【正文】
ea (m2) Average depth of soft soil (m) Bearing Capacity of foundation soil (t/m2) Interval of vertical drains (m) Treatment Depth (m) Estimated Settlement (m) 1 28254 * _______________ 25286 5 10 2 41428* _______________ 37450 5 10 3 54313 * ________________ 49603 5 10 Note: 1) “ * ” : the numerator indicates the proposed process area, which is extended from the area specified in the tender documents (denominator). The edge of the specified area is extended by m. 2) The length of vertical drains = treatment depth + sand bed thickness ( ) + end margin () = . Geotechnical design of preloading method in general area Average depth of soft Interval of vertical Single films drainage 中國(guó)最大的管理資源中心 第 9 頁(yè) 共 10 頁(yè) Scheme general Area (m2) soil (m) drains (m) Treatment Depth (m) Estimated settlement (m) 1 110934 2 98770 3 88617 Note: The length of vertical drains = treatment depth + sand bed thickness ( ) + end margin () = . 中國(guó)最大的管理資源中心 第 10 頁(yè) 共 10 頁(yè) Geotechnical design of vacuum prepression method of general area Scheme Process Area (m2) Average depth of soft soil (m) Interval of vertical drains (m) Double films drainage Single films drainage Depth of vertical drains (m) Calculated Final consolidation settlement (m) Depth of vertical drains (m) Calculated Final consolidation settlement (m) 1 110934 / () 2 98770 3 88617 Note: The length of vertical drains = soft soil depth + sand bed thickness ( ) + end margin () = . 。 f = 100 Kpa, vacuum prepression pound with loading method. The hydraulic filling of sea sand should be adopted under the elevation +, which is specified in the tender documents. But based on our site investigation report, we propose to use sweet water sand instead of sea sand for these following reasons: Proposed Design Philosophy, Construction, Installation and Monitoring Method As per of Section of ITB 2 2 (1) Fine grade and high mud content of the sea sand。 Proposed Design Philosophy, Construction, Installation and Monitoring Method As per of Section of ITB 1 1 Proposed Design Philosophy, Construction, Installation and Monitoring Method ( as per of section ) 1. Source of borrows pit indicating the location and quantity We have license given by Vietnam authority to exploit a quantity of 8, 400,000 m3 in Nha Be river and the location is in Nhon Trach district, Dong Nai province. 2. Physical proprieties of proposed fill material The sampling test of sand proposed to use is carried out