【正文】
I 市南排河漁港碼頭工程設(shè)計 梁板式高樁碼頭結(jié)構(gòu) Fishing port design of Nan pai river in Huang hua Beamandslab Highpile Structure II 摘 要 市南排河漁港位于河北省東部,渤海灣西岸, 市以東 30km 處,是河北省群眾漁業(yè)的國家一級漁港,漁港碼頭岸線達(dá) 。 本文設(shè)計的是 市南排河卸漁碼頭,碼頭總長 212m,寬 ,結(jié)構(gòu)為梁板式高樁碼頭, 縱橫梁搭在樁帽上。采用軌距 門機(jī)起重 機(jī)進(jìn)行裝卸作業(yè)。主要對面板,縱梁和橫向排架進(jìn)行了計算。以四邊與縱橫梁相連的雙向板為例進(jìn)行內(nèi)力計算與配筋,縱梁部分施工期按簡支梁計算,使用期按剛性連續(xù)梁計算。 橫梁按彈性支承連續(xù)梁進(jìn)行內(nèi)力計算。 關(guān)鍵詞: 高樁碼頭 ; 雙向板 ; 彈性支承連續(xù)梁 ; 樁端承載力 III ABSTRACT Nan pai river located in He bei province,the east of Bohai Bay, 30km east of Huang hua city, is the national level of hebei people fishing port. The coastline is . This design is exclusive River south Huanghua city unloading fishing pier, wharf length of 212m, width of , the structure of beams and slab tall pile, vertical and horizontal beam resting on pile cap. gauge door with loading and unloading crane. Primary lateral and longitudinal of panel, bent. With the rectangle beam with and linked to twoway plate as internal force calculation and reinforcement, longitudinal beam calculation, constructio n parts according to the continuous girder by rigid system. According to the elastic beam supporting continuous beams. KEY WORDS: highpiled wharf。 twoway slab。 Elastic support beam。 Pile bearing capacity 目 錄 第 1章 設(shè)計背景 1 工程概述 1 設(shè)計原則 1 設(shè)計依據(jù) 1 設(shè)計任務(wù) 1 第 2章 設(shè)計資料 2 地形 條件 2 氣象條件 2 水文條件 3 地質(zhì)條件 4 地震條件 6 漁港卸漁量與漁船發(fā)展水平 6 第 3章 設(shè)計成果 7 總體設(shè)計成果 7 結(jié)構(gòu)方案成果 7 施工圖設(shè)計成果 7 設(shè)計成果評 價 7 第 4章 平面設(shè)計 9 工程規(guī)模 9 布置原則 9 設(shè)計船型 9 總體尺度 10 平面方案比選 1