【正文】
In the cross section design, consider the problems of broadening subgrade on curve whole design is divided into several stages to stage requires integrated consideration and careful essential parison and checkout both are required to do before and after the design conforms to the standard, submit relevant achievements of design, and then finish the designKey Words:Level section、Profile、Vertical curve、Subgrade、Cross Section2。In profile design , we must pay attention to the maximum grade、the connection of grade section and pensation of gradient etc。關(guān)鍵詞:平面縱斷面豎曲線路基橫斷面XX大學(xué)畢業(yè)設(shè)計(jì)(論文)AbstractThe article aims in designing newbuilt railway preliminarily for JingYi line from Moren to Aqiale section and relevant concrete contents of the design are as follows : Following the procedures of preliminary design , bine the topography、geology condition , select the basic trend of the line on the topographic map of belt contour , and start the subgrade design,including level location、level section design、profile design、cross section design、subgrade cubic meter of earth and stone calculation program and design、level coordinate calculation program of line and design、translating a relevant foreign technological the course of level location, follow the gradient changes to locate the line。整個(gè)設(shè)計(jì)分幾個(gè)階段進(jìn)行,每一階段的工作都需要綜合考慮、精心設(shè)計(jì)。設(shè)計(jì)的具體內(nèi)容由以下幾個(gè)部分組成:結(jié)合地形、地質(zhì)條件,在帶狀等高線地形圖上,按初步設(shè)計(jì)的步驟,選定線路的基本走向,并進(jìn)行路基設(shè)計(jì),包括線路的平面定線、平面設(shè)計(jì)、縱斷面設(shè)計(jì)、橫斷面設(shè)計(jì)、路基土石方計(jì)算程序設(shè)計(jì)、平面坐標(biāo)計(jì)算程序設(shè)計(jì)、及相關(guān)外文科技文獻(xiàn)翻譯一篇。Tax policy。s policy is the government to raise finance capital, intervention, one of the important tool to manage the economy in promoting the sustainable development of energy plays an irreplaceable energy sustainable development as the targets for energy tax policy is mainly make up for market defect, correct traditional not reasonable model of economic development, and achi