freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

麥x錫培訓(xùn)資料-jitsimulation-wenkub.com

2025-05-17 08:10 本頁面
   

【正文】 2 3 4 5 amp。 it is not a plete record of the discussion. August 1999 Just in Time Simulation Client name 1 ? Introduction ? Objectives ? Context ? Format ? Simulation ? The pany ? Initial roles ? Stage 1 ? Stage 2 ? Stage 3 ? Stage 4 ? Stage 5 Just in Time (JIT) Simulation 2 ? To demonstrate the key elements and benefits of JIT manufacturing ? To show how JIT differs from Traditional Manufacturing ? To learn together by doing Traditional Manufacturing ? Teamwork ? Practical ? Enjoyable Just in Time Manufacturing Objectives 3 Context: PSDC Lean Transformation Model People system Operating system Quality system Business need Process and effect Sustainability and Continuous Improvement Delivery Reliability Minimum Lead time Lowest Possible Cost Zero Defect Total Quality Process F M S Autonomation J I T Element Over production Motion Waiting Inventory Rework Transportation Over processing Profitability Stable Employee Relations Human Resource Management Maximized people contribution Lean manufacturing methodology Elimination of waste Change management Work environment Organisation structure Continuous improvement culture People Workplace anisation TPM Process measurement amp。Issue 4, 2/8/1999 This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client anisation without prior written approval from McKinsey amp。 review S S Standardised operations Machine design Line design Factory design Intelligent automation Poka Yoke Performance monitoring Problem resolution Continuous flow processing Takt time Pull System Levelled production Waste Competitiveness Enabler 4 ? At each stage we will: ? The exercise is a simulation of a multistage,
點(diǎn)擊復(fù)制文檔內(nèi)容
教學(xué)課件相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖片鄂ICP備17016276號-1