【正文】
October 20xx 1/7 GM192714 APQP KickOff Meeting APQP 啟動(dòng)會(huì)議 The purpose of this meeting is to develop a mon understanding concerning the total requirements of the part/material by assuring that proper munication and buyin occurs between GM and the supplier. This form enpasses questions from the AIAG Advanced Product Quality Planning and GM APQP Manual GM1927 manuals. Its intent is to ensure advanced product quality planning activities occur at the appropriate time and establish customer requirements for part qualification, part availability, quality, packaging, scheduling, and tooling information. Current revisions of all GM documents listed can be found in the GM Supply Power web site. 本次會(huì)議旨在建立雙方在對(duì)零件、材料的所有要求方面一致理解。下表包含了AIG產(chǎn)品質(zhì)量先期策劃和通用PQ手冊(cè)GM-1927的問(wèn)題。其目的在于確保先期質(zhì)量策劃活動(dòng)按進(jìn)度展開,并明顧客關(guān)零件認(rèn)可獲取包裝計(jì)劃和工裝方面的信息。 GM 相關(guān)文件的 當(dāng)前版本可在 GM Supply Power 網(wǎng)站上獲得。 This document should be pleted by the supplier and provided to the SQE prior to the meeting date. 本文件應(yīng) 在會(huì)議前由供應(yīng)商填寫完成并提交給 SQE。 DATE 日期 PROJECT/PROGRAM 項(xiàng)目名稱 SUPPLIER 供應(yīng)商 PART NO 零件號(hào) MANUFACTURING LOCATION 制造場(chǎng)所 PART DESCRIPTION零件描述 Section 1. Customer Requirements 第一部分 顧客要求 1. Does the supplier understand the applications and intended end use of the parts/materials for all customer? 供方是否理解所有顧客的零件 、材料的 應(yīng)用和最終用途 ? Yes 是 No 否 Explain:理由: 2. Does the supplier have the latest information about program timing (example: Drawing release, Prototype – series, Matching, Pilots/MVB, SOP)? Review Program Milestones with supplier 供方是否有關(guān)于項(xiàng)目進(jìn)度的最新信息(如:圖紙發(fā)放,系列樣件,匹配,試生產(chǎn),開始正式生產(chǎn))? 與供方評(píng)審項(xiàng)目節(jié)點(diǎn)。 Yes 是 No 否 Explain:理由: Key Project Milestones 關(guān)鍵項(xiàng)目節(jié)點(diǎn) Dates 日期 Key Project Milestones 關(guān)鍵項(xiàng)目節(jié)點(diǎn) Dates 日期 3. Does the supplier have and understand the QS9000 or TS16949 Manual, FMEA Manual,SPC Manual, Measurement Systems October 20xx 2/7 GM192714 Analysis Manual, Quality System Analysis Manual, PPAP Manual and the Advanced Product Quality Planning (APQP) and Control Plan Manual? 供方是否有并理解QS-9000 或 TS16949, FMEA, SPC,MSA,QSA,PPAP,APQP和控制計(jì)劃手冊(cè)? Yes 是 No 否 Explain:理由: 4. Has the supplier provided all information listed in the Required Quality Information letter as outlined in the RFQ package? 供方是否提供RFQ文件包中的