【正文】
updated Marketing strategy document (including mitted revenue/volume)delivered Manufacturing and assembly plan (includes facilities and tooling inv.) approved Single appearance theme for final development selected Reliability and robustness demonstration plan for priority systems pleted Component ( enditem) Design Specifications (CDS) patible with program objectives Enditem / ponent target agreements signed Program technology application report pleted Program specific FMEA’ s pleted Subsystem Level 2 enditem /ponent Design Verification Plans (DVP’ s) pleted Final Prototype Plan for AP2, AP3, CP prototype vehicle builds pleted Program Parts List (PPL), including service parts, pleted ?All targets(. function, cost, etc.)bee objectives and are patible 10 (ST) Surface Transfer (Interior/Exterior Surface Provided) Adequacy of post (ST) resources verified and staffing issues resolved Design Manufacturing and Assembly Readiness (DMAR) patibility pleted: — Interior/Exterior Class IA surfaces transferred to eng./manuf.(+/ mm) — All hardpoints frozen Campaign prevention” Deep Dive” Review (of engineering disciplines)pleted ?Powertrain design (including P/T control system strategy) pleted 11 PRProduct Readiness (Designs Ready for CP Builds) Adequacy of post PRresources verified and staffing issues resolved Package patibility (interference, service, assembly, occupant/cargo) issues resolved Analytical signoff of vehicle performance versus requirements and specifications ?Management drive analytical evaluation of attribute performance vs. objectives pleted ?Last Class I surface for major formed parts verified/released ?All 3dimensional data is pleted ?Final launch plan is confirmed and issued 12 (CP)Confirmation Prototype (First CP Vehicle Available) Adequacy of post (CP) resources verified and staffing issues resolved Process FMEA for all or modified processes/tools pleted First CP vehicle (available for deliver) pleted Final Engineering Release (all end items/ ponents released at “ P” (production)authority by 17 MBJ1 For S5 Program ?Campaign prevention “ fresh Eyes” pleted ( MBJ1 for S5 program) 13 CC Change Cutoff (Commitment to Job1 Timing) Adequacy of post C