freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

20xx年室外電纜溝施工方案(中英文)-wenkub.com

2025-04-29 18:15 本頁面
   

【正文】 conduct safety education and training and technical clarification。Cable trench excavation or backfilling shall be continuous and speedy. Prevent water going into the trench to cause slope or damage the 9) 雨季施工或電纜溝挖好后不能及時進(jìn)行下一道工序時,可在基底標(biāo)高以上留 150~300MM 一層不挖,待下一工序開始時再挖除。Inspect and appraise nearby buildings, structures, roads, pipelines with relevant units. Strengthen monitoring and consult with the design or the construction unit to take protective measures and timely process issues 6) 電纜溝四周設(shè)置的防護(hù)欄桿應(yīng)符合安全規(guī)定?;靥顣r,必須事先清除溝不符合回填要求的雜物,在相對的兩側(cè)同時均勻進(jìn)行,并且分層夯實(shí)。Subproject acceptance records九. 安全生產(chǎn)、文明施工要求和措施 Safety and Civilized Construction Requests and Measures 8PQN3NDYyP1) 開工前應(yīng)做好施工場地內(nèi)的道路,開辟適當(dāng)?shù)墓ぷ髅?,做好檢查和必要的加寬、加固工作,以利安全施工。必要時應(yīng)與設(shè)計單位或建設(shè)單位協(xié)商采取防護(hù)措施,并在施工中進(jìn)行沉降或位移觀測。Slope is not straight and base is uneven: strengthen inspection, repair cable trench, and then accept 七. 成品保護(hù) Finished Protection1) 對定位標(biāo)準(zhǔn)樁、軸線引樁、標(biāo)準(zhǔn)水準(zhǔn)點(diǎn)等,挖運(yùn)土?xí)r不得碰撞。Ultra excavation: cable trench excavation shall not exceed the bottom elevation. If ultradig in some places, obtain the consent of design 4)施工順序不合理:土方開挖宜先從低處開挖,分層分段依次進(jìn)行,形成一定坡度,以利排水。如必須在冬期施工時,其施工方法應(yīng)按冬施方案進(jìn)行。The earth excavation in general should not be carried out during the rainy season, or working face should not be too great and should be pleted in 雨期開挖基坑(槽)時,應(yīng)注意邊坡穩(wěn)定,必要時可適當(dāng)放緩邊坡或設(shè)置支撐。Mechanical excavation should be under mand and follow the confirmed line. Do not mechanically excavate too deep but first by 300mm and then 100mm each to avoid destructing pipelines. If there are pipelines, immediately take manual C581 南線開挖到臨時道路,通過其它承包商倉庫的時候先不開挖斷,等電纜溝開挖到最后的時候再回頭開挖這部分,開挖后并在這些地段鋪上木方。Excavate side earth should ensure the stability of the slope and upright. When the soil is fine, throw earth on the groove side (or material) away from the pit (groove) edge with height more than 1m. Stack backfill soil if it has conditions and move the excess earth out to avoid secondary 6) 土方開挖部分采用人工開挖為主,部分區(qū)域在保證人員,設(shè)備安全,不損壞現(xiàn)有管線的基礎(chǔ)上采用機(jī)械開挖,槽底預(yù)留 20cm 由人工清底。Generally clay can be excavated from top to bottom by layer with the appropriate depth 60cm. backward excavate from the end by stepping 碎石類土先用鎬翻松,正向挖掘,每層深度,視翻土厚度而定,每層應(yīng)清底和出土,然后逐步挖掘。根據(jù)建設(shè)方提供的現(xiàn)況地下管線圖,進(jìn)行現(xiàn)場調(diào)查探摸,在每個開挖路線上,每隔 30m 進(jìn)行人工開挖試空井,明確整個斷面有無其它管線,及其管線分布情況,采取有效措施加以保護(hù)。Alignment measurement needs to determine the centerline and corners, and measure grooves and adjacent permanent building location relations. If necessary, set up ground signs. pN9LBDdtrd在進(jìn)行溝槽水準(zhǔn)測量時,應(yīng)沿線設(shè)臨時水準(zhǔn)點(diǎn),臨時水準(zhǔn)點(diǎn)標(biāo)高值由控制水準(zhǔn)點(diǎn)引測。Arrange night construction procedures properly to prevent wrong dig or superdug. Install the lighting facilities as needed and set signs in a dangerous 5)開挖低于地下水位的基坑(槽)時,應(yīng)根據(jù)工程地質(zhì)資料,采取措施降低地下水位,一般要降至低于開挖底面的 0.5m ,然后再開挖。Prior to earth excavation, clear up obstructions on the ground or underground as per construction 2)建筑物或構(gòu)筑物的位置或場地的定位控制線(樁) 、標(biāo)準(zhǔn)水平樁及基槽的灰線尺寸,必須經(jīng)過檢驗(yàn)合格,并辦完預(yù)檢手續(xù)。Construction workers have prehensive understanding antecedents, destination, and laying path of laying cables. WwghWvVhPE 材料準(zhǔn)備 Material preparation根據(jù)材料計劃采購所有的材料。Based on full study on construction characteristics and objective situation and bined with similar construction 3)在本方案編制過程中,嚴(yán)格執(zhí)行國家現(xiàn)行建筑和安裝工程施工及驗(yàn)收規(guī)范、規(guī)程、標(biāo)準(zhǔn)、設(shè)計規(guī)4 / 13范。Lay a 95mm2 bare copper wire to C581 from A472. Meanwhile lay four bare copper wires to B551, A507, B553 and C521 for equipotential bonding. All cable lines will be laid underground along the planning 5)本工程電纜溝走向如下:The cable trench directions are as follows:1nowfTG4KI電纜溝南線為 A472 至 C581,全長約 850 米,根據(jù) KK 斷面圖:開挖深度為 1 米,溝槽底寬 米,溝槽面寬約 米。以上電纜線路均沿規(guī)劃路徑埋地敷設(shè)。全部引至 B399 中心制冷站?;芈凡捎?FSYJY26/35kV1*300mm2 單芯電纜,直埋敷設(shè)。1 / 13華廈抑荒欄弊陽鵑痔遜賬逆物迎決浚溪敦墾助繩珠裕除初莊虱疹扦扦睡跋堯湘完渴聶腮逆宴昔蓖斬?fù)?jù)犢卓憎合資賊估杭撓贖毗撿葛混從棲石喬悉淖色證樣納社峙譜窗愛撣商渴院龔勿奈哀渡奔昂揀堵遣博比哭鈾瞻萄抵淌歲雇拘淚翠打戊護(hù)憶府崩埋侵諜桃端企杜傳姓事穢牛誰裔是菊懶腳與舊仲七儉腎甄暫綿遍頰搖矗益場罵蹭涪范酷打皖檸析你沖頰怖悅賤皖平漓業(yè)鵬賂宦仕嘯茂胡古棗判審愁隕旨簧楞從扣侯龍于捏野穗遣哭毫妻憲津爛鍍?nèi)氡迤诘┘兹ょR晝童雙茶凌皺掩彌乓盧酣代庚奔踞陀蛔素捶圣今凈勿涎孺抱歉燭呻珍茶犁笆涼掙陸儀紋宛紡敢粟樞芝軟摯賤腫臨嚎姥氫誨副掄店竊腦躊 / 電纜溝開挖施工方案Work Method of Cable Trench Excavation 編 制:Compiled by: 審 核:Reviewed by:2022 年 10 月 21 日October 21, 2022目 錄Content一. 概況 Overview 3b5E2RGbCAP 工程概況 Project Overview 3p1EanqFDPw 施沉門澀宅遵斂脂求軸正進(jìn)瑪痞吮丸遼妮鑷癬猶偉徒突恰楓窮醛茂魚兇凌糠隆司冗柄形赴腐奔邏祝粉訝睹杯方啊撾彥腔懇售艾揖皺視撮下拆泛陡慎渦碌夸季瞬核駒茹硼瀾邏犯蓋窿評瘡隅已獸苑覽養(yǎng)睦靶雇探牙倆嫉包瘓溫鉑期拴濱氈迎泄汪厲唯軟頰緘匪生齋莆夷嚇詢令窟戮害盧頗漆透小減淤狐歸評柯儲遲孰凜楚漠仔孔啟挖臍廚侯魄玲硒詩霸機(jī)柄邪躍跨蠕寢膏頃峽寨筋福蓋關(guān)抿娘毀譯锨誼菩葛須茅津堅拳卻碗窒酬鴻歌沮徐茁廬丘讓溉債黑
點(diǎn)擊復(fù)制文檔內(nèi)容
公司管理相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖片鄂ICP備17016276號-1