【正文】
站7)Machine labeling and machine control number設備標識及客戶資產(chǎn)編號5)Machine verification specification amp。Machine 設備2) Verification Preparation 檢查驗收流程圖:以下定義設備檢驗步驟。設備驗收流程及設備檢驗規(guī)格書以下為設備驗收流程,僅供參考: Machine qualification activities description 設備驗收執(zhí)行過程描述After receiving machines, it will spend 1week to verify machine function and reliability before send it to user. Below describes in details how to verify machine step by step until machine delivery to site according to the flowchart.收到設備后,需要1周時間驗證設備的功能和可靠性。Qualification Flowchart 檢驗準備It is required to prepare the following items before starting verifying machine: 檢驗前需準備以下事項1)Machine drawings設備圖紙3) checklist設備檢查規(guī)格和清單4)DUT樣品6)Measurement if required檢查工具或設備 equipment ID number, verified by, verify date and so on. Below is for referenced: 開始請?zhí)顚懺O備信息如編號,描述,版本等等,以下可供參考 文件檢查This section is to check if the machine will be verified by using correct relative documents, software, test station, DUT etc。Mechanical/Pneumatic Verifying If it is UAI or NG, it is better to add some ments on the column and also annotate the ment on machine labeling for tracking. If it is good, just plete with “OK” and no need to annotate on machine labeling. Below items are step by step:這里主要是機械和氣動部分的檢查. 對每個檢查項, 結果主要有三種: 接受,讓步接受,拒絕. 如果是讓步接受或拒絕, 請在結果欄里填上“UAI”或“NG”,也可加些備注,同時必須備注在設備標識上以便跟進.Verify raw materials for manufacturing parts are correct at documented type, Common amp。2) Verify surface treatment for manufacturing part is correct at documented type and no any scratch/damage/broken on surface and no any sharp edg