【正文】
acceptance work of project transacted in 55 days. Party B make sure that all the equipment will be normally electrified in 6065 days when the advance payment is received.5. 付款條件(Conditions of Payment): ,預(yù)付50%即 元人民幣。本合同價格含以上全部費用(除電力部門指定由業(yè)主自己交費項目外) The content of contract: The project equipment installation including 3 set of highvoltage switch cabinet, one 1600 kva transformer, 8 sets of lowvoltage switch cabinet, mutual inductor used metering and metering device. Party b is responsible for installation and inspection of power part of all equipment, electric cable, bridge and metering device this B is responsible for all inspection electricity application、installation acceptance、test and the finally electricity work related to electric power pany about this project is full set of turnkey project. This contract price and above all charges.(In addition to the electric power department designated by the owner their own to pay.): 美元 Project Funds: USD (Say only):合同簽訂后,預(yù)付款收到后50天完成全部安裝工作,55天時辦理完項目驗收工作。施工完成后,乙方負責(zé)本項目所有電力公司的相關(guān)報驗、通電申請、安裝驗收、試驗和最后通電工作。電氣安裝施工合同Electrical installation construction contract甲方: Party A:乙方: Party B:雙方同意按下列條款簽訂合同:Party A and Party B agreed to sign a contract according to the following terms and conditions:1. 工程概況:噴漆處理線配套供電設(shè)備Project profile: Spray paint processing