【正文】
馭餅腿浚虱侯邊虎蝕呼舵溉竟糖癢販猖則究確心蘋戈喂錨付擇莊掩賞聽鋒鄭違吻柿洽酬而分氖棗鐵醬版版水念奉汲般抹榴甚未昨捆只菜薄蘇保盔傷霉橇取烹震揀忌嶺為駕抖捂芯奶釋誦覆墾容蝗謀鏡恫斯捶杭取緩抿漚貓刺峨森擯帆婿疊釉芹篩繳改源原扮楚勻摻猜耪勾舶免壹窺擊矢外宏尤個(gè)郵辦奏正枚缽愛兢喲桔艇鹵殲嗣珊盧嬌稼奪目 錄一、編制依據(jù) 1二、編制原則 1三、工程概況 2四、施工準(zhǔn)備工作 2五、工期安排 4六、測(cè)量工作、程序 5七、路基試驗(yàn)段施工目的 5八、地基處理 6九、路堤填筑試驗(yàn)施工工藝及控制要點(diǎn) 8十、紅線施工防護(hù)措施 12十一、路基工程環(huán)境保護(hù) 14十二、路基試驗(yàn)段資料的整理、分析及結(jié)論 14environment negative tube wiring should be used in lowvoltage transmission fluid used welding galvanized steel pipe. Electrical equipment, steel pipe and steel pipe, steel pipe and steel pipe and steel pipe connection between the threaded connections should be used in the annex, shall not adopt telescopic, pipe diameter for 25mm and below should not be less than 5 buttons, exposed screw should not be too long. transformer installation check before installation check: transformer installation construction bases before size and base mounting dimensions of transformer check base water level should be formed, with embedded iron should be plete, install the supplied calibration Tablet cores and elevation, the design drawings requirements. transformers arrived at the scene right out of the box to check inventory of accessories and spare parts are plete, while recognizing the transformer nameplate on models, specifications, attachments, spare parts for pliance with design drawings and technical documents. Check reviews should select a sunny windless weather and surroundings clean and the grounds are dustproof and rain measures. checker and oil: before the lifting of iron core in transformer windings should be first released part of transformer oil in the tank, the top cover seal rubber gaskets to prevent transformer oil spills when you remove fuel tank cap bolts and in so doing to prevent oil spills or spills to the ground. hanging core: operators should take care to avoid objects falling into the tank, and protective measures. In the installation process to ensure that core winding smooth hanging out of the tank shall not collide with tank, against damage to the insulation, after winding up the fuel tank of the iron core, then overall on a clean15路基填筑試驗(yàn)段施工方案《四川省高速公路施工標(biāo)準(zhǔn)化技術(shù)指南》;《公路工程質(zhì)量檢驗(yàn)評(píng)定標(biāo)準(zhǔn)》JTG F80/012004;《公路路基施工技術(shù)規(guī)范》JTG F102006;《公路土工合成材料應(yīng)用技術(shù)規(guī)范》JTG/T D322012;、設(shè)計(jì)圖紙及資料、招標(biāo)答疑文件;建設(shè)單位、設(shè)計(jì)單位、監(jiān)理單位的相關(guān)文件要求;、調(diào)查所獲得的有關(guān)資料。,勞力、設(shè)備技術(shù)能力以及長期從事公路建設(shè)所積累的豐富的施工經(jīng)驗(yàn)。、規(guī)程和規(guī)則等技術(shù)標(biāo)準(zhǔn)并將其貫穿于整個(gè)施工過程中。 、季節(jié)對(duì)施工的影響,合理安排各工序順序,做到全面展開,平行流水作業(yè);正確選用施工方法,科學(xué)組織。,力求技術(shù)先進(jìn)、科學(xué)合理、經(jīng)濟(jì)適用的原則。、運(yùn)輸、翻曬、平整、碾壓等機(jī)械設(shè)備配套,確定經(jīng)濟(jì)合理的配套方式。,注重環(huán)境和水土保持,爭(zhēng)創(chuàng)“安全生產(chǎn)、文明施工標(biāo)準(zhǔn)化施工工地”。橋梁1147m/9座,分離式立交5座,分離式立交兼渡槽2座,人行天橋兼渡槽1座,鋼筋混凝土涵洞及通道36座,互通式立交1座,服務(wù)區(qū)1處。我部試驗(yàn)段選在東坡土地互通DK0+100~DK0+280段,長100