【正文】
epting liquid ceaselessly, when pressed air is through the bottom of tower, wind pressure should be little than 100mm water column and wind can’t be very strong, at the same time all of tooth slot must be frothy and the frothy cap don’t shake.(16)塔內(nèi)施工人員須穿干凈的膠底鞋,且不得將體重加在塔板上,應(yīng)站在梁上面或木板上。 worker who work in the tower must pull on clean glue shoes, it is forbad add whole avoirdupois on the board of tower,it is right stand on the beam or wood block.(17)人孔及人孔蓋的密封面及塔底管口應(yīng)采取保護(hù)措施,避免砸壞或堵塞,搬運(yùn)和安裝塔盤(pán)零部件時(shí),要輕拿輕放,防止碰撞弄臟,避免變形損壞。Airproof surface of manhole、manhole’s lid and nozzle down the tower must take protecting measure in order to avoid fail and jam. When transiting and installing ponent of tray worker must lift and lay lightly in order to prevent to hit、befoul 、distortion and attaint. (18)施工人員除攜帶該層緊固件和必須工具外,嚴(yán)禁攜帶多余的部件。每層塔盤(pán)安裝完畢后,必須進(jìn)行檢查,不得將工具等遺忘在塔內(nèi)。Worker forbad to bring superabundance ponent get rid of this floor tightening part, after each tray is installed, we must check carefully, forbid to leave tool in the tower.5).填料塔內(nèi)件安裝install fitting of filling tower (1)顆粒填料安裝應(yīng)符合下述要求:installing grain filling should accord with next request:①.填料應(yīng)干凈,不含泥沙、油垢和污物。The filling must be clean and the filling don’t include mud、oil and dirt.②.填料安裝過(guò)程中應(yīng)避免破碎或變形,有破碎變形者必須揀出。We should avoid to fall to pieces and metamorphose during installing, things of falling to pieces and metamorphosing must be picked out.③.顆粒填料在規(guī)則排列部分應(yīng)靠塔壁逐圈整齊正確排列。如下圖所示,顆粒填料排列位置允許偏差為其外徑的1/4。Grain filling arranged with formula should be orderly and rightly arranged alongside wall of tower. See the down drawing, allowing warp of arrange location for grain filling is 1/4 of its outside diameter.abab a=b177。(D/4) a b177。(D/4)(2)填料床層壓板安裝應(yīng)符合下列規(guī)定:Installing the pressing plate for bed of filling must accord with next rules.①.填料床層壓板的規(guī)格、重量、安裝中心線及水平度應(yīng)符合圖紙的要求。The specification、weight、center line of installation and degree of level for bed of filling must answer for the require of drawing.②.不得對(duì)填料施加過(guò)大的附加力。Forbid to throw very strongly force on the filling.(3)液體分布裝置應(yīng)符合下列要求: Set of dispersing liquid should answer for next rules.①.液流管大小和距離應(yīng)符合圖紙的要求。Size and distance of pipe that liquid flow in must answer for request of drawing.②.溢流槽支管開(kāi)口下緣應(yīng)在同一水平面上,允許偏差為2mm。All of down edge for branching pipe’ placket of overflow groove ought to is at the same level. ③.液體分布裝置安裝后應(yīng)作噴淋試驗(yàn),實(shí)驗(yàn)時(shí)塔截面內(nèi)噴淋應(yīng)均勻,噴孔不得堵塞。After installing set of dispersing liquid, we must do the test of cascade, during the test dispersing liquid must be uniformity in the section of tower, and spraying hole can’t be stop.④液體分布裝置安裝允許偏差應(yīng)符合下表要求(mm):Allowing warp for installing set of dispersing liquid must answer for next rules:部件名稱name of parts水平度level degree中心線center line安裝高度installing height分布管distributing tube分布盤(pán)distributing trayD≤1500 3D1500 433蓮蓬噴頭spray head likelotus flower安裝軸線偏斜最大不超過(guò)1Leaning degree of installing axesis less than 133液流盤(pán)tray of flowing liquid液流槽groove of flowing liquidD/1000,且不大于4At the time less than 4510寶塔噴頭spray head like pagoda安裝軸線偏斜最大不超過(guò)1Leaning degree of installing axes is less than 133:when equipment of getting rid of bubble is installed we must answer for the next rules.①.除沫器絲網(wǎng)結(jié)構(gòu)應(yīng)按設(shè)計(jì)規(guī)定鋪設(shè),如設(shè)計(jì)不規(guī)定可采用平鋪,每層之間皺紋方向應(yīng)錯(cuò)開(kāi)一個(gè)角度,分塊的絲網(wǎng)安裝時(shí),彼此之間與器壁之間應(yīng)均勻擠緊。We lay Silk screen structure of equipment of getting rid of bubble according to design, if spread is forbad by design it must be moved some angle at each wrinkle direction. When we installed block silk screen, they must be tighten symmetrically. ②.除沫器安裝的中心、標(biāo)高及水平度應(yīng)符合設(shè)計(jì)要求。Center、level and level degree of equipment installed of getting rid of bubble should answer for request of design.十二、twelve清理與封閉Cleaning and closing1) 塔安裝完畢后,均應(yīng)進(jìn)行清掃,清除內(nèi)部的鐵銹、泥砂、灰塵、木塊、邊角料和焊條頭等雜物;對(duì)無(wú)法進(jìn)行人工清掃的設(shè)備,可用蒸汽或空氣吹掃,但吹掃后必須及時(shí)除去水分;對(duì)因受熱膨脹可能影響安裝精度及損壞構(gòu)件的塔,不得用蒸汽吹掃,忌油塔的吹掃氣體不得含油;清掃檢查合格后,及時(shí)進(jìn)行封閉,并填寫(xiě)“清理、檢查、封閉記錄”。After tower already is installed, cleaning work will be made, clean rust、mud and sand、dust、wood block、leftover material、head of welding rod and so on. the equipment that can not be cleaned with manpower can be blowed with steam or air, but wet must be cleaned in times after blowing。 these towers which installation precision will be affected because of hot expanding and which fitting have be attainted can not be blowed with steam. When the tower that cannot touch oil, blowing air cannot exist oil. After checking is ok, we must close equipment in time, and fill in “note of cleaning、checking and closing ” 十三、thirteen氣密性試驗(yàn) air tight test1)氣密性試驗(yàn)前,塔上的安全裝置、閥類(lèi)、壓力計(jì)、液面計(jì)等附件及全部?jī)?nèi)件均應(yīng)裝配齊全,并經(jīng)檢查合格。Before air tight test safe set、valve、pressure gauge、liquid surface gauge and all of inside ponent must be assembled altogether, and checked out.2)氣密性試驗(yàn)所用氣體應(yīng)為干燥、潔凈的空氣、氮?dú)饣蚱渌栊詺怏w;對(duì)要求脫脂的塔,應(yīng)用無(wú)油氣體。氣體溫度不得低于5℃。Gas that be used in the test must be dry、clean air, nitrogen or other inertia gas. The tower that be required to degreased should test with without oil gas.3)氣密性試驗(yàn)時(shí),緩慢升壓至設(shè)計(jì)壓力,至少保持30分鐘,同時(shí)以噴涂發(fā)泡劑等方法檢查所有焊縫和連接部位有無(wú)微量氣體泄漏,無(wú)泄漏不降壓為合格。When Test pressure of airtight test is making, pressure must rise to design pressure, remain pressure at least 30 minute, at the same time check leaking of gas with spewing vesicant method and so on, without leaking and falling pressure check out,試驗(yàn)時(shí)壓力應(yīng)緩慢上升,達(dá)到規(guī)定試驗(yàn)壓力后保持10min,然后降到設(shè)計(jì)壓力,對(duì)所有的焊縫和連接部位堿性檢查。不滲、不漏為合格。如有泄漏應(yīng)先卸壓后修補(bǔ),再重新做氣密試驗(yàn)直至合格。 times, pressure must rise slowly during test, this pressure must be remained 10 min after reaching pressure of test, and then this pressure is lowering pressure of design, all of welding line and place connected must be checked, it is ok without seeping and leaking. If seeping and leaking happen, we must repair after getting rid of pressure, and make air tight test until it is eligibility.十四、fouteen質(zhì)量保證體系Quality assurance system 1)質(zhì)量保證體系組織機(jī)構(gòu)圖The Organization Structure Chart of Quality assurance system項(xiàng)目經(jīng)理 柳承志技術(shù)負(fù)責(zé)人趙衛(wèi)權(quán)質(zhì)量負(fù)責(zé)人王志勇施工負(fù)責(zé)人 高坤設(shè)備負(fù)責(zé)人王小兵材料負(fù)責(zé)人張開(kāi)祥專業(yè)技術(shù)人員 趙衛(wèi)權(quán)資料管理員 李雪娥質(zhì)量檢查員 張建國(guó)