freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內容

工程建筑裝飾工程施工工程合同英文版contractfordecorationproject-閱讀頁

2025-05-29 08:21本頁面
  

【正文】 entations and pletion acceptance report. Party A shall organize the acceptance within 5 day after receiving all the documents. When Party A can not conduct the acceptance within the time specified in the Contract, Party A shall inform Party B without delay and determine another date for the acceptance. Party A, however, shall admit the pletion date of the Decoration Project and be liable for the expenses for taking care of the construction by Party B and other relevant expenses.6. Contract Prices amp。shallto have been given. The final payment shall be made within / days.7. Material supplies Party A is in charge of purchasing the supplied materials and equipments (refer to Annex). The materials shall be qualified and meet the design requirements, and be delivered to the scene in time. If Party B is responsible for picking up the materials, Party A shall hand over delivery documents to Party B and let Party B bear the transportation expense. Party A shall be responsible for the damages to the project caused by quality problems or specification differences of the materials and equipment supplied by Party A. Party B is responsible for storage of materials provided by Party A, and Party A shall pay / % of the material value as the storage fee. Party B shall be responsible for the pensation associated with the loss caused by improper storage of Party B. byB:materialsequipmentbyBdomeetdesignconstructionareIf the materials have been used, the loss caused shall be assumed by Party B.8. Safe Production and Fire Regulations Construction drawings provided by Party A or practice that should ply with the fire regulations of the People39。s court in the absence of an arbitration clause in the contract or in the absence of a written arbitration agreement concluded afterwards.11. Final Clauses12. Supplementary Provisions Project quality warranty or insurance shall be settled by both parties through concluding agreement. This contract will be printed and signed in duplicate and each party shall keep 1 copy. This Contract shall automatically terminate and expire upon the full performance Annex(1) Construction drawings or instructions (2) Project schedule(3) Project budget statement (4) List of materials provided by Party A(5) Meeting minutes(6) Design changes(7) OthersParty A (Stamp): Party B (Stamp
點擊復制文檔內容
規(guī)章制度相關推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1