【正文】
石家莊鐵道大學(xué)畢業(yè)設(shè)計(jì)橋梁施工臨時(shí)結(jié)構(gòu)設(shè)計(jì)Temporary Structural Design for Bridge Construction2021 屆 土木工程 學(xué)院專 業(yè) 土木工程 學(xué) 號(hào) 學(xué)生姓名 指導(dǎo)教師 完成日期 2021 年 6 月 6 日畢業(yè)設(shè)計(jì)成績(jī)單學(xué)生姓名 學(xué)號(hào) 班級(jí) 專業(yè) 土木工程畢業(yè)設(shè)計(jì)題目 橋梁施工臨時(shí)結(jié)構(gòu)設(shè)計(jì)指導(dǎo)教師姓名指導(dǎo)教師職稱評(píng) 定 成 績(jī)指導(dǎo)教師 得分評(píng)閱人 得分答辯小組組長(zhǎng) 得分成績(jī):院長(zhǎng)(主任) 簽字:年 月 日畢業(yè)設(shè)計(jì)任務(wù)書題 目 橋梁施工臨時(shí)結(jié)構(gòu)設(shè)計(jì)學(xué)生姓名 學(xué)號(hào) 班級(jí) 專業(yè) 土木工程承擔(dān)指導(dǎo)任務(wù)單位 土木工程學(xué)院 導(dǎo)師姓名 導(dǎo)師職稱一、設(shè)計(jì)內(nèi)容運(yùn)用有限元軟件結(jié)合手工計(jì)算,對(duì)掛籃進(jìn)行設(shè)計(jì)計(jì)算并繪制施工詳圖。1. 熟悉懸臂施工和掛籃的類型、特點(diǎn)2. 熟悉有限元軟件并對(duì)菱形掛籃進(jìn)行建模3. 對(duì)掛籃進(jìn)計(jì)計(jì)算4. 數(shù)據(jù)處理、相關(guān)的手算5. 繪圖、成文 二、基本要求 熟練掌握掛籃的設(shè)計(jì)過程,能夠比較熟練的應(yīng)用有限元軟件對(duì)菱形掛籃進(jìn)行模型建立、結(jié)構(gòu)計(jì)算和數(shù)據(jù)的分析處理。完成 1 萬字以上的設(shè)計(jì)說明書一份,繪制不少于 5 張 A3 圖紙( 包含手工繪圖),翻譯與橋梁相關(guān)的外文文獻(xiàn)不少于 3000 漢字。三、技術(shù)指標(biāo)采用菱形掛籃。四、參考文獻(xiàn)1. 橋梁工程 王序森,唐寰澄編著 中國(guó)鐵道出版社 2. 橋梁懸臂施工與設(shè)計(jì) 雷俊卿主編 人民交通出版社 3. 橋梁施工臨時(shí)結(jié)構(gòu)設(shè)計(jì) 陳偉,李明主編 中國(guó)鐵道出版社 20214. 橋梁施工及組織管理 黃繩武主編 人民交通出版社 5. 橋梁懸臂施工與設(shè)計(jì) 雷俊卿主編 人民交通出版社 五、進(jìn)度計(jì)劃第 12 周:收集參考文獻(xiàn),閱讀參考文獻(xiàn),并進(jìn)行英文翻譯,寫出開題報(bào)告,熟悉有限元計(jì)算軟件。第 36 周:菱形掛籃主桁架的設(shè)計(jì)計(jì)算第 710 周:其他細(xì)部結(jié)構(gòu)的設(shè)計(jì)計(jì)算第 1113 周:繪圖、整理、答辯教研室主任簽字 時(shí) 間 年 月 日畢業(yè)設(shè)計(jì)開題報(bào)告題 目 橋梁施工臨時(shí)結(jié)構(gòu)設(shè)計(jì)學(xué)生姓名 學(xué)號(hào) 班級(jí) 專業(yè) 土木工程一、設(shè)計(jì)背景和應(yīng)用現(xiàn)狀1.縱觀人類歷史和社會(huì)的發(fā)展,土木工程行業(yè)的發(fā)展是社會(huì)進(jìn)步的一個(gè)標(biāo)志之一。橋梁建設(shè)的發(fā)展是土木行業(yè)發(fā)展的一個(gè)重要表現(xiàn),但其施工的技術(shù)和質(zhì)量關(guān)乎橋梁建設(shè)的經(jīng)濟(jì)性和安全性,因此橋梁施工臨時(shí)結(jié)構(gòu)的設(shè)計(jì)在施工中得到了重視并且其設(shè)計(jì)方法和手段得到了很大的提高。2.目前,橋梁的施工方法和手段在不斷的發(fā)展和創(chuàng)新。其中,比較常用的橋梁上部結(jié)構(gòu)施工方法總體上分為現(xiàn)場(chǎng)澆筑法和預(yù)制安裝法。具體又分為:固定支架就地澆筑法;懸臂施工法;轉(zhuǎn)體施工法;頂推施工法;逐孔施工法;橫移施工法;提升與浮運(yùn)施工法。各種施工方法都有其優(yōu)缺點(diǎn),但在其他方法不能滿足或耗費(fèi)太大是,首選懸臂施工法并且在國(guó)內(nèi)外許多大橋中都有成功的范例。懸臂施工中最常用的臨時(shí)結(jié)構(gòu)一般為掛藍(lán)施工,如黃河大橋的掛藍(lán)施工,南京賽虹橋的掛藍(lán)施工等。掛藍(lán)的結(jié)構(gòu)類型有三角形,菱形,弓線形,斜線形等,但菱形掛藍(lán)有其獨(dú)特的優(yōu)點(diǎn),在此只研究菱形掛藍(lán)。二、設(shè)計(jì)進(jìn)行的主要工作與任務(wù)1. 熟悉懸臂施工和掛藍(lán)的類型和特點(diǎn);2. 熟悉有限元軟件并對(duì)掛藍(lán)進(jìn)行建模;3. 對(duì)掛藍(lán)進(jìn)行計(jì)算;4. 數(shù)據(jù)處理、相關(guān)的手算;5. 繪圖、成文。三、設(shè)計(jì)所采用的方法和手段1. 采用菱形掛藍(lán);2. 運(yùn)用有限元理論對(duì)掛藍(lán)進(jìn)行計(jì)算與分析;3. 大部分采用手算并與軟件建模分析進(jìn)行復(fù)核;四、設(shè)計(jì)要達(dá)到的預(yù)期結(jié)果和目的1. 掌握橋梁施工臨時(shí)結(jié)構(gòu)設(shè)計(jì)及菱形掛藍(lán)設(shè)計(jì)的總過程和方法;2. 掌握信息收集和外文翻譯的相關(guān)能力;3. 希望對(duì)所學(xué)知識(shí)和技能有一個(gè)全面的提高。指導(dǎo)教師簽字 時(shí) 間 年 月 日畢業(yè)設(shè)計(jì)開題報(bào)告題 目 橋梁施工臨時(shí)結(jié)構(gòu)設(shè)計(jì)學(xué)生姓名 學(xué)號(hào) 班級(jí) 專業(yè) 土木工程五、設(shè)計(jì)要達(dá)到的預(yù)期結(jié)果和目的;;;。六、進(jìn)度計(jì)劃第 12 周:收集參考文獻(xiàn),閱讀參考文獻(xiàn),并進(jìn)行英文翻譯,寫出開題報(bào)告,熟悉有限元計(jì)算軟件;第 36 周:掛籃的設(shè)計(jì)計(jì)算以及施工工藝;第 710 周:掛籃的建模計(jì)算及檢算;第 1113 周:繪圖、整理、答辯。指導(dǎo)教師簽字 時(shí) 間 年 月 日摘 要隨著橋梁建設(shè)的快速發(fā)展,橋梁施工的技術(shù)得到很大提高。懸臂施工在大跨度及其他方法難以實(shí)施的環(huán)境中是經(jīng)常采用的施工的方法,其中以掛籃為臨時(shí)結(jié)構(gòu)的懸臂施工技術(shù)是重要技術(shù)之一。本課題以實(shí)際工程為資料,進(jìn)行優(yōu)化的菱形掛籃設(shè)計(jì)。首先,對(duì)懸臂施工技術(shù)進(jìn)行簡(jiǎn)要說明,并對(duì)各種類型掛籃進(jìn)行比較說明以此選出方案——菱形掛籃,然后根據(jù)菱形掛籃設(shè)計(jì)資料和分析理論進(jìn)行菱形掛籃的設(shè)計(jì)和檢算。主要內(nèi)容包括菱形掛籃的模板系統(tǒng)、主桁系統(tǒng)、吊帶和錨固系統(tǒng)及走形系統(tǒng)的強(qiáng)度、剛度和安全穩(wěn)定進(jìn)行設(shè)計(jì)和檢算。其中利用 midas 有限元軟件進(jìn)行分部建模設(shè)計(jì)計(jì)算和部分進(jìn)行手算與之復(fù)核,應(yīng)用計(jì)算機(jī)輔助軟件 cad 進(jìn)行整套圖紙繪制。關(guān)鍵詞:懸臂施工 菱形掛籃 設(shè)計(jì)與計(jì)算AbstractAlong with the bridge construction39。s fast development, the bridge construction39。s technology has the very big enhancement. The bracket construction in the great span and other methods implement with difficulty in the environment is the construction method which uses frequently, take hangs the basket as the temporary structure bracket construction technique is one of important technical. This topic take the actual project as a material, carries on optimized the diamond to hang the basket design. First, carries on the briefing to the bracket construction technique, and hangs the basket to each type to carry on the parison explanation to select the plan diamond by this to hang the basket, then hangs the basket design information and the analysis theory according to the diamond carries on the diamond to hang basket39。s design and to examine calculated. The primary coverage hangs basket39。s template system, the main spar system, the suspenders and the anchor system including the diamond and loses shape system39。s intensity, the rigidity and safe carries on the design stably and examines calculated. And carries on the branch modelling design calculation and the part using the midas finite element software enters the expert to calculate that reexamines with it, carries on whole set blueprint plan using puter auxiliary software cad. Key word: the bracket construction diamond hangs the basket design and putation目 錄第 1 章 緒論 ........................................................................................................................1 橋梁掛籃施工歷史回顧 ............................................................................................1 橋梁掛籃施工種類與特點(diǎn) ........................................................................................2 掛籃分類及組成 .................................................................................................2 掛籃結(jié)構(gòu)的主要特點(diǎn) .........................................................................................5 掛籃施工的發(fā)展方向 ................................................................................................6 此設(shè)計(jì)所選方案和說明 ............................................................................................7第 2 章 掛籃設(shè)計(jì)資料與計(jì)算原理及內(nèi)容 ........................................................................8 菱形掛籃的設(shè)計(jì)資料 ................................................................................................8 掛籃的結(jié)構(gòu)設(shè)計(jì)原理和檢算內(nèi)容 ............................................................................8 結(jié)構(gòu)設(shè)計(jì) .............................................................................................................9 結(jié)構(gòu)檢算 .............................................................................................................9第 3 章 掛籃模板系統(tǒng)設(shè)計(jì)與計(jì)算 ..................................................................................11 底模系統(tǒng) ..................................................................................................................11 荷載分析 ...........................................................................................................11 底模設(shè)計(jì)與檢算 ...............................................................................................11 側(cè)模系統(tǒng)設(shè)計(jì)與檢算 ..............................................................................................25 下部側(cè)模設(shè)計(jì)與檢算 .......................................................................................25 上部側(cè)模設(shè)計(jì)與檢算 .......................................................................................32 內(nèi)膜系統(tǒng)設(shè)計(jì)與檢算 ..........