freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

tisco二期擴(kuò)建工程項(xiàng)目總承包(epc)合同 中英文-文庫(kù)吧

2024-12-19 17:06 本頁(yè)面


【正文】 供貨;廠房、設(shè)備基礎(chǔ)、管網(wǎng)的施工;設(shè)備的安裝、調(diào)試;人員培訓(xùn);各主生產(chǎn)線的試車(chē)、試生產(chǎn);投產(chǎn);驗(yàn)收交付。 The Contractor will employ Vietnam Subcontractor to undertake the works of detailed geological survey and carry out the foundation treatment (Unit price and norm according to Vietnam construction standard). If the total Subcontract price plus the contractor’s management fee do not exceed the amount of 3,265,200 USD which is specified and assigned to such works under Contract, the Contractor will bear the responsibility。 otherwise, the additional cost shall be borne by the Employer. The Employer is entitled to inspect the Subcontract for technical and financial conditions. 承包商如要雇傭越南分包商來(lái)承擔(dān)地質(zhì)勘測(cè)和基礎(chǔ)工作(單價(jià)根據(jù)越南建筑標(biāo)準(zhǔn))在總分包合同價(jià)格加管理費(fèi)未超過(guò)合同中規(guī)定此工作價(jià)款3,265,200 USD時(shí)由承包商負(fù)責(zé),超過(guò)部分由雇主承擔(dān)。雇主有權(quán)對(duì)分包商的技術(shù)和財(cái)務(wù)狀況進(jìn)行監(jiān)控。 CONTENTS INDEX FOR TECHNICAL APPENDIX技術(shù)附件目錄 The package of TISCO second revamping and expansion project is divided into 8 sub packages corresponding with 8 technical appendixes. TISCO二期擴(kuò)建工程根據(jù)各主要生產(chǎn)線劃分為8個(gè)分包標(biāo)段,其技術(shù)附件也相應(yīng)是8個(gè)技術(shù)附件。 1) Technical appendix I of EPC Contract document for the second stage revamping and expansion project of TISCO, (raw material yard project)。 TISCO二期擴(kuò)建工程EPC 合同 技術(shù)附件I(原料場(chǎng)工程); 2) Technical appendix II of EPC Contract document for the second stage revamping and expansion project of TISCO, (sintering project)1) TISCO二期擴(kuò)建工程EPC合同 技術(shù)附件Ⅱ(燒結(jié)工程); 3) Technical appendix III of EPC Contract document for the second stage revamping and expansion project of TISCO, (coke making project) TISCO二期擴(kuò)建工程EPC合同技術(shù)附件Ⅲ(煉焦工程) 4) Technical appendix IV of EPC Contract document for the second stage revamping and expansion project of TISCO, (iron making project) TISCO二期擴(kuò)建工程EPC合同 技術(shù)附件Ⅳ(煉鐵工程) 5) Technical appendix V of EPC Contract document for the second stage revamping and expansion project of TISCO, (steel making amp。 CCM project),. TISCO二期擴(kuò)建工程EPC合同 技術(shù)附件Ⅴ(煉鋼連鑄程); 6) Technical appendix VI of EPC Contract document for the second stage revamping and expansion project of TISCO, (oxygen generating project). TISCO二期擴(kuò)建工程EPC合同 技術(shù)附件Ⅵ(制氧工程); 7) Technical appendix VII of EPC Contract document for the second stage revamping and expansion project of TISCO, (utilities project).TISCO二期擴(kuò)建工程EPC合同 技術(shù)附件Ⅶ(廠區(qū)二期公輔設(shè)施工程); 8) Technical appendix VIII of EPC Contract document for the second stage revamping and expansion project of TISCO, (general layout and transportation, roads, railways amp。 facilities),. TISCO二期擴(kuò)建工程EPC合同 技術(shù)附件Ⅷ(廠區(qū)二期總圖運(yùn)輸、道路、鐵路及設(shè)施工程) . 2. WORKING SCOPE OF CONTRACTOR承包商工作范圍 According to the contents of 01 EPC package, the work scope of contractor is as the follows:按照01 EPC合同內(nèi)容,承包商工作范圍如下: NEWLY CONSTRUCTED RAW FMATERIAL YARD 新建原料場(chǎng) Raw material yard is posed of a raw material piling yard and a material evenly blending yard, utility and auxiliary facilities, which undertakes the plex jobs such as materials receiving amp。 unloading, storing, evenly blending for concentrated fine ore, coal, lump ore, flux, fuels etc. and directly deliver qualified material, fuel used for sintering, coke making and iron making. All above mentioned ining materials should have qualified particle size and there will be no sizing facilities in the plant.原料車(chē)間設(shè)有原料堆場(chǎng)及混勻料場(chǎng)。其承擔(dān)著燒結(jié)、焦化、高爐所用的精礦粉、煤、塊礦、熔劑、燃料等的受卸、儲(chǔ)存、混勻及將燒結(jié)、焦化、煉鐵所需合格原、燃料直接輸出等綜合作業(yè)及其配套的公輔設(shè)施,無(wú)需磨準(zhǔn)器。 SINTERING ENGINEERING燒結(jié)工程 In order to meet the requirements for producing 500,000t/a casting billets for the TISCO second stage revamping and expansion project, one set of 550m3 blast furnace and the matched one set of 100m2 sintering machine as well as corresponding utilities shall be built up. 為滿(mǎn)足TISCO二期擴(kuò)建項(xiàng)目500,000t/a連鑄坯規(guī)模要求,新建1臺(tái)500m3高爐,為此配套建設(shè)1臺(tái)100m2燒結(jié)機(jī)及其配套的公輔設(shè)施。 The grade of the sintering ore shall be 55% Fe content, and the capacity of sintering ore shall be 981,000t/a to meet the requirements for sintering ore by the blast furnace. 燒結(jié)礦含鐵品位為56%,燒結(jié)礦生產(chǎn)能力為981,000t/a,滿(mǎn)足高爐所需燒結(jié)礦的要求。 COKE MAKING ENGINEERING煉焦工程 One set of 45battery coke oven with the capacity of 300,000 t/a metallurgical coke and byproducts recovery system as well as matched utilities will be newly built.新建一臺(tái)年生產(chǎn)干焦炭300,000t/a的45-battery焦?fàn)t及其副產(chǎn)品回收系統(tǒng)、配套的公輔系統(tǒng)。 IRON MAKING ENGINEERING 煉鐵工程 One set of 550m3 blast furnace will be built up newly to supply hot metal required for steel making by converter, in order to reach the target of producing 500,000t/a casting billets annually. 新建一座500M3高爐,為煉鋼轉(zhuǎn)爐年產(chǎn)500,000T/A連鑄坯提供所需鐵水。 Iron making engineering includes one set of 550m3 blast furnace, pig cast machine, coal injection system, oxygen enrichment blowing system, mud mill, repairing facilities of hot metal ladles, and matched utilities. Annual output of hot metal will be 543,200tons. 煉鐵工程包括:一座500m3高爐、鑄鐵機(jī)、噴煤系統(tǒng)、富氧噴吹系統(tǒng)、碾泥機(jī)、鐵水罐維修等輔助設(shè)施及其配套的公輔設(shè)施。年產(chǎn)鐵水580,000t/a。 STEEL MAKING amp。 CONTINUOUS CASTING ENGINEERING煉鋼連鑄工程 Main process equipment for the newly built steel making converter and continuous casting engineering are as follows: one set of 600t mixer, one set of 50t LD converter, and one set of 55t LF refining furnace, one set of R8m fourstrandcaster, as well as matched utilities and auxiliary facilities. Annual production capacity of continuous caster is 500,000tons billets. 新建煉鋼轉(zhuǎn)爐連鑄工程,主要工藝設(shè)備為:一座600t混鐵爐、一一座50tLD轉(zhuǎn)爐、一臺(tái)55tLF鋼包精煉爐、一臺(tái)R8m 4機(jī)4流方坯連鑄機(jī)及其配套的公輔設(shè)施。年生產(chǎn)能力為500,000t/a連鑄坯。 OXYGEN GENERATING PROJECT制氧車(chē)間
點(diǎn)擊復(fù)制文檔內(nèi)容
合同協(xié)議相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1