freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

word版可編輯-施工圖深化設(shè)計要求標(biāo)準(zhǔn)精心整理-展示頁

2024-08-15 08:12本頁面
  

【正文】 e gradually and smoothly or can be adjusted by different grades. 、排隊區(qū)、上客區(qū)、下客區(qū)、主演區(qū)、預(yù)演區(qū)等直接為觀眾服務(wù)的地區(qū)的照明控制開關(guān)應(yīng)集中單獨控制。采用共用接地裝置時,接地電阻值不應(yīng)大于1Ω。 control loop No., model and specification of leads, munication protocol, and interface。Lighting equipments shall determine ground protection measures according to the earthing form of lowvoltage distribution system. :應(yīng)標(biāo)注控制箱編號、型號;標(biāo)注控制回路編號、導(dǎo)線型號規(guī)格、通訊協(xié)議、接口界面、控制系統(tǒng)若與其它設(shè)備有接口,須標(biāo)明接口類型。For the stage lighting lines distributed by thyristor lightcontrolling device, singlephase distribution shall be adopted. When adopting threephase distribution, it is appropriate to distribute neutral conductor respectively in each phase。Power connection of lighting equipments shall adopt the dedicated connectors and the rated capacity shall be enough.。If there is threephase power distribution line for the gas discharge lamp, its neutral line section shall meet the requirements of unbalance current and harmonic current and shall not be smaller than the phase line section. ,備用回路的數(shù)量不應(yīng)低于配電箱回路數(shù)量的30%。 load on each wire of the threephase distribution trunk shall be distributed in equilibration。 the load name shall also be marked. For details, please refer to chapter 7 of JGJ 162008 Code for Electrical Design of Civil Buildings and chapter 7 of GB 500342004 Standard for Lighting Design of Buildings. ,三相配電干線的各相負荷宜分配平衡,最大相負荷不宜超過三相負荷平均值的115%,最小相負荷不宜小于三相負荷平均值的85%。 it shall also indicate the model and specification of switches (or fuses), outgoing line loop No., and model and specification of leads, as well as the load capacity。具體設(shè)計原則請參考《民用建筑電氣設(shè)計規(guī)范》JGJ 162008第7章,《建筑照明設(shè)計標(biāo)準(zhǔn)》GB 500342004第7章。When SCR ponents are used as dimmer device, the supply transformer shall be △/ Y0 transformer.,除應(yīng)滿足《民用建筑電氣設(shè)計規(guī)范》JGJ ,還應(yīng)注意:電聲,電視轉(zhuǎn)播設(shè)備的電源不宜接在照明用電變壓器上。當(dāng)有類似5D劇場有人員參與演出涉及舞臺照明時,舞臺照明的供電與負荷計算應(yīng)參照《民用建筑電氣設(shè)計規(guī)范》JGJ 。All plan views and equipment room drawings shall be attached with graphic symbols and quantity. Equipment and materials including puters, software, programming tools, cabinets, power supply and transformers shall be indicated in the drawings or list of equipment materials, with clear indication of the model, specification and total quantity.System diagram:應(yīng)注明系統(tǒng)結(jié)構(gòu)、主要配置、終端分布、主干線纜、供電要求、文字說明等。The list of equipment and materials shall list the major equipment and materials constituting the system, with an indication of the equipment name, specification and model, key technical indicators, brand (origin), and quantity. Technical requirements for nonstandard equipment and materials shall be marked.各個平面圖、設(shè)備房圖應(yīng)隨附圖例并標(biāo)注數(shù)量。Graphic symbols in the list of materials shall adopt those in national standards, followed by ministerial standards and industry standards. Self made graphic drawings not specified shall be marked in the graphic symbols with explanations. Explanations shall also be given when graphic symbols in national standards are given different meanings. The graphic symbols used in one set of drawings shall be in consistence with each other. 設(shè)備材料清單,按系統(tǒng)開列組成系統(tǒng)主要設(shè)備和材料,應(yīng)標(biāo)明設(shè)備名稱、規(guī)格型號、主要技術(shù)指標(biāo)、品牌(產(chǎn)地)、數(shù)量。未予規(guī)定的自擬圖形圖例,應(yīng)在圖例中標(biāo)出且加以說明。The drawing content shall include the following: project name, project ID, name of design corporation, discipline, drawing name, drawing number, sheet, drawing finishing date, the person who draws, and the auditor. Engineering design instructions and graphic symbols設(shè)計總說明須包括但不限于:工程概況、設(shè)計依據(jù)、各子系統(tǒng)施工內(nèi)容、施工要求和注意事項、設(shè)計特殊要求和施工配合要點、設(shè)計范圍內(nèi)智能化系統(tǒng)與相關(guān)專業(yè)的技術(shù)接口要求、圖例符號等。It shall include the cover sheet, drawing content, engineering design instructions and graphic symbols, list of equipment and materials, system diagram, plan view, layout of equipment in equipment room, and detail drawing of equipment installation. Feasible and extendable detail drawing for equipment installation shall be designed according to the project situations by the designer who shall decide the depth of drawing according to the project feasibility and coordination between all subdivisional works of each discipline to satisfy the project requirements. Cover封面應(yīng)包含項目名稱、圖紙性質(zhì)(初步設(shè)計、施工圖、竣工圖等)、公司名稱、日期。A plete set of drawings used in the construction stage shall at least include the cover, drawing content, engineering design instructions and graphic symbols, list of equipment and materials, system diagram, plan view, and the detail drawing of equipment installation.照明專業(yè)圖紙范圍如下:Scope of drawings for lighting is as follows:必須包括封面、圖紙目錄、工程設(shè)計說明及圖例、設(shè)備材料清單、系統(tǒng)圖、平面圖、機房設(shè)備布置圖、安裝大樣圖。序號No. 編號S/N設(shè)備位置Equipment position品牌Brand 設(shè)備型號Equipment model光源Light sources 設(shè)備數(shù)量Equipment quantity 產(chǎn)地Origin 圖片Picture 1VASLED IPanel/RGBPL12030A9顆whiteLED3000K10W14廣州Guangzhou  2        3        4        5        6        7        總計     14  79 / 79四. 對施工圖紙的要求如下:IV. Requirements for Construction Drawings 用于設(shè)計方案階段的一套完整的圖紙至少應(yīng)包括封面、圖紙目錄、工程設(shè)計說明及圖例、設(shè)備材料清單、系統(tǒng)圖、平面圖。(用EXCEL表格做出,格式如下,第一行內(nèi)容為示范);III. Data sheet of lighting (in EXCEL, with the format as follows。施工設(shè)計提交成果Deliverables of Construction Drawings燈光照明Lighting對于燈光照明專業(yè)施工圖設(shè)計深度標(biāo)準(zhǔn)及技術(shù)深度文件現(xiàn)規(guī)定如下:The design depth and technical scope of special lighting working drawing are specified as follows:,各房間的照度計算書及燈具選型、燈位布置;I. Illumination calculation sheet and type selection and positioning of lights each in room in all areas。;II. Instructions of equipment used in the lighting control system。 contents in the first row are filled in as an example)。A plete set of drawings used in the design stage shall at least include the cover, drawing content, engineering design instructions and graphic symbols, list of equipment and materials, system diagram, and plan view.用于施工階段的圖紙至少應(yīng)包括封面、圖紙目錄、工程設(shè)計說明及圖例、設(shè)備材料清單、系統(tǒng)圖、平面圖及設(shè)備的安裝大樣圖。安裝詳圖根據(jù)項目情況,應(yīng)由設(shè)計師根據(jù)項目的可實現(xiàn)性和各專業(yè)分項工程的配合決定繪圖深度,設(shè)計出滿足項目需求的可實施的拓展性安裝詳圖。The cover shall bear the project name, drawing property (preliminary design, construction drawin
點擊復(fù)制文檔內(nèi)容
公司管理相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1