【正文】
(4)、熱處理車間、裝配車間、機(jī)修車間、鍋爐房、倉(cāng)庫(kù)正常的工作電流Ig=,是戶內(nèi)布置的斷路器,型號(hào)是:SN1010/1250,其主要技術(shù)參數(shù)如611所示:表611 SN1010/1250斷路器技術(shù)參數(shù)額定工作電壓(KV)額定工作電流(A)額定開(kāi)端電流(KA)動(dòng)穩(wěn)定電流(KA)熱穩(wěn)定電流(KA)額定熱穩(wěn)定時(shí)間(S)10125040125404隔離開(kāi)關(guān)(1)、鑄造車間、鍛壓車間:正常的工作電流為:I=,是戶內(nèi)布置的隔離開(kāi)關(guān),型號(hào)是:GN610/1250,其主要技術(shù)參數(shù)如612所示:表612 GN610/1250隔離開(kāi)關(guān)技術(shù)參數(shù)額定工作電壓(KV)額定工作電流(A)極限通過(guò)電流峰值(KA)熱穩(wěn)定電流(KA)熱穩(wěn)定時(shí)間(S)配用操動(dòng)機(jī)構(gòu)型號(hào)10125075434CS61T(2)、金工車間、工具車間正常工作電流為:I=,是戶內(nèi)布置的隔離開(kāi)關(guān),型號(hào)是GNS10/1000,其主要技術(shù)參數(shù)如613所示:表613 GNS10/1000隔離開(kāi)關(guān)技術(shù)參數(shù)額定工作電壓(KV)額定工作電流(A)極限通過(guò)電流峰值(KA)熱穩(wěn)定電流(KA)熱穩(wěn)定時(shí)間(S)配用操動(dòng)機(jī)構(gòu)型號(hào)10100075435CS61T(3)、電鍍車間、生活區(qū)正常的工作電流I=,是戶內(nèi)布置的隔離開(kāi)關(guān),型號(hào)是:GN1010/1250,其主要技術(shù)參數(shù)如614所示:表614 GN610/1250隔離開(kāi)關(guān)技術(shù)參數(shù)額定工作電壓(KV)額定工作電流(A)極限通過(guò)電流峰值(KA)熱穩(wěn)定電流(KA)熱穩(wěn)定時(shí)間(S)配用操動(dòng)機(jī)構(gòu)型號(hào)10100075435CS61T(4)、熱處理車間、裝配車間、機(jī)修車間、鍋爐房、倉(cāng)庫(kù)正常的工作電流Ig=,是戶內(nèi)布置的隔離開(kāi)關(guān),型號(hào)是:SN1010/1250,其主要技術(shù)參數(shù)如615所示:表615 SN610/1250隔離開(kāi)關(guān)技術(shù)參數(shù)額定工作電壓(KV)額定工作電流(A)極限通過(guò)電流峰值(KA)熱穩(wěn)定電流(KA)熱穩(wěn)定時(shí)間(S)配用操動(dòng)機(jī)構(gòu)型號(hào)10100075435CS61T第7章 主變壓器繼電保護(hù) 繼電保護(hù)裝置當(dāng)電力系統(tǒng)中的電力元件或電力系統(tǒng)本身發(fā)生了故障危及電力系統(tǒng)安全運(yùn)行時(shí),能夠向運(yùn)行值班人員及時(shí)發(fā)出警告信號(hào),或者直接向所控制的斷路器發(fā)出跳閘命令以終止這些事件發(fā)展的一種自動(dòng)化措施和設(shè)備。 保護(hù)作用對(duì)于高壓側(cè)位110KV的工廠總降壓變電所主變壓器來(lái)說(shuō),應(yīng)該裝有瓦斯保護(hù)、過(guò)流保護(hù)和電流速斷保護(hù)。裝設(shè)過(guò)流保護(hù) 采用GL15型感應(yīng)式過(guò)電流繼電器,兩相兩繼電器式接線,去分流跳閘的操作方式。速斷電流的整定I=Ik2=I=I/=故速斷電流倍數(shù)整定為K=第8章 防雷保護(hù)和接地裝置設(shè)計(jì)在變電所屋頂裝設(shè)避雷針或避雷帶,并引出兩根接地線與變電所公共接地裝置相連。如果變電所處在其它建筑物的直擊雷防護(hù)范圍內(nèi)時(shí),則可不另設(shè)獨(dú)立避雷針。通常采用36根長(zhǎng)、的鋼管,在裝設(shè)避雷針的桿塔附近作一排或多邊形排列,管間距離5m,打入地下。引下線用的鍍鋅扁鋼,下與接地體焊接相連,并與裝避雷針的桿塔及其基礎(chǔ)內(nèi)的鋼筋相焊接,上與避雷針焊接相連。獨(dú)立避雷針的接地裝置與變電所公共接地裝置應(yīng)有3m以上距離。引下線采用的鍍鋅扁鋼,下與公共接地網(wǎng)焊接相連,上與避雷針接地端螺栓連接。主變壓器主要靠避雷器來(lái)保護(hù),防護(hù)雷電侵入波的危害。 接地裝置。(1)、確定接地電阻值 查表,此變電所的公共接地裝置的接地電阻應(yīng)滿足以下條件 因此公共接地裝置接地電阻。管間用40mm4mm的鍍鋅扁鋼焊接相連。結(jié)論本次畢業(yè)是對(duì)紡織廠供配電系統(tǒng)的設(shè)計(jì),通過(guò)完成負(fù)荷計(jì)算 、主接線設(shè)計(jì)、電源進(jìn)線及工廠高壓配電線路的設(shè)計(jì)、短路計(jì)算、高低壓電氣設(shè)備選擇、變電站幾點(diǎn)保護(hù)和防雷接地,使得一個(gè)完成的工廠供配電系統(tǒng)呈現(xiàn)在我們的面前??偨Y(jié)與體會(huì)經(jīng)過(guò)幾周的奮戰(zhàn)我的畢業(yè)設(shè)計(jì)終于完成了。畢業(yè)設(shè)計(jì)不僅是對(duì)前面所學(xué)知識(shí)的一種檢驗(yàn),而且也是對(duì)自己能力的一種提高。自己要學(xué)習(xí)的東西還太多,以前老是覺(jué)得自己什么東西都會(huì),什么東西都懂,有點(diǎn)眼高手低。在這次畢業(yè)設(shè)計(jì)中也使我們的同學(xué)關(guān)系更進(jìn)一步了,同學(xué)之間互相幫助,有什么不懂的大家在一起商量,聽(tīng)聽(tīng)不同的看法對(duì)我們更好的理解知識(shí),所以在這里非常感謝幫助我的同學(xué)。最后終于做完了有種如釋重負(fù)的感覺(jué)。在此要感謝我的指導(dǎo)老師對(duì)我悉心的指導(dǎo),感謝老師給我的幫助。在整個(gè)設(shè)計(jì)中我懂得了許多東西,也培養(yǎng)了我獨(dú)立工作的能力,樹(shù)立了對(duì)自己工作能力的信心,相信會(huì)對(duì)今后的學(xué)習(xí)工作生活有非常重要的影響。雖然這個(gè)設(shè)計(jì)做的也不太好,但是在設(shè)計(jì)過(guò)程中所學(xué)到的東西是這次畢業(yè)設(shè)計(jì)的最大收獲和財(cái)富,使我終身受益。致謝本次設(shè)計(jì)是在XX老師的精心指導(dǎo)下完成的,X老師學(xué)識(shí)淵博,做事認(rèn)真細(xì)心,在整個(gè)過(guò)程之中積極督促我們完成自己的畢業(yè)設(shè)計(jì)。對(duì)于我們?cè)谠O(shè)計(jì)中出現(xiàn)的問(wèn)題趙老師都及時(shí)的指出,并且給予耐心的指導(dǎo)。在此對(duì)于趙老師的教導(dǎo)表示衷心的感謝! 還要感謝每天都跟我一起在圖書館進(jìn)行畢業(yè)設(shè)計(jì)的同學(xué)們,我們一起研究,相互幫助,相互學(xué)習(xí),遇到問(wèn)題大家一起解決。同時(shí)也要感謝我的大學(xué)是它給我提供了這么好的學(xué)習(xí)環(huán)境,以及大學(xué)里面給以我諄諄教導(dǎo)的老師們,是他們無(wú)私將知識(shí)傳授給我。本文引用了數(shù)位學(xué)者的研究文獻(xiàn),如果沒(méi)有各位學(xué)者的研究成果的幫助和啟發(fā),我將很難完成本篇論文的寫作。由于我的學(xué)術(shù)水平有限,所寫論文難免有不足之處,懇請(qǐng)各位老師批評(píng)和指正。[3][5][7](第一版).t consider that it39。 , s Iamp。 table on problem . It brings out optimized isolation and resume plan, realizes auto isolation and network reconstruction, reduces the power off range and time and improves the reliability of electric power supply through problem self diagnoses and selfanalysis. It also introduces software flow and use for problem judgement and sets a model on network reconstruction and puter flow.Thirdly, electricity system state is estimated to be one of the key techniques in DA realization. The dissertation remends the resolvent of bad measurement data and structure mistake on the ground of describing state estimate way. It also advances a practical test and judging way on topology mistake in state estimate about bad data test and abnormity in state estimate as well as the problem and effect on bad data from state measure to state estimate .As for real time monitor and control problem, the dissertation introduces a new way to solve them by electricity break and exceptional analysis, and the way has been tested in Weifang DA.Fourthly, about the difficulty for building the model of load forecasting, big parameter scatter limit and something concerned, the dissertation introduces some parameters, eg. weather factor, date type and social environment effect based on analysis of routine load forecasting and means. It presents the way for electricity load forecasting founded on neural network(ANN),which has been tested it’s validity by example and made to be good practical effect.Fifthly, concerning the lack of concordant wave on preve nting concordant wave and nonpower pensation and noncontinuity on pensation, there is a topology structure of PWM main circuit and nonpower theory on active filter the waves technique and builds flat proof on the ground of Saber Designer and proves to be practical. Meanwhile, it analyzes and designs the way of nonpower need of electric network tre nds and decreasing line loss bined with DA, which have been tested its objective economic benefit throu gh counting example.Sixthly, not only do the dissertation design a way founded on the magrginal electric price fitted to our present national electric power market with regards to future trends of electric power market in China and fair trade under the government surveillance, that is group petitio n in shortterm trade under the way of grouped price and quantity harmony, but also puts forward bination arithmetic, math model of trading plan and safty economical restriction. It can solve the original contradiction between medium and long term contract price and short term petitive price with improvement on petitive percentage and cut down the unfair ine difference of electric factory, at the same time, it can optimize the electric limit for all electric factories and reduce the total purchase charge of electric power from burthen curve of whole electric market network.The distribution network is an important link among the power system. Its neutral grounding mode and operation connects security and stability of the power system directly. At the same time, the problem about neutral grounding is associated with national conditions, natural environment, device fabrication and operation. For example, the activity situation of the thunder and lightning, insulating structure and the peripheral interference will influence the cho