freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

word版可編輯-施工圖深化設(shè)計(jì)要求標(biāo)準(zhǔn)精心整理-免費(fèi)閱讀

  

【正文】 The design shall also indicate the brightness, resolution and dimension and type of display frame (such as plane or spheric display) of display equipment. Equipment parameters shall be appropriately selected according to the operating environment. (如:高度、角度等),如包含復(fù)雜支架,需提供相關(guān)模型和完整CAD圖紙。視頻系統(tǒng)中所采用設(shè)備的說明書;Instructions of equipment used in the video system。The equipment room arrangement drawing shall include the plane layout and partial elevation of the power distributing cabinet and controlling box, giving clear indication of the trend of pipelines and trunking, explanatory notes, and so on. (2)平面圖上的設(shè)備位置、數(shù)量、編號(hào),纜線規(guī)格、管線與線槽走向應(yīng)與立面圖上的設(shè)備位置、數(shù)量、編號(hào),纜線規(guī)格、管線與線槽走向相對(duì)應(yīng)。On the system diagram, lightcurrent and smallpower equipment (such as microphones, sources of sound and audio processors) and strongcurrent and heavy duty equipment (such as power amplifier, active loudspeaker and passive loudspeaker) shall be distinguished with marks and notes in different colors. 系統(tǒng)圖中要求體現(xiàn)所有音頻設(shè)備的輸入、輸出接口形式,以便統(tǒng)計(jì)接口規(guī)格與數(shù)量。General engineering design instructions shall include, without limitation to: project profile, design basis, construction contents of each sub system, construction requirements and notices, special design requirements and key points in construction cooperation, technical interface requirements for the intelligent system and relevant disciplines within the scope of design, graphic symbols, and so on. List of equipment and materials 在材料表中的圖形符號(hào)圖例應(yīng)采用國(guó)標(biāo),其次是部標(biāo)、行標(biāo)。IV. Provide the equipment data sheet of the soundreinforcement system (in EXCEL, with the format as follows。The equipment room arrangement drawing shall give clear indication of the installation position, correlations between equipment, and technical requirements of installation of the equipment inside the equipment room.(5)控制信號(hào)的強(qiáng)、弱電井布置圖應(yīng)具體反映強(qiáng)、弱電井內(nèi)所有線槽、管路、設(shè)備箱等的位置、尺寸The arrangement drawing of strong and weak electricity well of control signals shall specifically reflect the position and dimension of all trunkings, pipelines and equipment boxes inside the strong and weak electricity well.Detail drawing of installation安裝大樣圖是明確燈具安裝與建筑關(guān)系的說明圖。The pipeline wiring diagram of lightings shall indicate the No. of switch box from which the pipeline is drawn and the No. of loop, so as to check whether it coincides with the No. of loop of the switch box system diagram, and whether the total load connected with the loop coincides with that on the switch box system diagram. ,并盡可能與實(shí)際的排管布線方向一致。 when connecting the bined lights, the loop current shall not exceed 25A, and there shall be less than 60 illuminants。具體設(shè)計(jì)原則請(qǐng)參考《民用建筑電氣設(shè)計(jì)規(guī)范》JGJ 162008第8章。The light distribution box shall be placed in the place which is near to the lighting load center and convenient for operation and maintenance.(2)其他具體設(shè)計(jì)標(biāo)準(zhǔn)參考我國(guó)電影行業(yè)標(biāo)準(zhǔn)171。The lighting control switches in the areas directly serving the audiences, such as the entry, queue area, load on/off areas, performance area and rehearse area shall be intensively and independently controlled. 當(dāng)采用調(diào)光設(shè)備時(shí),每一照明回路的可載容量,應(yīng)與所選用的調(diào)光設(shè)備的回路輸出容量相適應(yīng)。 when neutral conductor is used in mon, its cross section shall be not less than 2 times that of phase conductor.。In making the system diagram of switch box, equilibration of the threephase system shall be considered。Drawing of lighting power supply and distribution system: With clear indication of the system structure, major configuration, terminal distribution, trunk cables, power supply requirements, explanatory notes, etc. For detailed principles for design, please refer to chapters 3 and 4 of JGJ 162008 Code for Electrical Design of Civil there are personnel participating in the stage show in likelytobe 5D theater with stage illumination involved, power supply and load calculation of stage illumination shall refer to the related regulations of Section , Chapter 9 of JGJ 162008 Code for Electrical Design of Civil Buildings.注意:Notes:,其電源變壓器宜采用接線方式為△/Y0的變壓器。當(dāng)使用國(guó)標(biāo)圖形圖例,又給予不同含義時(shí)也應(yīng)加以說明,一套圖紙的圖例符號(hào)應(yīng)前后一致。A plete set of drawings used in the design stage shall at least include the cover, drawing content, engineering design instructions and graphic symbols, list of equipment and materials, system diagram, and plan view.用于施工階段的圖紙至少應(yīng)包括封面、圖紙目錄、工程設(shè)計(jì)說明及圖例、設(shè)備材料清單、系統(tǒng)圖、平面圖及設(shè)備的安裝大樣圖。(用EXCEL表格做出,格式如下,第一行內(nèi)容為示范);III. Data sheet of lighting (in EXCEL, with the format as follows。The drawing content shall include the following: project name, project ID, name of design corporation, discipline, drawing name, drawing number, sheet, drawing finishing date, the person who draws, and the auditor. Engineering design instructions and graphic symbols設(shè)計(jì)總說明須包括但不限于:工程概況、設(shè)計(jì)依據(jù)、各子系統(tǒng)施工內(nèi)容、施工要求和注意事項(xiàng)、設(shè)計(jì)特殊要求和施工配合要點(diǎn)、設(shè)計(jì)范圍內(nèi)智能化系統(tǒng)與相關(guān)專業(yè)的技術(shù)接口要求、圖例符號(hào)等。All plan views and equipment room drawings shall be attached with graphic symbols and quantity. Equipment and materials including puters, software, programming tools, cabinets, power supply and transformers shall be indicated in the drawings or list of equipment materials, with clear indication of the model, specification and total quantity.System diagram:應(yīng)注明系統(tǒng)結(jié)構(gòu)、主要配置、終端分布、主干線纜、供電要求、文字說明等。 it shall also indicate the model and specification of switches (or fuses), outgoing line loop No., and model and specification of leads, as well as the load capacity。Power connection of lighting equipments shall adopt the dedicated connectors and the rated capacity shall be enough.。采用共用接地裝置時(shí),接地電阻值不應(yīng)大于1Ω。 (3)燈控人員應(yīng)能容易的觀察到觀眾席的情況;Lightcontrolling personnel shall be able to easily observe the auditorium。The electric wiring drawn from vertical shaft for lightcurrent and strongcurrent or control cabinet shall adopt trunking when there are numerous loops. :水平線槽、垂直線槽。For details, please refer to chapter 8 of JGJ 162008 Code for Electrical Design of Civil Buildings and chapter 7 of GB 500342004 Standard for Lighting Design of Buildings.以下所述在設(shè)計(jì)時(shí)應(yīng)特別注意:Special attention shall be paid to the following during design: 、編號(hào)、平面位置、安裝高度、安裝方式,管線、線槽走向、
點(diǎn)擊復(fù)制文檔內(nèi)容
公司管理相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1