【正文】
第四章 支護(hù)結(jié)構(gòu)方案選擇 7 支護(hù)結(jié)構(gòu)選型的因素 7 基坑支護(hù)方案的初選 7 基坑支護(hù)方案的確定 8 第五章 基坑支護(hù)設(shè)計(jì)計(jì)算 10 基坑支護(hù)設(shè)計(jì)要求 10 基坑支護(hù)設(shè)計(jì)原則與安全等級(jí) 10 參數(shù)的初選 11 基坑支護(hù)設(shè)計(jì)的主要內(nèi)容 12 排樁設(shè)計(jì)計(jì)算 12 土壓力計(jì)算簡介 13 水平荷載計(jì)算 14 水平抗力計(jì)算 16 支點(diǎn)力計(jì)算 18 嵌固深度計(jì)算 20 樁身最大彎矩的計(jì)算 21 灌注樁結(jié)構(gòu)設(shè)計(jì) 22 樁受力鋼筋計(jì)算 22 樁箍筋計(jì)算 23 樁配筋驗(yàn)算 24 冠梁設(shè)計(jì)計(jì)算 25 錨桿設(shè)計(jì)計(jì)算 25 錨桿簡介 25 錨桿設(shè)計(jì)主要內(nèi)容 26 錨桿設(shè)計(jì)計(jì)算 27 錨桿配筋計(jì)算 31 腰梁設(shè)計(jì)計(jì)算 31 第六章 穩(wěn)定性驗(yàn)算 33 嵌固深度穩(wěn)定性驗(yàn)算 33 抗隆起穩(wěn)定性驗(yàn)算 35 整體穩(wěn)定性驗(yàn)算 36 錨桿承載力驗(yàn)算 40 第七章 施工組織設(shè)計(jì) 43 施工組織設(shè)計(jì)編寫依據(jù) 43 施工準(zhǔn)備 43 現(xiàn)場準(zhǔn)備 43 材料準(zhǔn)備 43 施工機(jī)械設(shè)備 44 勞動(dòng)力計(jì)劃 44 施工用電和施工用水 45 施工平面布置 45 排樁施工 45 施工工藝流程 46 鋼筋籠制作與吊放 46 成孔 47 灌注混凝土 47 錨桿施工 51 施工工藝 51 施工準(zhǔn)備 51 施工方法 51 質(zhì)量保證措施 52 土方工程 53 機(jī)械選擇 53 施工方法 53 安全與環(huán)保要求和措施 54 安全要求和措施 54 環(huán)保要求和措施 54 工程監(jiān)測與信息施工 55 第八章 結(jié) 論 58 參考文獻(xiàn) 60 致 謝 61 第一章 緒 論 畢業(yè)設(shè)計(jì)是大學(xué) 本科教育培養(yǎng)目標(biāo)實(shí)現(xiàn)的重要階段,是畢業(yè)前的綜合學(xué)習(xí)階段、是深化、拓寬、綜合教學(xué)的重要過程,是對(duì)大學(xué)期間所學(xué)專業(yè)知識(shí)的全面總結(jié)。 bored caisson pile。 In the process of reinforcement calculation, with reference to the concrete structure design code. The calculation process not only take the current national building foundation pit engineering as the basis, but also refer to the previous projects, strengthen the bination of theory and practice. The main principle of this design is how to ensure the safety and reliability of foundation pit, convenient construction, and achieves the economic effect. Through this paper, it has the intuitive description of the foundation pit support design of various parameters. [Keywords]: retaining and protection for Excavations。s Hospital C area hospital ward building is located in Luohe transportation road 201st. The site is a rectangle, length 72m, width 31m, the area of ground floor is square meters, the basement total floor is 1742 square meters in area, it is a 16storey building, frame shear wall structure, the actual structure excavation depth of the basement is 6m. This article first introduces engineering geology and the surrounding environment, bined with the project general situation and its surrounding environment situation, refers to the existing pitretaining structure design theory, this design uses the bored pile to add the pitretaining structure of anchor rod. This design is according to national present construction pitretaining structure technical schedule, under assigning condition of geological prospecting report, carries on the pitretaining structure designs, the main purpose is to master the design method of pitretaining structure. In the process of earth pressure calculation using the Rankine earth pressure theory。 [關(guān)鍵詞 ]:基坑支護(hù);朗肯土壓力理論;等值梁法;鉆孔灌注樁;錨桿。本次設(shè)計(jì)的主要指導(dǎo)原則是如何保證基坑的安全可靠、方便施工,并達(dá)到經(jīng)濟(jì)的效果。在土壓力計(jì)算過程中,運(yùn)用了朗肯土壓力理論;在內(nèi)力計(jì)算過程中,運(yùn)用了等值梁法;在配筋計(jì)算過程中,參照了混凝土結(jié)構(gòu)設(shè)計(jì)規(guī)范。本文先介紹了工程地質(zhì)及周邊環(huán)境情況,結(jié)合工程概況及其周邊環(huán)境情況,參照現(xiàn)有基坑支護(hù)設(shè)計(jì)理論,本次設(shè)計(jì)采用了鉆孔灌注樁加錨桿的基坑支護(hù)結(jié)構(gòu)。 一、畢業(yè)設(shè)計(jì)(論文)的總評(píng)語 二、畢業(yè)設(shè)計(jì)(論文)的總成績: 三、答辯組組長簽名: 答辯組成員簽名: 答辯委員會(huì)主席: 簽字(蓋章) 年 月 摘 要 漯河市第二人民醫(yī)院 C 區(qū)病房樓位于漯河市交通路 201 號(hào)。 答辯委員會(huì)主席(組長)簽字(蓋章) 年月日 河南理工大學(xué) 畢業(yè)設(shè)計(jì)(論文)答辯委員會(huì)(小組)決議 土木工程 學(xué)院 專業(yè) 班 同學(xué)的畢業(yè)設(shè)計(jì)(論文)于 72020 年 06 月 日進(jìn)行了答辯。土木