freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

25萬(wàn)噸聚丙烯項(xiàng)目施工組織設(shè)計(jì)-wenkub.com

2024-11-15 18:42 本頁(yè)面
   

【正文】 Total investment for the new PP plant is RMB million yuan. The investment is made by SINOPEC, SPC and BP。 rotating equipment test run, large machine unit test run and interlocked plant test run shall succeed at the first gooff, reaching design annual capacity. Meanwhile, the visual inspection score of installed items shall reach 88 and that of civil works shall reach 92. The plant can operate safely, smoothly at full load for long term in the future. 工程經(jīng)賽科 IPMT 各部門會(huì)同設(shè)計(jì)、監(jiān)理、施工等相關(guān)單位驗(yàn)收一次合格;Engineering quality shall pass inspection by SECCO’s IPMT departments together with design, supervision and construction institutions at one time. 我們的最終質(zhì)量目標(biāo)是:和所有相關(guān)方共同努力,將上海賽科 25 萬(wàn)噸/年聚丙烯裝置新建工程建成中國(guó)國(guó)家優(yōu)質(zhì)工程。達(dá)到設(shè)計(jì)規(guī)定的年度生產(chǎn)能力;同時(shí),安裝項(xiàng)目的觀感得分在 88 分以上, 民用市政工程觀感得分在 92 分以上。 prefabrication and installation of HP pipes, SS pipes and the pipes of special quality shall be controlled as critical points. 電氣施工,當(dāng)條件具備后,應(yīng)集中勞動(dòng)力,在短時(shí)間內(nèi)將截面積大,線路長(zhǎng)的電纜先敷設(shè)完;對(duì)于電機(jī)分布較集中的區(qū)段,能進(jìn)行預(yù)制的如電纜橋架、電纜配管等,應(yīng)提前預(yù)制加工,以減少現(xiàn)場(chǎng)施工量,壓縮現(xiàn)場(chǎng)安裝時(shí)間。預(yù)制前對(duì)管段圖進(jìn)行二次細(xì)化設(shè)計(jì),以利于提高管道的預(yù)制深度。其余一般設(shè)備的安裝吊裝采取常規(guī)的施工方法進(jìn)行;廠區(qū)道路在大件設(shè)備運(yùn)輸時(shí)應(yīng)予以適當(dāng)?shù)谋Wo(hù)。Rigorously enforce process discipline, apply powerful measures to quality management, assign wellqualified personnel to corresponding posts, control process pipe construction in all respects concerned, prepare detailed operating instructions and weldIng operation instructions, control pipe installation quality and weldIng quality, and manage quality and progress schedule in a concerted way. 對(duì)于電氣、儀表工程的施工,配置經(jīng)驗(yàn)豐富、曾參加過(guò)聚丙烯裝置施工或熟悉裝置的技術(shù)工人和技術(shù)人員進(jìn)行施工作業(yè),及時(shí)與設(shè)計(jì)人員進(jìn)行溝通,做好安裝調(diào)試工作。 increase per capita productivity。Make reasonable arrangement on site。Favorable geographic location and good water/land transportation conditions of Shanghai are very advantageous to transportation of domestic and foreign raw materials and products at lower costs. Abundant talents resource in Shanghai can provide manpower and technical support for construction and production of the project. Successful construction of the project will make up the large demand for PP in Chinese and overseas market. . 編制依據(jù) Preparation Basis. 組織設(shè)計(jì)編制所依據(jù)的資料、文件的名稱和編號(hào)Name and code of data and documents based on which the anization design is prepared 上海賽科聚丙烯項(xiàng)目_ SECCO Polypylene EPC Project 7中國(guó)石化工程建設(shè)公司 SEI《 上海賽科 25 萬(wàn)噸/年聚丙烯裝置基礎(chǔ)設(shè)計(jì)》SEI “BASIC DESIGN OF Shanghai SECCO 250,000 PP PLANT ”上海 SECCO 有關(guān)技術(shù)文件附錄 RELEVANT SHANGHAI SECCO TECHNICAL DOCUMENTS APPENDIX 上海 SECCO《施工質(zhì)量規(guī)則》RU00CIJQU0001Shanghai SECCO “Construction Quality Rules ”. 組織設(shè)計(jì)編制所依據(jù)的標(biāo)準(zhǔn)、規(guī)范的名稱及編號(hào)Name and code of standards and specification based on which the anization design is prepared 上海賽科聚丙烯項(xiàng)目_ SECCO Polypylene EPC Project 8《石油化工給水排水管道工程施工及驗(yàn)收規(guī)范》SH353395 “Construction and Acceptance specification for Petrochemical Water Supply and Drainage Pipe Works”《埋地鋼質(zhì)管道石油瀝青防腐層施工及驗(yàn)收規(guī)范》SYJ402088“Construction and Acceptance specification for Corrosionresistant Asphalt Coating on Buried Steel Pipes”《石油化工立式圓筒形鋼制儲(chǔ)罐施工工藝標(biāo)準(zhǔn)》SH/T35302020“Construction Process Standard for Petrochemical Vertical Cylindrical Steel Storage Tanks”《石油化工鋼儲(chǔ)罐地基充水預(yù)壓監(jiān)測(cè)規(guī)程》SH/T31232020“Monitoring Procedures for Foundation Waterfilling Prepressure of Petrochemical Steel Storage Tanks”《鋼制塔式容器》JB47102020“Steel Tower Vessels”《石油化工換熱設(shè)備施工及驗(yàn)收規(guī)范》SH35321995“Construction and Acceptance specification for Petrochemical Heat Exchanging Equipment”《鋼制壓力容器》GB1501998(第 1 號(hào)修改單 2020)“Steel Pressure Vessels”《鋼制壓力容器焊接工藝評(píng)定》JB47082020“Steel Pressure Vessels Welding Procedures Qualification”《壓力容器無(wú)損檢測(cè)及第一號(hào)修改單》JB47301994 “Nondestructive Testing of Pressure Vessels and Revision Sheet No1”《鍋爐壓力容器安全監(jiān)察暫行條例》國(guó)發(fā)(1982)22 號(hào) 上海賽科聚丙烯項(xiàng)目_ SECCO Polypylene EPC Project 9《鍋爐壓力容器安全監(jiān)察暫行條例》實(shí)施細(xì)則、勞鍋?zhàn)郑?992)1 號(hào),勞部發(fā)(1995)264號(hào)關(guān)于修改《鍋爐壓力容器安全監(jiān)察暫行條例》實(shí)施細(xì)則個(gè)別條文的通知Detailed rules and regulations of “Interim Regulations for Safety Surveillance of Boilers and Heat Exchangers” LAOGUOZI (1992) and amendments thereof LAOBUFA(1995) 《鍋爐壓力容器、壓力管道焊工考試與管理規(guī)則》國(guó)質(zhì)檢鍋(2020)109 號(hào)“Qualification and Management Rules for Welders of Boilers, Pressure Vessels and Pipes” GUOZHIJIANGUO (2020) 《石油化工設(shè)備安裝工程質(zhì)量檢驗(yàn)評(píng)定標(biāo)準(zhǔn)》SH35142020“Quality Inspection and Evaluation Standard for Installation of Petrochemical Equipment”《壓縮機(jī)、風(fēng)機(jī)、泵安裝工程及驗(yàn)收規(guī)范》GB502751998 “Quality Inspection and Evaluation Standard for Installation of Compressors, Fans and Pumps” 《機(jī)械設(shè)備安裝工程施工及驗(yàn)收通用規(guī)范》GB502311998“General Specification for Construction and Acceptance of Installation of Mechanic Equipment”《大型設(shè)備吊裝工程施工工藝標(biāo)準(zhǔn)》SHJ51590“Construction Process Standard for Lifting of Large Equipment”《化工工程建設(shè)起重施工規(guī)范》HGJ20183“Construction Procedures for Lifting Operations of Chemical Projects”《起重設(shè)備安裝工程施工及驗(yàn)收規(guī)范》GB502781998“Construction and Acceptance specification for Installation of Lifting Equipment”《鋼制焊接常壓容器》JB/T473597“Atmospheric Welded Steel Vessels”《化學(xué)工業(yè)爐結(jié)構(gòu)安裝技術(shù)條件》 HG2054492“Technical Conditions for Installation of Chemical Furnace Structures”《工業(yè)金屬管道工程施工及驗(yàn)收規(guī)范》GB5023597“Construction and Acceptance Specification for Industrial Metal Pipe Works”《石油化工劇毒、可燃介質(zhì)管道工程施工及驗(yàn)收規(guī)范》SH35012020“Construction and Acceptance Specification for Petrochemical Metal Pipes Containing Extremely Toxic and Combustible Medium” 上海賽科聚丙烯項(xiàng)目_ SECCO Polypylene EPC Project 10《石油化工鋼制管道工程施工工藝標(biāo)準(zhǔn)》SH/T35172020“Construction Process Standard for Petrochemical Steel Pipes”《現(xiàn)場(chǎng)設(shè)備、工業(yè)管道焊接工程施工及驗(yàn)收規(guī)范》GB5023698“Construction and Acceptance Specification for WeldiIng of Field Equipment and Industrial Pipes”《石油化工異種鋼焊接規(guī)程》SH352692“Petro
點(diǎn)擊復(fù)制文檔內(nèi)容
研究報(bào)告相關(guān)推薦
文庫(kù)吧 www.dybbs8.com
備案圖片鄂ICP備17016276號(hào)-1