freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

任務(wù)書(英文版)-在線瀏覽

2024-09-02 07:11本頁(yè)面
  

【正文】 f main technical standards;Route plan than to choose;Route plane design (draw sketch);Line profile design (draw sketch) roadbed and road surfaceSubgrade crosssectional design;High and subgrade widen design;Earthwork quantity calculation and allocation。 Protection engineering design。 Road drainage design., culverts, tunnel and line crossBridges, culverts, the position of hole number and span length, structural types determine。 Line cross location, form, structure type to determine. (optional)The construction organization design。②Plan view。④The diagrams of straight line, curve and the corner table and so on。② Subgrade crosssections (1km)。④ Subgrade standard crosssections (Hand Drawing)。⑥ Road drainage design。⑧ Pavement structure design and chart.(4) Bridges, culverts, tunnel and line cross①Culvert design(According to the concrete pile number, mark the size)。③Bridge, culvert layout diagram(In the course
點(diǎn)擊復(fù)制文檔內(nèi)容
環(huán)評(píng)公示相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1