【正文】
ucture type to determine. (optional)The construction organization design。 Pavement structure and material design。(3) Roadbed and road surface① Roadbed design table (1km)。②Stereoscopic cross layout(Position,type)。Road Surface Project(3)Highway construction organization and project budget design manual(1)Path(2)Subgrade(3)Pavement(4)Highway small bridge design manual。④Tunnel layout diagram(The route plan and longitudinal profile is shown position)(5) OthersThe facilities along the line , environmental protection engineering plan。③ Earth work quantity calculation sheet (1km)。 Tunnel position determine。 Road drainage design., culverts, tunnel and line crossBridges, culverts, the position of hole number and span length, structural types determine。② Subgrade crosssections (1km)。③Bridge, culvert layout diagram(In the course of longitudinal profile shows position, structure type, hole number and span