【正文】
thwest China[Ph. D. Thesis][D]. Nanjing:Hohai University,2022.(in Chinese))[2] 張強(qiáng)勇,朱維申,金亞兵. 彈塑性損傷模型在某地下廠房工程中的應(yīng)用[J]. 巖石力學(xué)與工程學(xué)報(bào), 1999,18(6):654–657.(ZHANG Qiangyong,ZHU Weishen,JIN Yabing. Application of elastoplastic damage model in a large sized underground powerhouse[J]. Chinese Journal of Rock Mechanics and Engineering,1999,18(6):654–657.(in Chinese))[3] JING L. A review of techniques,advances and outstanding issues in numerical modelling for rock mechanics and rock engineering[J]. International Journal of Rock Mechanics and Mining Sciences, 2022,40(3):283–353. [4] 朱煥春,BRUMMER R,ANDRIEUX P. 節(jié)理巖體數(shù)值計(jì)算方法及其應(yīng)用(一):方法與討論[J]. 巖石力學(xué)與工程學(xué)報(bào),2022,23(20):3 444–3 449.(ZHU Huanchun,BRUMMER R,ANDRIEUX P. Joint rock mass numerical putation and application(1):method and discussion[J]. Chinese Journal of Rock Mechanics and Engineering,2022,23(20) :3 444–3 449.(in Chinese))[5] SITHARAMA T G,SRIDEVIB J,SHIMIZU N. Practical equivalent continuum characterization of jointed rock masses[J]. International Journal of Rock Mechanics and Mining Sciences, 2022, 38(3): 437–448.[6] SITHARAMA T G,LATHA G M. Simulation of excavations in jointed rock masses using a practical equivalent continuum approach[J]. International Journal of Rock Mechanics and Mining Sciences, 2022,39(4):517–525.[7] MIN KIBOK, JING L R. Numerical determination of the equivalent elastic pliance tensor for fractured rock masses using the distinct element method[J]. International Journal of Rock Mechanics and 1314 / 9Mining Sciences,2022,40(6):795–816.[8] GOODMAN R E,TAYLOR R L,BREKKE T L. A model for the mechanics of jointed rock[J]. Journal of the Soil Mechanics and Foundations,1968,194(3):637–659.[9] ITASCA. Three dimensional distinct element code:user? s guide[M]. Minneapolis:Itasca Consulting Group,Inc.,1999.[10] SINGH B. Continuum characterization of jointed rock masses. Part I—The constitutive equations[J]. International Journal of Rock Mechanics and Mining Sciences,1972,10(4) :337–349.[11] MAULDON M. Estimating mean fracture trace length and density from observations in convex windows[J]. Rock Mechanics and Rock Engineering,1998,31(4):201–216.[12] 韓榮榮,張建海,張 肖,等. 溪洛渡地下廠房開挖反饋計(jì)算及預(yù)測研究[J]. 山東大學(xué)學(xué)報(bào)(工學(xué)版),2022,39(4):140–144.(HAN Rongrong,ZHANG Jianhai, ZHANG Xiao,et al. Study of prediction on feedback calculation of excavated monitor to the underground powerhouse of Xiluodu[J]. Journal of Shandong University(Engineering Science),2022,39(4) :140–144.(in Chinese))[13] 李友華,黃應(yīng)軍,李景元,等. 溪洛渡水電站左岸地下廠房大跨度高邊墻開挖施工技術(shù)[J]. 水力發(fā)電, 2022,34(9):9–13.(LI Youhua,HUANG Yingjun,LI Jingyuan,et al. Excavation techniques of large span and high sidewall of leftbank underground powerhouse of Xiluodu hydropower station[J]. Journal of Hydro Electricpower, 2022, 34(9): 9–13.(in Chinese))[14] ODA M. Method for evaluating the representative elementary volume based on joint survey of rockmass[J]. Canadian Geotechnical Journal,1988,25(3) :281–287.1315 / 9