【正文】
(KN/M)(2) C,D梁柱的線剛度為 (KN/M)橫向框架梁柱的側(cè)移剛度見下表:表3-1 橫向框架標(biāo)準(zhǔn)層D值構(gòu)件D值(KN/M)數(shù)量D(KN/M)B柱1941710194167C柱2423210242317D柱2423210242317E柱1941710194167871968表3-2 橫向框架首層D值構(gòu)件名稱D值(KN/M)數(shù)量D(KN/M)B柱1886210188620C柱2080110208010D柱2080410208040E柱18864101886407931312表3-3 橫向框架頂層D值構(gòu)件名稱D值(KN/M)數(shù)量D(KN/M)B柱194178139336C柱242328193856D柱242328193856E柱194178155336682384 第四章荷載計算A 屋面均布恒載三氈四油防水層 ㎡20厚的水泥砂漿找平層 KN/㎡40厚混合砂漿3%14= KN/㎡=㎡25=㎡粉底或吊頂: ㎡ 合計 KN/㎡B 過道走廊20㎜= KN/25=㎡粉底或吊頂:㎡ 合計: KN/㎡C 樓面均布荷載水磨石地面 ㎡25=㎡㎡ 合計: KN/㎡A 根據(jù)《荷載規(guī)范》查表可知,㎡。 故板厚取100BC跨:L=6000㎜主梁,取600㎜,取300㎜次梁 ,h取400㎜,b取250㎜CD跨:L=2400㎜主梁 ,取450㎜,取250㎜表31 估算梁的截面尺寸(㎜)及各層混凝土強(qiáng)度等級層數(shù)混凝土強(qiáng)度等級橫梁(bh)縱梁(bh)次梁(bh)BC,DE跨CD跨1~6C30300600250450300600250450 結(jié)合相關(guān)經(jīng)驗,我們可以初步估算出其恒荷載的標(biāo)準(zhǔn)值為12, 負(fù)載面積(中柱):2/2負(fù)載面積(邊柱):(+)/26/2=中柱柱底承受荷載恒荷載:126=1633KN活荷載:26=272KN永久荷載組合值:N=1633+=C30強(qiáng)度的混泥土, =,柱的截面積:A≥= 因此柱區(qū)600600滿足要求,為方便后面的計算,中柱和邊柱的尺寸均取600㎜600㎜。場地類型:二類場地。 地質(zhì)資料:工程地質(zhì)資料如下表。 屋面做法(上人屋面):見建筑設(shè)計部分。 沉降縫:50m,故要設(shè)置沉降縫, 墻身做法:外墻身采用300厚的填充墻 , 內(nèi)墻采用240厚的填充墻。根據(jù)設(shè)計資料的規(guī)劃要求,本辦公樓建筑要求的主要功能有:辦公室、文印室、資料室等,其具體工程概況如下。第二章 工程概況 本設(shè)計行政辦公樓位于武漢市。此次畢業(yè)設(shè)計,對于框架結(jié)構(gòu)設(shè)計的計算,在計算過程中以手算為主,輔以一些計算軟件的校正。歷時兩個多月,在指導(dǎo)老師的幫助下,通過相關(guān)資料的查閱、荷載的設(shè)計計算、論文撰寫以及外文的翻譯等等,加深了對新規(guī)范、規(guī)程、手冊等相關(guān)內(nèi)容的理解。中期,通過所學(xué)的基本理論、專業(yè)知識和基本技能,溫故而知新,進(jìn)行了建筑和結(jié)構(gòu)設(shè)計。本次畢業(yè)設(shè)計題目為——武漢東湖分校行政辦公樓。對樓板進(jìn)行了配筋計算,本設(shè)計采用獨立基礎(chǔ),對基礎(chǔ)進(jìn)行了受力和配筋計算。此外還進(jìn)行了結(jié)構(gòu)方案中的室內(nèi)樓梯的設(shè)計。并找出最不利的一組或幾組內(nèi)力組合。在確定框架布局之后,先進(jìn)行了層間荷載代表值的計算,接著利用頂點位移法求出自震周期,進(jìn)而按底部剪力法計算水平地震荷載作用下大小,進(jìn)而求出在水平荷載作用下的結(jié)構(gòu)內(nèi)力(彎矩、剪力、軸力)。 摘 要 本工程為武漢東湖分校行政辦公樓工程,采用框架結(jié)構(gòu),主體為六層,本地區(qū)抗震設(shè)防烈度為6度,場地類別為II類場地。 本設(shè)計主要進(jìn)行了結(jié)構(gòu)方案中橫向框架第11軸設(shè)計。接著計算豎向荷載(恒載及活荷載)作用下的結(jié)構(gòu)內(nèi)力。選取最安全的結(jié)果計算配筋并繪圖。完成了平臺板,梯段板,平臺梁等構(gòu)件的內(nèi)力和配筋計算及施工圖繪制。關(guān)鍵詞:框架結(jié)構(gòu) 內(nèi)力計算 抗震驗算 計算配筋 基礎(chǔ) Abstract This project is for the wuhan east lake campus administration building design, a framework structure for a sixstorey main, in the region earthquake intensity of 6 degrees classification as Class II venues. Led to the southwest direction, the basic Pressure , basic snow pressure The design of the main structure of the program horizontal framework 11axis seismic design. In determining the distribution framework, the first layer of representative value of the load, Then use vertex from the displacement method for earthquake cycle, and then at the bottom of shear horizontal seismic load calculation under size, then calculated the level of load under the Internal Forces (bending moment, shear and axial force). Then calculate vertical load (constant load and live load) under the Internal Forces. Identify the most disadvantaged group or an internal force several binations. Select the best safety results of the reinforcement and Mapping. In addition, the structure of the program indoor staircase design. On the floor reinforcement calculation, the use of pile foundation design, foundation and pile caps for the force and reinforcement calculation.KEY WORDS: Frame structure internal force calculation seismic checking calculation of reinforcement foundation 66 第一章 緒論畢業(yè)設(shè)計是我們大學(xué)本科教育中培養(yǎng)目標(biāo)實現(xiàn)的較為重要的階段,是對我們畢業(yè)前的綜合學(xué)習(xí)階段的一種深化、拓寬,同時也是對我們大學(xué)期間所學(xué)專業(yè)知識的全面總結(jié)與回顧。前期,為了順利完成畢業(yè)設(shè)計,我專門溫習(xí)了《結(jié)構(gòu)力學(xué)》、《鋼筋混凝土設(shè)計》、《建筑結(jié)構(gòu)抗震設(shè)計》等相關(guān)書籍,并借閱了《抗震規(guī)范》、《混凝土規(guī)范》、《荷載規(guī)范》等最新規(guī)范。后期,主要對計算書word文檔進(jìn)行排版及施工圖的繪制,并得到指導(dǎo)老師的審批與指正,從而使我圓滿的完成了此次畢業(yè)設(shè)計任務(wù),在此我對指導(dǎo)及審查的老師們表示衷心的感謝。鞏固了我們的專業(yè)知識、提高了我們綜合分析解決問題的能力,從各方面去達(dá)到一名本科生應(yīng)該達(dá)到的目標(biāo)與要求。由于自己水平、能力有限,難免有不妥和疏忽之處,敬請各位老師批評指正。該地段地勢平坦,環(huán)境較好,在選址和環(huán)境營造方面,注意自然景色的優(yōu)美,也重辦公環(huán)境各交通條件的因素,更強(qiáng)調(diào)人與自然環(huán)境的協(xié)調(diào)統(tǒng)一,比較適合辦公樓功能的充分利用。 設(shè)計題目:武漢東湖分校行政辦公樓設(shè)計 建筑面積:5500m2 建筑高度: 建筑層數(shù):六層 結(jié)構(gòu)類型:框架結(jié)構(gòu) 設(shè)計標(biāo)高:室內(nèi)外高差:450mm。 樓面做法:樓面(大理石樓面),100厚現(xiàn)澆鋼筋砼樓板,20厚板底抹灰。 門窗做法:塑鋼窗和木門。 基礎(chǔ)埋深m土層厚度m巖土名稱地基土