【正文】
1 鋼鐵廠 自動光譜分鋼儀 招標(biāo)書范本 總則 General Provisions 概況 General XX 鋼鐵股份公司寶鋼分公司鋼管廠擬建設(shè)特殊扣油套管生產(chǎn)廠。專門用于特殊扣油套管的生產(chǎn),該廠年產(chǎn)量為 6 萬噸。 Baoshan Iron amp。 Steel Co., Ltd. Baosteel Branch Steel Tube Plant intends to build a premium joint oil casing and tubing line with an annual output of 60,000t dedicated to the production of premium joint oil casinga and tubing. 由一條管體生產(chǎn)線和多臺管接箍車絲機(jī)組成。計(jì)劃于 2021 年 8 月建成投運(yùn)。 It consists of a tubing production line and many coupling threading machines and is scheduled to put into operation in Aug. 2021. 為實(shí)現(xiàn)對所生產(chǎn)的管料進(jìn)行在 線自動混鋼分選,擬在該生產(chǎn)線設(shè)置自動光譜分鋼儀一套,以實(shí)現(xiàn) 100%在線自動混鋼分選。 In order to realize online automatic mixed steel analysis for the tubing material produced, a set of automatic spectroscopic analysis device is to be installed on the line to realize 100% online automatic mixed steel analysis. 本次招標(biāo)項(xiàng)目的招標(biāo)內(nèi)容為:管體生產(chǎn)線的光譜分鋼儀和相應(yīng)的輔助機(jī)械以及配套的潤滑、氣動、電氣控制系統(tǒng)等,共 1 套,以滿足 6 萬噸特殊螺紋油套管的分鋼要求。 The tendering content of the project is: the spectroscopic analysis device for tubing production line and corresponding auxiliary mechanical and matching lubrication, pneumatic and electrical control system, etc., totally 1 set, to satisfy the steel separating requirements for 60,000t of premium joint oil casing and tubing. 本次招標(biāo)的光譜分鋼儀, 以 國際 公開招標(biāo) 方 式采購。 The bidding spectroscopic analysis device will be purchased through international petitive bidding. 投標(biāo)設(shè)備應(yīng)采用國際上成熟可靠的先進(jìn)工藝和設(shè)備,其產(chǎn)品質(zhì)量、生產(chǎn)成本、各項(xiàng)消耗指標(biāo)和勞動生產(chǎn)率等均應(yīng)達(dá)到國際先進(jìn)水平。 The bidding equipment shall adopt the internationally proven and reliable stateoftheart process and equipment, the product 2 quality, production cost, various consumption indices and productivity of which shall all reach the international leading level. 投標(biāo) 人 除了應(yīng)具有設(shè)計(jì)、制造本標(biāo)書所規(guī)定設(shè)備的資格和能力,對設(shè)備的加工能力、質(zhì)量、使用性能、供貨的完整性、安裝指導(dǎo)及調(diào)試負(fù)責(zé)外,任何在 光譜分鋼儀 上的有益改進(jìn),并且經(jīng)實(shí)踐證明是實(shí)用的 、 有效的,將有利于中標(biāo)。 The bidder shall have the qualification and capability to design and manufacture the equipment specified in the bidding document, and be responsible for the processing capacity, quality, performance, supply pleteness, installation instruction and missioning of the equipment. Any beneficial improvement for spectroscopic analysis device, which is proven by practice to be practical and effective, will help to win the bid. 同時(shí)要求投標(biāo)人有設(shè)計(jì)及制造過在線光譜自動分鋼儀的業(yè)績。 Meanwhile, the bidder is required to have the references of designing and manufacturing the online automatic spectroscopic analysis device. 投標(biāo) 人需在 投標(biāo)書中 (以附錄形式單列 )提供類似 設(shè)備 的供貨實(shí)績或相關(guān)介紹。 The bidder shall provide the references of similar equipment supply or relevant introduction in the bid (listed separately in the form of attachments). 本招標(biāo)書要求投標(biāo)方以技術(shù)附件的形式編寫投標(biāo)文件中的技術(shù)規(guī)格書部分。 The bidding document requires the bidder to prepare the technical specifications of the bid in the form of technical appendices. 設(shè)備安裝位置 Equipment installation position 特殊扣油套管生產(chǎn)線布置位置位于 XX 鋼鐵股份公司寶鋼分公司鋼管廠機(jī)修車間區(qū)域。The premium joint oil casing and tubing line is located in the mechanical maintenance workshop area of Baoshan Iron amp。 Steel Co., Ltd. Baosteel Branch Steel Tube Plant. 光譜分鋼儀的在線部分安裝在鋼管測長稱重區(qū)域的測長工位前的定位輥道處。 The online part of spectroscopic analysis device is to be installed in the positioning roller table before the working position of length measurement in the steel tube length measuring and weighing area. 離線設(shè)備安裝在機(jī)組旁的操作室內(nèi)。 The offline equipment is to be installed in the 3 operation room beside the line. 具體位置見附圖一。 Refer to attached drawing 1 for the specific location. 現(xiàn)場建設(shè)條件 Onsite construction conditions 原料條件 Raw material conditions 特殊扣油套管生產(chǎn)線所生產(chǎn)的鋼種見表 21。 Refer to table 21 for the steel grades produced by premium joint oil casing and tubing line. 表 21 特殊扣油套管生產(chǎn)線所生產(chǎn)的鋼管品種 Table 21 the varieties of steel tubes produced by premium joint oil casing and tubing line 特殊扣油套管生產(chǎn)線所生產(chǎn)的鋼管規(guī)格如下: The specifications of steel tubes produced by premium joint oil casing and tubing line are as follows: 直徑范圍: ~ Diameter range 油套管長度范圍: ~ Oil casing and tubing length range 壁厚范圍: ~ Wall thickness range 端部彎曲程度: 小于 3mm/m Bending degree of ends 外徑公差: 外徑 ≤100mm 177。 OD tolerance 4 外徑 > 100mm %D~+ 1% D 壁厚公差: 177。% t(t 為名義壁厚 ) Wall thickness tolerance 工作制度 Working system 車間實(shí)行三班連續(xù)生產(chǎn)。 The workshop adopts 3shift continuous working. 每年的工作 時(shí)間定義如下: The working time of each year is defined as follows: 說明: 7200 小時(shí)的年純作業(yè)時(shí)間中包括生產(chǎn)中必須工具更換以及調(diào)整等時(shí)間。 Note: the 7200h annual pure working time includes the time necessary to change and adjust the tools, etc. during the production. 自然條件 Natural conditions 年平均溫度 ℃ Annual ave. temp. 最高溫度 ℃ Highest temp. 最低溫度 ℃ Lowest temp. 年最熱月平均溫度 ℃ Annual hottest monthly ave. temp. 年最冷月平均溫度 ℃ Annual coldest monthly ave. temp. 年最大氣溫日較差 ℃ 5 Annual max. daily range of temp 年最大極端氣溫年較差 ℃ Annual max. extreme annual range of temp. 冬季采暖室外計(jì)算溫度 2℃ Outdoor calculated temp. for heating in winter 冬季通風(fēng)室外計(jì)算溫度 3℃ Outdoor calculated temp. for ventilation in winter 夏季空調(diào)室外計(jì)算溫度 34℃ Outdoor calculated temp. for air conditioning in summer 夏季空調(diào)日平均計(jì)算溫度 ℃ Daily ave. calculated air conditioning in summer 夏季通風(fēng)室外計(jì)算溫度 32℃ Outdoor calculated temp. for ventilation in summer 夏季空調(diào)室外計(jì)算濕球溫度 ℃ Outdoor calculated wetbulb temp. for air conditioning in summer 相對濕度 Relative humidity 年平均相對濕度 79% Annual ave. relative humidity 夏季月平 均相對濕度的最高值 90% Highest monthly ave. relative humidity in summer 冬季月平均相對濕度的最低值 60% 6 Lowest monthly ave. relative humidity in winter 大氣壓力 Atmospheric pressure 年平均氣壓 kPa Annual ave. pressure 夏季平均氣壓 kPa Ave. pressure in summer 冬季平均氣壓 kPa Ave. pressure in winter 地震 Earthquake 根據(jù)上海市建設(shè)委員會及上海市抗震辦公室的文件規(guī)定, XX 地區(qū)應(yīng)按地震基本烈度 7 度考慮設(shè)防。 According to the document of Shanghai Construction Committee and Shanghai Earthquake Resistance Office, protection shall be set up against 7 degree of earthquake basic intensity in Baoshan area. 防凍措施 Antifreezing measur