【正文】
詳細工程設(shè)計原定完成,現(xiàn)擬調(diào)整到完成,請予以審查。We have pleted the missionig preparations according to the contract requiremetns, after the self check, the preparations are on spec, please check and approve the Premissioning test.附Attached:承包單位(章)Contractor(Chop)項目經(jīng)理Project manager 日 期Date 審核意見 Review ments:項目監(jiān)理機構(gòu)CS/CMC 總/專業(yè)監(jiān)理工程師Chief/discipline supervision engineer 日 期Date SH/T 勘察/設(shè)計費用支付報審表Geotech/Design Payment Approval Request工程名稱 Works Title:編號 Item No:致 (監(jiān)理單位)To (CS/CMC)根據(jù)委托設(shè)計合同第條款,我單位已于年月日交付設(shè)計文件,建設(shè)單位應(yīng)支付該項勘察/設(shè)計費共(大寫)(小寫:),請予以審核。We contracted the works, we are going to mobilize the major construction equipment and tools as well as the inspection equipment and tools specified by the contract, after the self inspection, they are on spec, please inspect.附Attached:承包單位(章)Contractor(Chop)項目經(jīng)理Project manager 日 期Date 審查意見 Review ments:經(jīng)檢查上述施工設(shè)備、機具及檢測設(shè)備、工具,符合/不符合施工組織設(shè)計文件和相關(guān)要求,準(zhǔn)許/不準(zhǔn)許進場。Approved the solution for this incident.不同意此事故處理方案,修改后再報。On , at (works location), there was works qualtity incident, the works quality incident report (item No ) has been issued on , after we investigated, analyzed and studied it, now we submit the details and solution to you, please review.附Attached: 事故詳情及處理方案 Incident Details and Solution。Drawings and charts, instruction books, totally in pages.承包單位(章)Contractor(Chop)項目經(jīng)理Project manager 日 期Date 審查意見 Review ments:同意此進度計劃。我們將嚴(yán)格按審查通過的進度計劃組織施工。Based on the above points, the preliminary inspection and acceptance of this works is on spec/off spec, formal inspection and acceptance can be/can not be organized .項目監(jiān)理機構(gòu)CS/CMC 總監(jiān)理工程師Chief supervision engineer 日 期Date SH/T 施工進度計劃報審表Construction Schedule Approval Request工程名稱 Works Title:編號 Item No:致 (監(jiān)理單位)To (CS/CMC)我方已根據(jù)承包合同的有關(guān)規(guī)定編制完成了年月日 至年月日的:We have pleted the preparations of the following schedules from to according to the related regulations of the construction contract:1 工程施工總進度計劃 Project Construction Overall Schedule;2 工程施工月進度計劃 Project Construction Monthly Schedule;3 工程施工周進度計劃 Project Construction Weekly Schedule;4 計劃 schedule。We have pleted the works according to the requirements of the contract,after the self check, it is on spec, please inspect and accept.附Attached:承包單位(章)Contractor(Chop)項目經(jīng)理Project manager 日 期Date 審查意見Review ments:經(jīng)初步驗收,該工程:after the preliminary inspection and acceptance, this works:1 符合/不符合我國現(xiàn)行法律、法規(guī)要求;meet/not meet the requirements of the current state laws and regulations.2 符合/不符合我國現(xiàn)行工程建設(shè)標(biāo)準(zhǔn);meet/not meet the requirements of the current national standards.3 符合/不符合設(shè)計文件要求;meet/not meet the requirements of the design documents.4 符合/不符合施工合同要求。After the inspection, the above materials /ponents/equipment,meet/do not meet the requirements of the design documents and specifications. site mobilization is allowed/site mobilization is not allowed, use for the proposed locations is allowed /not allowed.項目監(jiān)理機構(gòu)CS/CMC 總/專業(yè)監(jiān)理工程師Chief/discipline supervision engineer 日 期Date 54 / 54HE/工程材料/構(gòu)配件/設(shè)備清單工程名稱:編號:施工承包方供 貨 方口 業(yè)主 口 承包商專 業(yè)序號物資名稱數(shù) 量規(guī)格型號或標(biāo)準(zhǔn)代號進場日期生產(chǎn)廠家使用部位質(zhì)量證明文件自檢結(jié)果注:本表與A9表配套使用。We have mobilized the following materials/ponents/equipment for the works on its quantity is listed below(see the attachments).Now, we submit the quality documents and our self inspection results, The proposed locations for use as follows: ,Please review it. 附件Attached:1 數(shù)量清單 Quantity List;2 質(zhì)量證明文件 Quality Documents;3 自檢結(jié)果 Self Inspection Results。According to clauses of the construction contract ,due to the reasons, we request the cost claim of (amount in words) ,please approve it.索賠的詳細理由及經(jīng)過 Detailed cause and course of the claim:索賠金額的計算 Calculation of claimed amount:附Attached:證明材料 Supporting documents承包單位(章)Contractor(Chop)項目經(jīng)理Project manager 日 期Date SH/T 工程材料/構(gòu)配件/設(shè)備報審表Works Materials/Components/Equipment Inspection Request工程名稱 Works Title:編號 Item No:致 (監(jiān)理單位)To (CS/CMC)我方于年月日進場的工程材料/構(gòu)配件/設(shè)備數(shù)量如下(見附件)。According to clauses of the construction contract clauses , due to the reasons, we request the works delay, please approve it.合同交工日期Contract As Build Date:申請延長交工日期Delayed As Build Date:附件Attached:1 工程延期的依據(jù)及工期計算 Works delay basis and working period calculation:2 證明材料 Supporting documents。 承包單位(章)Contractor(Chop)項目經(jīng)理Project Manager 日 期Date SH/T 監(jiān)理工程師通知回復(fù)單Correspondence to Supervision Engineer Notice工程名稱 Works Title: 編號 Item No: 致 (監(jiān)理單位)To (CS/CMC)我方接到編號為的監(jiān)理工程師通知后,已按要求完成了工作,現(xiàn)報上,請予以復(fù)查。We have pleted the works, after the self inspection, the works is on spec, now we submit the inspection request for this works, please inspect and accept.附Attached:承包單位(章)Contractor (Chop)項目經(jīng)理Project Manager 日 期Date 審查意見 Review ments:項目監(jiān)理機構(gòu)CS/CMC 總/專業(yè)監(jiān)理工程師 Chief/discipline supervision engineer 日 期Date SH/T 工程款支付申請表Works Payment Request工程名稱 Wor