【正文】
后基本趨于穩(wěn)定,但若在其上方地表新建建筑物時(shí), 部分采空區(qū)會(huì)出現(xiàn)“活化”現(xiàn)象,對(duì)建筑工程安全造成嚴(yán)重的威脅。關(guān)鍵字:采空區(qū)、附加應(yīng)力、活化、有限元法、地基穩(wěn)定性Comprehensive evaluation of foundation stability about highrise building to be built above mine goafAbstractWith the development of economic consolidation, it bees more and more important to evaluate the stability of the building above the mine goaf. This paper take a highrise building as an example, firstly make clear of the conditions of the coal bed、stratum and mine, then analyze the data of drilling and geophysical prospecting. Finally, make a prehensive evaluation of the stability of the foundation by using finite element numerical simulation and , finally giving suggestion on foundation treatment.Key words: mine goaf, additional stress, activation, finite element, foundation stability0 序言隨著經(jīng)濟(jì)建設(shè)的發(fā)展,在老采空去上建設(shè)性的建(構(gòu))物將漸漸的成為一種必然趨勢(shì),所以對(duì)老采空區(qū)穩(wěn)定性的影響以及其自身安全的研究越來越收到專家學(xué)者的重視。 范文 范例 指導(dǎo) 參考 老采空區(qū)上建高層建筑物的地基穩(wěn)定性綜合評(píng)價(jià) 錢自衛(wèi) 姜振泉 吳慧蕾(中國礦業(yè)大學(xué) 資源與地球科學(xué)學(xué)院 221116)摘要隨著經(jīng)濟(jì)建設(shè)的發(fā)展,采空區(qū)上方修建建筑物的穩(wěn)定性評(píng)價(jià)將越來越重要。本文以某高層為例,通過調(diào)查煤層,地層及采礦情況,分析現(xiàn)場(chǎng)鉆探、物探資料,最后采用有限元數(shù)值分析方法及穩(wěn)定評(píng)價(jià)方法對(duì)地基穩(wěn)定性進(jìn)行綜合評(píng)價(jià),并對(duì)地基的處理提出建議。但是在煤層采出后,使采空區(qū)周圍及上覆巖體內(nèi)部結(jié)構(gòu)遭到破壞。因此,必須對(duì)老采空區(qū)新建建(構(gòu))筑物地