freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

化工廠常用pssr檢查表-在線瀏覽

2024-08-10 21:28本頁面
  

【正文】 57.Lighting in panels配電盤里的照明58.Canopies etc. for outdoor panels用于室外配電盤的雨棚等59.Protection settings available?有保護(hù)設(shè)置嗎?60.Panel board schedules配電盤面板清單61.Spare capacity available?有備用容量嗎?62.PPE available? HV mats, gloves有個人防護(hù)用品嗎?有高壓絕緣墊嗎? 有高壓絕緣手套嗎?63.Emergency/Standby power required?有應(yīng)急/備用電源嗎?64.VSD settings available – factory/missioning變頻器設(shè)置—工廠/調(diào)試65.Room access, permitting, maintainability, ingress/egress of equipment房間通道、許可證、可維修性、設(shè)備的進(jìn)出通道66.Pockets for drawings in panels?配電盤的圖紙集67.Voltage warning labels?電壓警告標(biāo)簽 68.Ventilation sufficient?通風(fēng)充足嗎?69.Suitability for area IP rating, GMP suitability, hazardous area classification.區(qū)域適宜性——國際防護(hù)等級、GMP適宜性、危險區(qū)域分類 Relief Devices 泄放設(shè)備70.Are there standard markings on the Pamp。ID圖上有標(biāo)準(zhǔn)代號嗎?71.Do relief lines vent to a safe location?放空線排放到一個安全地點(diǎn)嗎?72.Are relief lines and relief devices secured and adequately sized?放空線和泄放設(shè)備安全嗎?尺寸足夠大嗎?73.Are there any isolation valves which will inhibit operation of relief valves if closed? If YES, nominate Operations to monitor. If NO, record no.有處于關(guān)閉狀態(tài)會抑制放空閥操作的隔離閥嗎?如果有,請指定操作人員對其進(jìn)行監(jiān)視。它能保護(hù)人員和設(shè)備嗎?通道足夠嗎?82.Do safety showers provide a hazard to people (slips), product (contamination of systems), or ingress to electrical switchgear or equipment?安全噴淋對人(滑跤的危險)、產(chǎn)品(系統(tǒng)的污染)或內(nèi)部的電氣開關(guān)柜或設(shè)備產(chǎn)生危險了嗎?83.Are safety showers supplied from tempered water?安全淋浴供應(yīng)熱水嗎?84.Is chemical dosing within a safe proximity of people and product?化學(xué)品操作是在人和產(chǎn)品安全接近范圍內(nèi)嗎?85.Label all pipe lines標(biāo)識所有的管線86.Label all electric switches, disconnects, MCCs, control panels, cables, etc.標(biāo)記所有的電氣開關(guān)、中斷器、電動機(jī)控制器、控制盤和電纜87.Label vessels (material, hazard warnings)List:標(biāo)記容器(材料、危險警告)的清單88.Seal wall penetrations密封墻壁的滲透89.Pour conduit seals灌注導(dǎo)管的密封90.Install fire extinguishers91.Evacuation routes posted92.Install appropriate area signs93.Is all scaffolding and equipment removed。 DateCategory A Action Items Items to be pleted BEFORE authorization and startup1.2.3.4.5.Category B Action Items Items to be pleted AFTER startup1.2.3.4.5.6.7.8.9.10.11.12.Sign below only when all punch list “before startup” items are pletedAuthorized:Facility/Equipment Owner Signature:Date PSSR ITEM NO.CATEGORY/ITEM TO ASSESSNotApplicableGENERAL SAFETYHave ALL appropriate personnel (Operations, Maintenance, Technical, and Supervision) received adequate and appropriate training on the equipment and operating procedures?Has adequate and appropriate PPE (Personal Protective Equipment) been specified in the Work Procedures and/or Standard Operating Procedures. Has the PPE been provided?Have the PPE users been trained in the use of the PPE? Is the training documented?Have measures been taken to adequately guard all dangerous parts of this equipment? Has sufficient provision been made for the electrical and/or mechanical isolation of the equipment?Are points of isolation clearly marked/labeled and readily accessible?Have bump/trip hazards been properly identified and adequately marked? Have all sharp edges been removed?Has proper guarding, handrails/barriers, been provided to prevent falls?Have all hot/cold surfaces been adequately guarded to prevent burns? Are all cold surfaces adequately insulated to prevent condensation drips (slip hazards)?Are Safety Showers and Eye Wash facilities provided and adequately marked? Are the Safety Showers and Eye Wash facilities routinely inspected?Do the Safety Showers and Eye Wash facilities locations ply with Corporate guidelines?Are the Safety Showers and Eye Wash facilities readily visible and accessible? Has sufficient lighting been provided so that operation, servicing, maintenance, and repair of the facilities can be carried out safely?Are notices, dials, screens, etc. for providing operational instructions, safety warnings, and emergency information provided, if required, and positioned so that they are clearly visible and easily read? Have all overhead fixtures, for example, pipehangers, pipe sleeves, pipe sleeve covers, valve handles, floor opening covers, etc., which could fall or be dislodged, been properly secured?Are all of the applicable Work Permit Procedures (Confined Space Entry, Lock Out/Tag Out, Hot Work, High Work, etc.) in place? Have the Operating, Maintenance, and Supervisory personnel been properly trained on the Work Permit Procedures? Has the fire protection systems been inspected by the insurance pany?Has acceptance testing been pleted and documented?Is there an agreed on test and inspection program for the fire protection systems (including alarm systems)?MACHINERY/EQUIPMENT SAFETYHas the machinery/equipment been installed so that it will be stable and secure during operation?Has all access to dangerous moving parts, or danger zones created by the equipment, been prevented by the provision of the correct guards, interlocks (both safety amp。, feet on floor.)Does the operation of this equipment increase the risk of Upper Limb Disorder。IDs) been documented/updated?Have the remendations from safety reviews, Process Hazards Analysis (PHA), Hazards and Operability Reviews (HAZOP), CHAZOP, or others, been implemented? Record any inplete items.Are all relief devices shown on the Pamp。IDs?Have the pressure relief device calculations been provided?Was DIERS technology utilized to size the pressure relief devices for all pressure vessels?Does the sizing of pressure relief devices agreed with the calculated sizes?Do the calculations take into the downstream piping?Do the reli
點(diǎn)擊復(fù)制文檔內(nèi)容
教學(xué)課件相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1