán)境。畢業(yè)設(shè)計(jì)是對(duì)畢業(yè)生大學(xué)四年所學(xué)知識(shí)的一次系統(tǒng)檢測(cè),同時(shí)也是對(duì)學(xué)生綜合能力的一次系統(tǒng)提升。通過畢業(yè)設(shè)計(jì),可以培養(yǎng)學(xué)生獨(dú)立思考、解決工程實(shí)際問題的能力。通過本設(shè)計(jì),學(xué)生可以基本掌握空調(diào)系統(tǒng)設(shè)計(jì)的基本流程,對(duì)以后參與工程建設(shè)及設(shè)計(jì)有很大的幫助。 本次空氣調(diào)節(jié)的畢業(yè)設(shè)計(jì)是深圳市寶安區(qū)廣播電視大廈的空調(diào)系統(tǒng)設(shè)計(jì),該大廈地處深圳寶安區(qū)興華一路與寶安大道交匯處,是一座以辦公為主要功能的大樓。本設(shè)計(jì)給出了該大廈空調(diào)系統(tǒng)的全套設(shè)計(jì)方案,包括空調(diào)系統(tǒng)的負(fù)荷計(jì)算、設(shè)備的選型、管路的布置、管路的水力計(jì)算、通風(fēng)及氣流組織計(jì)算以及建筑防排煙等內(nèi)容。在設(shè)計(jì)過程中,本人多方查找空調(diào)設(shè)計(jì)的資料,征求老師和同學(xué)們的意見,力求設(shè)計(jì)符合規(guī)范,達(dá)到老師給定的設(shè)計(jì)要求。設(shè)計(jì)過程中遇到了許多以前課程設(shè)計(jì)中從未遇到過的工程實(shí)際問題,對(duì)本人來(lái)說(shuō)是一次不小的考驗(yàn),但同時(shí)也在解決這些問題的過程中慢慢的提高自己的知識(shí)運(yùn)用能力,具備了一些基本的設(shè)計(jì)能力,使我受益匪淺。設(shè)計(jì)過程中,本人不但專業(yè)綜合素質(zhì)得到提高,而且提高了許多辦公軟件的熟練度,如Excel,Word。特別是CAD制圖,本人已能熟練運(yùn)用。本次設(shè)計(jì)得到了張登春老師的悉心指導(dǎo)及教研室其他老師的教誨,在此特向諸位老師表示衷心的感謝,同時(shí)也感謝同組人員的幫助與協(xié)作。由于本人所學(xué)知識(shí)有限、經(jīng)驗(yàn)不足,設(shè)計(jì)中的錯(cuò)誤及不合理之處在所難免,敬請(qǐng)各位老師批評(píng)指正。 目 錄中英文摘要……………………………………………………….....................第一章 工程簡(jiǎn)述………………………………………………………...........1第一節(jié) 工程概況…………………………………………………………..1 第二節(jié) 設(shè)計(jì)內(nèi)容及要求……………………………………………………1 第三節(jié) ………………………………………………….......2第二章 負(fù)荷計(jì)算……………………………………………...........................3第三章 風(fēng)系統(tǒng)的確定及其水力計(jì)算…………………………………….....81第一節(jié) 總送風(fēng)量的確定………………………………………………......81第二節(jié) 新風(fēng)量的確定及其負(fù)荷計(jì)算………...……………………………..85第三節(jié) 空氣分布器及房間氣流組織計(jì)算………………………………......87第四節(jié) 風(fēng)管管逕確定及其水力計(jì)算……………………………………….92第四章 水系統(tǒng)的確定及其水力計(jì)算…………………...............................102第一節(jié) 空調(diào)水系統(tǒng)及其附件的選擇……………………………...............102第二節(jié) 空調(diào)水系統(tǒng)附件的選擇…………………………………………..107第五章 制冷機(jī)組及其水泵的選型……………………...............................120第六章 設(shè)備選型…………………………………………………………...123第七章 防火及防排煙設(shè)計(jì)………………………………………...............125參考文獻(xiàn)…………………………………………………………………….136某廣播電視大廈暖通空調(diào)系統(tǒng)設(shè)計(jì)摘要: 本設(shè)計(jì)為深圳某廣播電視大廈的空調(diào)設(shè)計(jì)。在該設(shè)計(jì)中計(jì)算了該大廈的各種空調(diào)冷負(fù)荷,包括圍護(hù)結(jié)構(gòu)、人體、照明、設(shè)備等形成的冷負(fù)荷以及人體散濕形成的濕負(fù)荷。根據(jù)空氣處理設(shè)備對(duì)空氣的處理過程和該大廈的建筑功能,選定了該大廈的空調(diào)系統(tǒng)方案——全空氣系統(tǒng)和風(fēng)機(jī)盤管加新風(fēng)系統(tǒng)。根據(jù)設(shè)計(jì)方案的要求,進(jìn)行了風(fēng)系統(tǒng)、冷凍水系統(tǒng)、冷卻水系統(tǒng)的水力計(jì)算以及各種設(shè)備和附件的選型計(jì)算。風(fēng)系統(tǒng)中,采用了散流器送風(fēng)、噴口送風(fēng)和風(fēng)機(jī)盤管側(cè)送風(fēng)三種比較常見的送風(fēng)方式,回風(fēng)采用了吊頂回風(fēng)方式;水系統(tǒng)中,根據(jù)該建筑的等級(jí)和使用要求,冷凍水系統(tǒng)采用了同程式布置;設(shè)備選型時(shí),力求做到經(jīng)濟(jì)、實(shí)用和安全。根據(jù)本專業(yè)的設(shè)計(jì)規(guī)范和工程設(shè)計(jì)程序,整個(gè)設(shè)計(jì)以經(jīng)濟(jì)安全節(jié)能為原則,以室內(nèi)環(huán)境舒適為目的。由于該建筑有十七層,地上十五層,地下二層,高83m,屬于高層辦公建筑,因此,對(duì)地下車庫(kù)做了通風(fēng)及防排煙設(shè)計(jì)、對(duì)各層樓梯間前室和消防電梯間前室做了加壓送風(fēng)設(shè)計(jì)。關(guān)鍵詞:冷負(fù)荷;全空氣系統(tǒng) ;空氣水系統(tǒng);噴口;冷凍水系統(tǒng);防排煙 Major: Building Environment and Equipment Engineering Author: ZENG Sheng Instructor: ZHANG DengchunAbstract:This design is the HVAC system design of the Shenzhen Baoan Broadcast and Television Center. I have calculated each kind of air conditioning colling load in this design, which is formed by the enclosure structure, the human body, the illumination, the equipment and so on, as well as the moisture load which is dispersed by the human body . According to the treating processes of air by the air handling equipment and the construction function of this building, I have selected the airconditioning system plan of this building——all air system and primary air fancoil system. According to design proposal’s request, I have carried out the water power putation of air system, chilled water system and cooling water system, as well as the shaping putation of other equipment and the appendix. In air system, I have used three quite mon blasts ways: the drifting blast, the nozzle blast and the fancoil side blows. The return air uses the suspended ceiling return method。 In water system, according to this building rank and the operation requirements, the chilled water system has been used the reverse return。 When selecting equipment, I make great effort to assure economical, practical and safe. According to this specialized design standard and the engineering design procedure, the entire design take the economic, the security and the energy conservation as a principle, take fortable environment of the indoor as the goal. Because this building has 17 floors, on the ground has 15, and underground has 2 ,with height of 83 meters, belongs to the high office building ,Therefore, the underground garage has been designed for ventilation and smoke control and extraction. Each stair hall and fire elevator in front of room has been pressurized to guard against the smoke.Keywords: cooling load。 all air system。 airwater system 。 spray。 chilled water system。 smoke control and extraction 第一章 工程簡(jiǎn)述第一節(jié) 工程概況1該工程為深圳市某廣播電視大廈空調(diào)設(shè)計(jì)。2本設(shè)計(jì)圖依據(jù)批準(zhǔn)規(guī)劃圖,建設(shè)單位所批方案進(jìn)行設(shè)計(jì)。3該建筑為深圳市某廣播電視大廈,地處華興一路與寶安大道交匯處。共有17層,地下兩層,地上15層,為一棟辦公建筑,。4本施工圖所標(biāo)尺除標(biāo)高以米為單位外,其余尺寸均以毫米為單位。5墻體:(1) 各層平面圖中墻體厚度為240㎜,磚及沙漿標(biāo)號(hào)詳結(jié)施。(2) ,鋪設(shè)20厚1:2水泥沙漿(內(nèi)摻5%防水劑)。(3) 玻璃幕墻為雙層中空玻璃幕墻, 5mm玻璃+9mm空氣+5mm玻璃,有內(nèi)遮陽(yáng)窗簾。 (4) 女兒墻為240㎜厚眠墻,最低處不得少于1100㎜。第二節(jié) 設(shè)計(jì)內(nèi)容及要求設(shè)計(jì)以全年空調(diào)系統(tǒng)為主,包括建筑物空調(diào)設(shè)計(jì)、制冷機(jī)房及空調(diào)設(shè)備選型設(shè)計(jì)。1主要內(nèi)容:(1)工程概況 包括工程名稱、設(shè)計(jì)建筑物概況、建筑物地點(diǎn)及周邊環(huán)境,建筑物面積,空調(diào)面積,建筑物層數(shù)及各樓層的功能,設(shè)計(jì)要求等;(2)設(shè)計(jì)參數(shù)確定 室外設(shè)計(jì)參數(shù),室內(nèi)設(shè)計(jì)參數(shù),建筑物設(shè)計(jì)參數(shù);(3)空調(diào)負(fù)荷計(jì)算;(4)空調(diào)系統(tǒng)方案的選擇及空氣處理過程的確定;(5)空調(diào)冷熱源的確定;(6)風(fēng)系統(tǒng)設(shè)計(jì)及氣流組織;(7)水系統(tǒng)設(shè)計(jì);(8)防排煙設(shè)計(jì)。2設(shè)計(jì)要求::(1)空調(diào)風(fēng)系統(tǒng)平面圖、剖面圖、軸側(cè)圖;(2)空調(diào)機(jī)房平面圖、剖面圖;(3)空調(diào)設(shè)備層平面圖、剖面圖;(4)空調(diào)水系統(tǒng)流程圖、軸側(cè)圖;(5)膨脹水箱、集水器、分水器等大樣圖。 說(shuō)明書要求:一律WORD錄入,部分設(shè)計(jì)圖用CAD繪制;說(shuō)明書裝訂順序:設(shè)計(jì)任務(wù)書,指導(dǎo)老師評(píng)語(yǔ),答辯委員會(huì)評(píng)語(yǔ),目錄,前言,正文,參考文獻(xiàn)。第三節(jié) 主要?dú)庀筚Y料本設(shè)計(jì)建筑物為深圳市寶安區(qū)廣播電視大廈,查資料[Ⅰ]:由于深圳與廣州市相鄰,故本設(shè)計(jì)中所有的數(shù)據(jù)均取廣州地區(qū)。冬季日照率(%)40 冬季 冬季 5℃大氣壓力 室外計(jì)算干球溫度 ` 夏季 kPa 夏季 ℃夏季空氣調(diào)節(jié)室外計(jì)算濕球溫度:℃ 最冷月平均 70% 冬季最多風(fēng)向平均 室外計(jì)算相對(duì)濕度 最熱月平均 83% 室外風(fēng)速 冬季平均 m/s 最熱月14時(shí)平均 67% 夏季平均 m/s室外最熱月平均溫度:℃以上各計(jì)算參數(shù)均為1951年1980年統(tǒng)計(jì)。第二章 負(fù)荷計(jì)算1 室內(nèi)外設(shè)計(jì)參數(shù)的確定::室外計(jì)算干球溫度tg=℃,空調(diào)計(jì)算日平均溫度tg..p=30℃,相對(duì)濕度83%,℃。 室內(nèi)設(shè)計(jì)參數(shù):室內(nèi)計(jì)算干球溫度tg=26℃,相對(duì)濕度取60%。2 建筑物設(shè)計(jì)參數(shù):: 各圍護(hù)結(jié)構(gòu)夏季熱工指標(biāo)類 型構(gòu) 造序 號(hào)K(W/m2*K)βνfξ外 墻外粉刷,鋼筋混凝土空心板 填充泡沫混凝土,內(nèi)粉刷45內(nèi) 墻磚墻1玻璃幕墻單層鋼窗屋 頂?shù)蹴斘萆w44由樓板和內(nèi)墻的放熱衰減度查《空氣調(diào)節(jié)》表26可知房間均屬重型建筑,該建筑圍護(hù)結(jié)構(gòu)大部分為玻璃幕墻,玻璃幕墻所采用的玻璃為底輻射鍍膜玻璃, 玻璃型號(hào)是雙層中空玻璃幕墻,+9mm空氣+5mm玻璃,傳熱系數(shù)K=㎡.K其他參數(shù)見《耀華在線低輻射鍍膜玻璃》。在本設(shè)計(jì)中均按單層鋼窗計(jì)算,無(wú)外遮陽(yáng),內(nèi)設(shè)淺藍(lán)布簾,取窗玻璃的遮擋系數(shù)Cs=,窗內(nèi)遮陽(yáng)設(shè)施的遮陽(yáng)系數(shù)Cn=,窗的有效面積系數(shù)Xg=,地點(diǎn)修正系數(shù)Xd=.3 負(fù)荷的主要內(nèi)容::(1) 通過圍護(hù)結(jié)構(gòu)傳入室內(nèi)的熱量;(2) 通過外窗傳入室內(nèi)的太陽(yáng)輻射熱量;(3) 人體散熱量;(4) 照明散熱量;(5) 室內(nèi)用電設(shè)備散熱量。4 第十二層空調(diào)負(fù)荷計(jì)算:(1)外窗瞬變傳熱形成冷負(fù)荷計(jì)算公式:CLQτ=K*F*Δtτ (W) (2—1)