freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

周正杰畢業(yè)設(shè)計(jì)正文1-展示頁

2025-07-08 00:38本頁面
  

【正文】 施工安全檢查標(biāo)準(zhǔn)》 (JGJ5999) 1 《建筑施工高處作業(yè)安全技術(shù)規(guī)范》 (JGJ8091) 91 《建筑機(jī)械使用安全技術(shù)規(guī)范》 (JGJ332022) 1 《施工現(xiàn)場臨時(shí)用電安全技術(shù)規(guī)范》 (JGJ4688) 1 《建筑施工扣件式鋼管腳手架安全技術(shù)規(guī)程》 (JGJ1302022) 《組織鋼模板技術(shù)規(guī)范》 (GB502142022)2 《混凝土強(qiáng)度檢驗(yàn)評(píng)定標(biāo)準(zhǔn)》 (GBJ10787) 2 《建筑安裝工程質(zhì)量檢驗(yàn)評(píng)定統(tǒng)一標(biāo)準(zhǔn)》 (GBJ3002022) 2 《塔式起重機(jī)操作規(guī)程》 (ZBJ8001289) 2 《全國建筑安裝工程統(tǒng)一勞動(dòng)定額》2地質(zhì)報(bào)告第 2 章 工程概況第 頁 共 89 頁 10第 2 章 工程概況 工程特征涼山州煙草公司普格縣營銷部經(jīng)營業(yè)務(wù)用房工程,位于涼山州普格縣,由涼山州煙草公司建設(shè),建設(shè)目的是為了擴(kuò)大公司規(guī)模,方便公司經(jīng)營。本施工組織設(shè)計(jì)的編制,力求本方案重點(diǎn)突出,針對(duì)性,可操作性強(qiáng)。在人員,機(jī)械,材料調(diào)配,質(zhì)量要求,進(jìn)度安排等方面統(tǒng)一部署的原則下,由土建,裝飾兩大專業(yè)綜合組成。由于建筑產(chǎn)品的多樣性,每項(xiàng)工程都必須單獨(dú)編制施工組織設(shè)計(jì),施工組織設(shè)計(jì)經(jīng)審批通過后方可施工。單位施工組織的內(nèi)容包括“三一”文件,即一文一圖一表。怎樣結(jié)合工程的性質(zhì)和規(guī)模、工期的長短、工人的數(shù)量、機(jī)械裝備程度、材料供應(yīng)情況、構(gòu)件生產(chǎn)方式、運(yùn)輸條件等各種技術(shù)經(jīng)濟(jì)條件,從經(jīng)濟(jì)和技術(shù)統(tǒng)一的全局出發(fā),從許多可能的方案中選定最合理的方案,對(duì)施工的各項(xiàng)活動(dòng)做出全面的部署,編制出規(guī)劃和指導(dǎo)施工的技術(shù)經(jīng)濟(jì)文件。4 設(shè)計(jì)的基本內(nèi)容 編制依據(jù) 工程概況(1)工程簡介 (2) 建筑概況 本工程施工重點(diǎn)、難點(diǎn)和對(duì)策(1)施工重點(diǎn)、難點(diǎn) (2)施工重點(diǎn)、難點(diǎn)對(duì)策 施工部署(1)工程目標(biāo)(2)管理組織機(jī)構(gòu)(3)施工部署(4)施工準(zhǔn)備工作(5)施工現(xiàn)場平面布置 主要分部分項(xiàng)工程施工技術(shù)方案(1)施工測量 (2)土方開挖 (3)鋼筋工程(4)模板工程(5)混凝土工程(6)防水工程設(shè)計(jì)說明書第 頁 共 89 頁 6(7)土方回填(8)腳手架工程(9)砌筑工程(10)樓地面工程(11)外裝修工程(12)內(nèi)裝修工程(13)電氣工程(14)給排水管道安裝工程施工 施工進(jìn)度計(jì)劃(1)施工進(jìn)度計(jì)劃的保證措施(2)施工協(xié)調(diào)管理(3)主要施工進(jìn)度計(jì)劃敘述 工期保證措施(1)工期目標(biāo)(2)工期保證措施 季節(jié)施工措施(1)雨期施工措施(2)農(nóng)忙時(shí)節(jié)施工 主要機(jī)具設(shè)備配備 質(zhì)量保證措施(1)質(zhì)量目標(biāo)(2)質(zhì)量保證體系(3)組織保證措施(4)質(zhì)量管理制度(5)技術(shù)保證措施 安全技術(shù)措施和保證制度 文明施工及環(huán)保措施(1) 現(xiàn)場場容、場貌布置7(2)環(huán)衛(wèi)管理措施(3)環(huán)境管理措施及環(huán)境管理方案 成品保護(hù)措施 降低造價(jià)技術(shù)措施 各種參考圖表 施工總平面圖及進(jìn)度表結(jié) 束 語建設(shè)項(xiàng)目的施工,可以有不同的施工順序;每一個(gè)施工過程可以采用不同的施工方案;每一種構(gòu)件可以采用不同的生產(chǎn)方式;每一種運(yùn)輸工作可以采用不同的方式和工具;現(xiàn)場施工機(jī)械、各種堆物、臨時(shí)設(shè)施和水電線路等可以有不同的布置方案;開工前的一系列施工準(zhǔn)備工作可以用不同的方法進(jìn)行。本工程外裝飾:外墻為花崗石和外墻漆,塑鋼窗;內(nèi)裝飾除衛(wèi)生間外為混合砂漿抹面,刷乳膠漆,衛(wèi)生間為貼面磚;辦公室、會(huì)議室為輕鋼龍骨硅鈣板吊頂和實(shí)木門;辦公室、會(huì)議室、樓梯間為 600*600 淡黃色5地板;衛(wèi)生間為 300*300 防滑地磚;屋面為擠塑聚苯板保溫、APP 卷材防水屋面;室外臺(tái)階為定制踢踏步磚。各層均設(shè)有衛(wèi)生間、走廊等輔助室。在指導(dǎo)老師的指導(dǎo)下,通過對(duì)參考資料查閱、現(xiàn)場實(shí)踐學(xué)習(xí),對(duì)單位工程圖紙進(jìn)行認(rèn)真的閱讀,并結(jié)合本地的的勞動(dòng)力、材料、機(jī)具情況合理的進(jìn)行本次設(shè)計(jì)。2 設(shè)計(jì)的基本思路和內(nèi)容依據(jù)我國相關(guān)政策法規(guī)、工程量計(jì)算規(guī)則、施工圖紙等相關(guān)資料,首先收集基礎(chǔ)文件資料,翻看圖集,熟悉圖紙。 上述原則既是建筑產(chǎn)品生產(chǎn)的客觀需要,又是加快施工速度、縮短工期、保證工程質(zhì)量、降低工程成本、提高建筑施工企業(yè)和工程項(xiàng)目建設(shè)單位的經(jīng)濟(jì)效益的需要。 (8)盡量采用國內(nèi)外先進(jìn)的施工技術(shù)和科學(xué)管理方法。 (6)貫徹工廠預(yù)制和現(xiàn)場預(yù)制相結(jié)合的方針,提高建筑產(chǎn)品工業(yè)化程度。 (4)采用流水施工方法和網(wǎng)絡(luò)計(jì)劃技術(shù)組織施工。 (2)做好施工項(xiàng)目排隊(duì),保證重點(diǎn),統(tǒng)籌安排。設(shè)計(jì)說明書第 頁 共 89 頁 4設(shè)計(jì)說明書1 編制基本原則根據(jù)我國建筑業(yè)施工長期積累的經(jīng)驗(yàn)和建筑施工的特點(diǎn),編制施工組織設(shè)計(jì)以及在組織建筑施工的過程中,一般應(yīng)遵循以下幾項(xiàng)基本原則: (1)認(rèn)真執(zhí)行基本建設(shè)程序。通過施工組織設(shè)計(jì)的編制,可以全面考慮擬建工程的各種施工條件,揚(yáng)長避短, ,制定合理的施工方案、技術(shù)經(jīng)濟(jì)和組織措施,制定合理的進(jìn)度計(jì)劃(包括確保實(shí)施的準(zhǔn)備工作計(jì)劃) ;提供合理的臨時(shí)設(shè)施,以及材料和機(jī)具在施工場地上的布置方案,只有這樣,才能保證施工的順利進(jìn)行。通過編制施工組織設(shè)計(jì),可以針對(duì)工程的特點(diǎn),根據(jù)施工壞境的各種具體條件,按照客觀的施工規(guī)律,制訂擬建工程的施工方案,確定施工順序、施工方法、勞動(dòng)組織和技術(shù)組織措施;可以確定施工進(jìn)度,控制工期;可以有序的組織材料、機(jī)具、設(shè)備、勞動(dòng)力需要量的供應(yīng)和使用;可以合理地利用和安排為施工服務(wù)的各項(xiàng)臨時(shí)設(shè)施;可以合理的布置施工現(xiàn)場,確保文明施工、安全施工;可以分析施工中可能產(chǎn)生的風(fēng)險(xiǎn)和矛盾,以便及時(shí)研究解決問題的對(duì)策、措施;可以將工程的設(shè)計(jì)與施工、技術(shù)與經(jīng)濟(jì)、施工組織與施工管理、施工全局規(guī)律與施工局部規(guī)律、土建施工與設(shè)備安裝、各部門之間、各專業(yè)之間有機(jī)的結(jié)合,相互配合,統(tǒng)一協(xié)調(diào)。1周正杰畢業(yè)設(shè)計(jì)摘 要本施工組織設(shè)計(jì)主要根據(jù)業(yè)主(招標(biāo)文件)和設(shè)計(jì)方案對(duì)工程建設(shè)的要求,從工程實(shí)施全過程中的人力、物力和空間等三個(gè)要素著手,在人力與物力,主體與輔助,供應(yīng)與消耗,生產(chǎn)與存儲(chǔ),專業(yè)與協(xié)作,以及空間布置與時(shí)間安排等方面進(jìn)行了科學(xué)合理的布置,并對(duì)工程實(shí)施全過程的各種施工條件進(jìn)行綜合考慮,然后擬定了優(yōu)化的施工方案,確定了準(zhǔn)確的施工順序、施工方法和施工組織措施,合理地統(tǒng)籌安排擬定了施工進(jìn)度計(jì)劃,最后對(duì)平面布置進(jìn)行合理的規(guī)劃布置。關(guān)鍵詞:施工方案,施工順序,施工組織措施,施工進(jìn)度計(jì)劃第 頁 共 89 頁 2ABSTRACTConstruction anization designs main demand of basis proprietor (invitation to bid document) and design plan to engineering construction, from the project putting manpower in the entire proceeding into practice, three key element such as material resources and space sets about, in manpower with material resources ,the main body and assists, supplies with consumption, produces with memory, special field and bined efforts, arrange rationally as well as aspect such as space arrangement and time arrangement has carried out science, the various construction condition implementing the entire proceeding to project has carried out synthesis and thinking, has designed and then the construction scheme optimizing, Have ascertained accurate construction order, the method being under construction and construction anization measure, prehensive arrangement has designed the rate of progress plan being under construction rationally, has been in progress finally to flat surface arrangement.Key words: Construction scheme,Construction order,Construct and anize the measure,Construction speed plan3前 言施工組織設(shè)計(jì)是用以指導(dǎo)施工組織與管理、施工準(zhǔn)備與實(shí)踐、施工控制與協(xié)調(diào)、資源的配置與使用等全面性的技術(shù)、經(jīng)濟(jì)文件;是對(duì)施工活動(dòng)的全過程進(jìn)行科學(xué)管理的重要手段。施工組織設(shè)計(jì)要根據(jù)國家的有關(guān)技術(shù)政策和規(guī)定、業(yè)主的要求、設(shè)計(jì)圖紙和組織施工的基本原則,從擬建工程施工全局出發(fā),結(jié)合工程的具體條件,合理地組織施工,采用科學(xué)的管理方法,不斷地革新施工技術(shù),有效地使用人力、物力、安排好時(shí)間和空間,以期達(dá)到耗工少、工期短、質(zhì)量高和造價(jià)低的最優(yōu)效果。實(shí)踐證明,擬建工程的施工組織設(shè)計(jì)編制得合理,并且在施工過程中認(rèn)真地貫徹執(zhí)行,就可以確保施工的順利進(jìn)行,取得好、快、省和安全的效果,早日發(fā)揮基本建設(shè)投資的經(jīng)濟(jì)效益和社會(huì)效益?;窘ㄔO(shè)的程序主要是計(jì)劃、設(shè)計(jì)和施工等幾個(gè)階段,它是由基本建設(shè)工作客觀規(guī)律所決定的。 (3)遵循建筑施工工藝和技術(shù)規(guī)律,堅(jiān)持合理的施工程序和施工順序。 (5)科學(xué)地安排冬雨季施工項(xiàng)目,保證全年生產(chǎn)的連續(xù)性和均衡性。 (7)充分利用現(xiàn)有機(jī)械設(shè)備,提高機(jī)械化程度。 (9)盡量減少暫設(shè)工程,合理地儲(chǔ)備物資,減少物資運(yùn)輸量,科學(xué)地布置施工平面圖。所以必須在組織工程項(xiàng)目施工過程中認(rèn)真地貫徹。計(jì)算出教學(xué)樓的土建工程量,其次根據(jù)工程量進(jìn)行施工進(jìn)度的安排。3 工程概況此涼山州煙草公司普格縣營銷部經(jīng)營業(yè)務(wù)用房,建筑面積 平方米,總高度 ,長度 42m,寬度 ,為框架結(jié)構(gòu),總共八層,頂層層高 ,其他層層高 ,一層為大廳和辦公室,二至八層為辦公室和會(huì)議室。共設(shè)有兩部樓梯和一部電梯。此涼山州煙草公司普格縣營銷部經(jīng)營業(yè)務(wù)用房為框架結(jié)構(gòu),采用帶形基礎(chǔ);頂層層高 ,其他層層高 ;框架部分梁、柱、現(xiàn)澆板、樓梯、現(xiàn)澆帶為 C35,其他非承重結(jié)構(gòu)構(gòu)件為 C30; 標(biāo)高以下采用 磚, 水泥砂漿砌筑;框架填充墻采用 180 厚 KF1 燒結(jié)空心磚,M5 混合砂漿砌筑;其他框架梁上需設(shè)隔墻時(shí)均采用輕質(zhì)材料制作,不得使用砌筑墻體,在非框架梁上設(shè)置隔墻時(shí)應(yīng)在板下設(shè)置 2B16 鋼筋。不同的施工方案,其效果是不一樣的。本施工組織設(shè)計(jì)是指針對(duì)擬建的工程項(xiàng)目,在開工前針對(duì)工程本身特點(diǎn)和工地具體情況,按照工程的要求,對(duì)所需的施工勞動(dòng)力、施工材料、施工機(jī)具和施工臨時(shí)設(shè)施,經(jīng)過科學(xué)計(jì)算、精心對(duì)比及合理的安排后編制出的一套在時(shí)間和空間上進(jìn)行合理施工的戰(zhàn)略部署文件。施工組織設(shè)計(jì)是工程施工的組織方案,是指導(dǎo)施工準(zhǔn)備和組織施工的全面性技術(shù)經(jīng)濟(jì)文件,是現(xiàn)場施工的指導(dǎo)性文件。第 1 章 綜合說明第 頁 共 89 頁 8施工組織設(shè)計(jì)正文第 1 章 綜合說明 編制說明本施工組織設(shè)計(jì)嚴(yán)格按照工程承包合同范圍和有關(guān)文件對(duì)施工組織設(shè)計(jì)的要求進(jìn)行編制。根據(jù)本工程設(shè)計(jì)的特點(diǎn),功能要求,本著對(duì)業(yè)主資金合理運(yùn)用,對(duì)工程質(zhì)量的高度負(fù)責(zé),編制原則是“經(jīng)濟(jì)、合理、優(yōu)質(zhì)、高效” 。 編制依據(jù)本施工組織設(shè)計(jì)編制的目的是:為涼山州煙草公司普格縣營銷部經(jīng)營業(yè)務(wù)用房施工階段提供較為完整的技術(shù)文件,指導(dǎo)本工程優(yōu)質(zhì)、高速、安全、文明地施工。本工程資金來源于自籌,工程總投資大約在 1000 萬元左右。 建筑結(jié)構(gòu)特征 建筑設(shè)計(jì)概況此涼山州煙草公司普格縣營銷部經(jīng)營業(yè)務(wù)用房,建筑面積 平方米,總高度 ,長度 42m,寬度 ,為框架結(jié)構(gòu),總共八層,頂層層高 ,其他層層高 ,一層為大廳和辦公室,二至八層為辦公室和會(huì)議室。共設(shè)有兩部樓梯和一部電梯。 結(jié)構(gòu)設(shè)計(jì)概況此涼山州煙草公司普格縣營銷部經(jīng)營業(yè)務(wù)用房為框架結(jié)構(gòu),采用帶形基礎(chǔ);頂層層高 ,其他層層高 ;框架部分梁、柱、現(xiàn)澆板、樓梯、現(xiàn)澆帶為 C35,其他非承重結(jié)構(gòu)構(gòu)件為 C30; 標(biāo)高以下采用 磚, 水泥砂漿砌筑;框架填充墻采用 180 厚 KF1 燒結(jié)空心磚,M5 混合砂漿砌筑;其他框架梁上需設(shè)隔墻時(shí)均采用輕質(zhì)材料制作,不得使用砌筑墻體,在非框架梁上設(shè)置隔墻時(shí)應(yīng)在板下設(shè)置 2B16 鋼筋。這是本工程最主要的特點(diǎn)之一。11本工程時(shí)間性強(qiáng)。本工程位于繁華街道,四周綠化較多,環(huán)境優(yōu)美,在施工過程中加強(qiáng)對(duì)樹木的保護(hù),“治污、控噪、防塵”是該工程的又一難關(guān)。針對(duì)上述工程特點(diǎn),我們從工期安排,質(zhì)量要求、與各方協(xié)調(diào)配合及溝通等方面均編制了相應(yīng)的措施。工期目標(biāo):開工日期 2022 年 5 月 1 日,竣工時(shí)間 2022 年 12 月 30 日,日歷日240 天。環(huán)保目標(biāo):配合藍(lán)天工程將污染降到最低,與現(xiàn)
點(diǎn)擊復(fù)制文檔內(nèi)容
教學(xué)課件相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1