【正文】
eller received the Buyer‘s claim. 20. 遲交貨與罰款(Late delivery and Penalty): 除合同第21條不可抗力原因外,如賣方不能按合同規(guī)定的時(shí)間交貨,買方應(yīng)同意在賣方支付罰款的條件下延期交貨?! he manufacturers shall, before delivery, make a precise and prehensive inspection of the goods with regard to its quality, specifications, performance and quantity/weight, and issue inspection certificates certifying the technical data and conclusion of the inspection. After arrival of the goods at the port of destination, the Buyer shall apply to China Commodity Inspection Bureau (hereinafter referred to as CCIB) for a further inspection as to the specifications and quantity/weight of the goods. If damages of the goods are found, or the specifications and/or quantity are not in conformity with the stipulations in this Contract, except when the responsibilities lies with Insurance Company or Shipping Company, the Buyer shall, within _____ days after arrival of the goods at the port of destination, claim against the Seller, or reject the goods according to the inspection certificate issued by CCIB. In case of damage of the goods incurred due to the design or manufacture defects and/or in case the quality and performance are not in conformity with the Contract, the Buyer shall, during the guarantee period, request CCIB to make a survey. 19. 索賠(Claim): 買方憑其委托的檢驗(yàn)機(jī)構(gòu)出具的檢驗(yàn)證明書向賣方提出索賠(包括換貨),由此引起的全部費(fèi)用應(yīng)由賣方負(fù)擔(dān)。貨到目的港后,買方將申請(qǐng)中國(guó)商品檢驗(yàn)局(以下簡(jiǎn)稱商檢局)對(duì)貨物的規(guī)格和數(shù)量/重量進(jìn)行檢驗(yàn),如發(fā)現(xiàn)貨物殘損或規(guī)格、數(shù)量與合同規(guī)定不符,除保險(xiǎn)公司或輪船公司的責(zé)任外,買方得在貨物到達(dá)目的港后__日內(nèi)憑商檢局出具的檢驗(yàn)證書向賣方索賠或拒收該貨?! he Seller shall guarantee that the modity must be in conformity with the quatity, specifications and quantity specified in this Contract and Letter of Quality Guarantee. The guarantee period shall be______months after the arrival of the goods at the port of destination, and during the period the Seller shall be responsible for the damage due to the defects in designing and manufacturing of the manufacturer. 18. 檢驗(yàn)(Inspection)(以下兩項(xiàng)任選一項(xiàng)): ?。?)賣方須在裝運(yùn)前__日委托______檢驗(yàn)機(jī)構(gòu)對(duì)本合同之貨物進(jìn)行檢驗(yàn)并出具檢驗(yàn)證書,貨到目的港后,由買方委托________檢驗(yàn)機(jī)構(gòu)進(jìn) 行檢驗(yàn)?! he Seller shall, immediately upon the pletion of the loading of the goods, advise the Buyer of the Contract No., names of modity, loading quantity, invoice values, gross weight, name of vessel and shipment date by_________ within________hours. 17. 質(zhì)量保證(Quality Guarantee): 貨物品質(zhì)規(guī)格必須符合本合同及質(zhì)量保證書之規(guī)定,品質(zhì)保證期為貨到目的港__個(gè)月內(nèi)。在CFR術(shù)語(yǔ)下,賣方應(yīng)在裝船前2天以____方式通知買方合同號(hào)、品名、發(fā)票價(jià)值及開(kāi)船日期,以便買方安排保險(xiǎn)。在貨物越過(guò)船弦并脫離吊鉤以前一切費(fèi)用和風(fēng)險(xiǎn)由賣方負(fù)擔(dān)?! ?5. 裝運(yùn)條款(Terms of Shipment): ?。?) FOB交貨方式 賣方應(yīng)在合同規(guī)定的裝運(yùn)日期前30天,以____方式通知買方合同號(hào)、品名、數(shù)量、金額、包裝件、毛重、尺碼及裝運(yùn)港可裝日期,以便買方安排租船/訂艙?! ull set o