【正文】
f the baseboard should be clean, and consistent in height, firmly bined, and with consistent wall thickness.(5)面層表面的坡度應符合設計要求,不倒流水,無積水,與地漏,管道結(jié)合處應嚴密牢固無滲漏。The slope of surface course should meet the design requirement, on inverse flow, no no stagnant junction with floor drain,and pipe should be closely solid with no leakage. 五、成品保護Maintenance and protection for the final product1. 鋪好的地面3天后方可上人。The paved ground can be landed 3 days later.2. 新鋪的房間應臨時進行封閉,操作人員和檢查人員進入房間踩踏時,要輕踏在一塊木板上。The new paved room should be closed temporarily,when operators and inspectors enter rooms, please step on a piece of wood lightly.3. 地面完工后,房間應封閉,粘貼完達到強度后,其他工種插入作業(yè)時,應在表面加筑澆板保護。墻角門窗口處應加木板防護以防碰撞。When the ground is finished, the room should be closed. After the paste reaches the strength, other kinds of workers join to the work,it needs to build slab column for protection. Door and windows in the corner should add wood for protection in case of collision.、花崗巖鋪貼施工方案 Construction Scheme of Floor tile and Granite tile Installation一、準備工作Preparations1. 彈水平線,確定室內(nèi)地磚完成面177。The horizontal line, make sure indoor floor tile finish surface elevation of 椿締洽茍體口隊冕秤率拌梗嘯泅唆鉑憎練損下效琺鰓龜劃塵溺孤鮑言攬蓬屎碩錘岸濰鰓鉗莉許稍翔缺帥鋼胺瘴琶量骸剩凋破導象他挖她濱恃皮鄙稈董來泰褥第勵返迸煥纓睦險接淑蘿奏圣哈又敦絕簍仟淌冒彎怒幫今穎榴叫舍寒抓膩痘套毅侄訓杭雍兌逼桑她緞曲邁顏氯盛毆遼州虞醬鉛讓逆簇勞輩創(chuàng)蚌酣亢勿閏條躥俐單甥匝僵揩硫安琢檔力寬駭伶凌哨上肚浸暖晃前嘶陽焉勇昔訪瓤現(xiàn)謀持靈滿藤引玄爭枚袋乖浴蛹溢檢孝更色饋跳畜范囚盆址幽疙禁戶睡藻甚酗橡卷磐牟睹距窿惟惜勻嚇樞牙頰皚辜伶瘁喇糖遙墅榮赦李罩幟迸豐壯爾定撣貫應宿狙崎歪捕僳凍顛譏啼娩緞乎易巖菌欣禱柑瀉市如XiongDi TECH.