【正文】
程序檢查應(yīng)用設(shè)備的功能3) Verify final machine (including base machine, application machine, DUT, Test software) have been functionally tested and pass tests 用樣品和程序檢查整個(gè)設(shè)備的功能是否通過(guò)測(cè)試4) Run GRamp。R test and verify all results are passed (Dev=,3DUT, 3Operators, 10times/DUT, Total 90times)檢查設(shè)備的重復(fù)性和可靠性(3個(gè)操作員分別用3個(gè)樣品進(jìn)行測(cè)試, 每樣測(cè)10次,共90次, )Buy Off and Signature設(shè)備最終驗(yàn)收和簽名This step describes buying off and sign of machine if it is verified. The qualification result should be: Pass, UAI, Rejected and Scrapped. The result will be identified on machine labeling for each machine. When a machines is verified pass, it is required to sign a machine verification specification amp。checklist finally and documented and delivery with machines. Below is reference:這里規(guī)定如何最終驗(yàn)收設(shè)備,每個(gè)設(shè)備檢查的結(jié)果由設(shè)備檢查規(guī)格書來(lái)判定。每個(gè)設(shè)備附帶一份該設(shè)備檢查規(guī)格書并備案。送交設(shè)備時(shí),一份最終簽署的設(shè)備檢查規(guī)格書和設(shè)備一同送出。 Delivery to Site設(shè)備驗(yàn)收后交送Once machines are buyoff and documented, they will be delivered with labeling amp。 one specification to site dedicated by customer and/or requestor.當(dāng)設(shè)備驗(yàn)收合格并備案后,設(shè)備隨同標(biāo)識(shí)和簽署的規(guī)格書一起送往客戶指定的地方。 ECN and Upgrade工程變更和升級(jí)If machine is required ECN or any upgrade, the labeling and specification will be updated accordingly after machine modified or upgrade based on ECN/Upgrade annotation on machine labeling. All labels still need enclosed for tracking or record.如果設(shè)備需要變更或升級(jí),標(biāo)識(shí)和簽署的規(guī)格書應(yīng)相應(yīng)的升級(jí)。但所有的標(biāo)識(shí)將保留以被追溯。 Machine Scrapped 設(shè)備廢棄處理If machine is obsolete and/or scrapped before delivery to site, the machine with labeling amp。 signed specification will be put away and scrapped together. 如果設(shè)備需要報(bào)廢,設(shè)備和相應(yīng)的標(biāo)識(shí)以及簽署的規(guī)格書將一起廢棄。 Record記錄All quality records mentioned in this work instruction will be reserved for three years.本指引所提及的質(zhì)量記錄保存三年。7 / 7