tisco二期擴建工程項目總承包(epc)合同 中英文-文庫吧

2024-12-19 17:06 本頁面


【正文】 供貨;廠房、設備基礎、管網的施工;設備的安裝、調試;人員培訓;各主生產線的試車、試生產;投產;驗收交付。 The Contractor will employ Vietnam Subcontractor to undertake the works of detailed geological survey and carry out the foundation treatment (Unit price and norm according to Vietnam construction standard). If the total Subcontract price plus the contractor’s management fee do not exceed the amount of 3,265,200 USD which is specified and assigned to such works under Contract, the Contractor will bear the responsibility。 otherwise, the additional cost shall be borne by the Employer. The Employer is entitled to inspect the Subcontract for technical and financial conditions. 承包商如要雇傭越南分包商來承擔地質勘測和基礎工作(單價根據越南建筑標準)在總分包合同價格加管理費未超過合同中規(guī)定此工作價款3,265,200 USD時由承包商負責,超過部分由雇主承擔。雇主有權對分包商的技術和財務狀況進行監(jiān)控。 CONTENTS INDEX FOR TECHNICAL APPENDIX技術附件目錄 The package of TISCO second revamping and expansion project is divided into 8 sub packages corresponding with 8 technical appendixes. TISCO二期擴建工程根據各主要生產線劃分為8個分包標段,其技術附件也相應是8個技術附件。 1) Technical appendix I of EPC Contract document for the second stage revamping and expansion project of TISCO, (raw material yard project)。 TISCO二期擴建工程EPC 合同 技術附件I(原料場工程); 2) Technical appendix II of EPC Contract document for the second stage revamping and expansion project of TISCO, (sintering project)1) TISCO二期擴建工程EPC合同 技術附件Ⅱ(燒結工程); 3) Technical appendix III of EPC Contract document for the second stage revamping and expansion project of TISCO, (coke making project) TISCO二期擴建工程EPC合同技術附件Ⅲ(煉焦工程) 4) Technical appendix IV of EPC Contract document for the second stage revamping and expansion project of TISCO, (iron making project) TISCO二期擴建工程EPC合同 技術附件Ⅳ(煉鐵工程) 5) Technical appendix V of EPC Contract document for the second stage revamping and expansion project of TISCO, (steel making amp。 CCM project),. TISCO二期擴建工程EPC合同 技術附件Ⅴ(煉鋼連鑄程); 6) Technical appendix VI of EPC Contract document for the second stage revamping and expansion project of TISCO, (oxygen generating project). TISCO二期擴建工程EPC合同 技術附件Ⅵ(制氧工程); 7) Technical appendix VII of EPC Contract document for the second stage revamping and expansion project of TISCO, (utilities project).TISCO二期擴建工程EPC合同 技術附件Ⅶ(廠區(qū)二期公輔設施工程); 8) Technical appendix VIII of EPC Contract document for the second stage revamping and expansion project of TISCO, (general layout and transportation, roads, railways amp。 facilities),. TISCO二期擴建工程EPC合同 技術附件Ⅷ(廠區(qū)二期總圖運輸、道路、鐵路及設施工程) . 2. WORKING SCOPE OF CONTRACTOR承包商工作范圍 According to the contents of 01 EPC package, the work scope of contractor is as the follows:按照01 EPC合同內容,承包商工作范圍如下: NEWLY CONSTRUCTED RAW FMATERIAL YARD 新建原料場 Raw material yard is posed of a raw material piling yard and a material evenly blending yard, utility and auxiliary facilities, which undertakes the plex jobs such as materials receiving amp。 unloading, storing, evenly blending for concentrated fine ore, coal, lump ore, flux, fuels etc. and directly deliver qualified material, fuel used for sintering, coke making and iron making. All above mentioned ining materials should have qualified particle size and there will be no sizing facilities in the plant.原料車間設有原料堆場及混勻料場。其承擔著燒結、焦化、高爐所用的精礦粉、煤、塊礦、熔劑、燃料等的受卸、儲存、混勻及將燒結、焦化、煉鐵所需合格原、燃料直接輸出等綜合作業(yè)及其配套的公輔設施,無需磨準器。 SINTERING ENGINEERING燒結工程 In order to meet the requirements for producing 500,000t/a casting billets for the TISCO second stage revamping and expansion project, one set of 550m3 blast furnace and the matched one set of 100m2 sintering machine as well as corresponding utilities shall be built up. 為滿足TISCO二期擴建項目500,000t/a連鑄坯規(guī)模要求,新建1臺500m3高爐,為此配套建設1臺100m2燒結機及其配套的公輔設施。 The grade of the sintering ore shall be 55% Fe content, and the capacity of sintering ore shall be 981,000t/a to meet the requirements for sintering ore by the blast furnace. 燒結礦含鐵品位為56%,燒結礦生產能力為981,000t/a,滿足高爐所需燒結礦的要求。 COKE MAKING ENGINEERING煉焦工程 One set of 45battery coke oven with the capacity of 300,000 t/a metallurgical coke and byproducts recovery system as well as matched utilities will be newly built.新建一臺年生產干焦炭300,000t/a的45-battery焦爐及其副產品回收系統(tǒng)、配套的公輔系統(tǒng)。 IRON MAKING ENGINEERING 煉鐵工程 One set of 550m3 blast furnace will be built up newly to supply hot metal required for steel making by converter, in order to reach the target of producing 500,000t/a casting billets annually. 新建一座500M3高爐,為煉鋼轉爐年產500,000T/A連鑄坯提供所需鐵水。 Iron making engineering includes one set of 550m3 blast furnace, pig cast machine, coal injection system, oxygen enrichment blowing system, mud mill, repairing facilities of hot metal ladles, and matched utilities. Annual output of hot metal will be 543,200tons. 煉鐵工程包括:一座500m3高爐、鑄鐵機、噴煤系統(tǒng)、富氧噴吹系統(tǒng)、碾泥機、鐵水罐維修等輔助設施及其配套的公輔設施。年產鐵水580,000t/a。 STEEL MAKING amp。 CONTINUOUS CASTING ENGINEERING煉鋼連鑄工程 Main process equipment for the newly built steel making converter and continuous casting engineering are as follows: one set of 600t mixer, one set of 50t LD converter, and one set of 55t LF refining furnace, one set of R8m fourstrandcaster, as well as matched utilities and auxiliary facilities. Annual production capacity of continuous caster is 500,000tons billets. 新建煉鋼轉爐連鑄工程,主要工藝設備為:一座600t混鐵爐、一一座50tLD轉爐、一臺55tLF鋼包精煉爐、一臺R8m 4機4流方坯連鑄機及其配套的公輔設施。年生產能力為500,000t/a連鑄坯。 OXYGEN GENERATING PROJECT制氧車間
點擊復制文檔內容
合同協(xié)議相關推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1