【正文】
AS PER ATTACHED TECHNICAL AGREEMENT SIGNED BETWEEN BUYER AND SELLER ON March 1st ,2006.TOTAL VALUE: SAY CIF NINGBO BY SEA IN USD ONE HUNDERED EIGHTY FIVE THAUSAND ONLY2. Country of Origin and Manufacturer: Norway/ A/S3. Time of Shipment: Before Nov 20st, 20094. Place of Shipment: Main European Port5. Place of Destination: Ningbo Seaport, China6. Shipping Mark:The sellers shall mark on each packages with fadeless paint the package number, gross weight, net weight, measurements, shipping mark and the words: “keep away from moisture”, “Handle with care”, “This side up”, ect. Or other generally adopted symbols. In the case of dangerous and /or poisonous cargo (es) and the generally adopted symbols shall be marked conspicuously on each package. The shipping mark shall be:Hull No.: DH2002Contract No.: DH2002GPA2540202NoZhejiang Shipbuilding Co., Ltd.7. PackingTo be packed in new seaworthy strong wooden case(s) or in container or in cartons as per international packing standard, suitable for long distance Sea/ Air freight transportation/parcel post and change of climate, well protected against dampness, moisture, rust, shocks and rough handling, protected for a period of six months from date of shipment.The Sellers shall be liable for any damage of the modity and expenses occurred on account of improper packing and for any rust attributable to inadequate or improper protective measures taken by the Sellers in regard to the packing, in which case they shall rectify the transport damage and in case of corrosion, reimburse the Buyer for relating expenses incurred up to an amount the Seller would have incurred the remedial action been taken by himself at his premises.It is Buyer’s responsibility to check packing and preservation. In case Buyer bees aware of damages of packing and preservation or period of preservation has been elapsed he shall inform Seller without undue delay。 Otherwise Seller is released from its warranty obligations.With the engine package, the lifting device should be delivered which shall remain property of Seller and be returned DDU Seller’s premises in due time after installation of the engine.Following documents shall be enclosed in each package:Detail packing list in 2 copies issued by the Manufacturers/ Seller indicating the number, content, measurement, net and gross weight of each package.8. Insurance:To be covered by the Sellers for 110% of Delivered Goods Value.9. Payment:As per the attachment 1 of this contract.10. Documents:1) 3 original mercial invoice and 3 copies indicating sold to Evergreen industries group, indication contract number L/C number and shipping mark mad out in details as per the related contract.The sellers should supply an additional set of original mercial invoice to Zhejiang Shipbuilding Co., Ltd.2) Bill of Lading2/3 sets of on board ocean bills of lading in original and copies marked “Freight Prepaid” made out to order, blank endorsed, n