freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

公共建筑節(jié)能設(shè)計(jì)標(biāo)準(zhǔn)__(江蘇省公共建筑節(jié)能設(shè)計(jì)標(biāo)準(zhǔn))__dgj_32j_96—-資料下載頁

2024-10-24 19:05本頁面

【導(dǎo)讀】synchronousbackupsoftwaredoesnotrespondtotherestofthedatatobemodified.Inordertoensuremaximumserverexception,savingsomedata,synchronizationofreal-timebackupsoftwareshouldhavehigh,thatdelaydoesnotexceed1minute.Offsitebackupsthatmustbesupportedacrossworksegments.Inaccordancewiththeaboverequirementsfordevelopmentourdedicatedbackupsoftware.Afterdevelopment,wingthatopenedinsaltonhighspeedtestresultsmeet

  

【正文】 ipment , t he specif ic needs of t he equipment and mat erials quanti ies we wil det ail at er. the programme accor ding t o your pany39。s sit e t o see and list en t o the leader ship proposal, and in accordance wit h the act ual needs of t he pr oj ect, wit h r eference t o t he r elevant int ernational st andards and national st andards, bined wit h t he experience accumulat ed by t he pany engaged in mult iple project s, prepar e t he technology package. I f t he content s or any ot her aspect of t he pr ogramme has not detailed where we wele your valuable ment s. Second, t he design pr inciples of t he pr oj ect design f olows technology advanced, f unctional, st able and cost saving principles. And considering constr uction, maintenance and operation, and f or f ut ur e development, expansion, r econstr uc tion and other f actor s leave r oom for expansion. Design element s of the system is t he syst ematic, integrated and pr ehensive。 design has t he scientif icity, r easonabilt y and operabilt y. It s has folowing pr inciples: , and advanced and applicabilt y used cur rently mos t advanced of soft , and har dware and t he wor k technology, er rors r at e low, patible sex st rong, upgr ade easy, used module t ype str uctur e, expansion convenient , no r epeat constr uction invest ment , system of technology perf or mance and qualit y index should r eached int er nat ional eading level。 while, system of inst alat ion debugging, and sof tware pr ogr am m ing and oper at ion using and should sim ple, easy m ast er , f or China condit ions and t his pr oj ect of f eat ur es. Set t he num ber of advanced t echnology in a t he syst em s, r ef lect s t he cur r ent level of t he lat est developm ent of put er and wor k t echnology, adapt ed t o t he r equir em ent s of t he t im es. While t he syst em is t he syst em used f or var ious m anagem ent levels, it s f unct ions ar e conf igur ed t o pr ovide t he user wit h f or t able, saf e, f ast and convenient t o 3. 1, t he int elligent building design st andar ds ( GB/t 50314 2020) 3. 2, t he design st andar d f or int elligent building syst em s engineer ing ( DB32/191 1998) 3. 3, t he code f or engineer ing design of generic cabling syst em f or cit y residential buildings ( CECS/1192020) 3. 4, code f or design of buildings and campus cable syst ems engineering ( GB/T50312020) , t he code f or elect rical design of civil buildings ( J GJ / T1692) , t he code f or civil closed cir cuit m onit oring TV syst em engineer ing t echnology ( GB/5019894) 3. 7, the types of syst em ear thing and saf et y technical r equirements (GB14050 93) 3. 8, of t he secur ity engineering procedures and r equirements (GA/T7594) , t he r ules of secur it y engineering acceptance (GA/T308 2020) , t he indust rial design of TV system code (GBJ 115) 3. 11, t he Secur it y checks pr event ion syst em pass f or gr aphics ymbol ( GA/7494) , and f ir e linkage contr ol equipment Gener al t echnology condit ions ( GB 16806 1997) f our, and syst em f unction and features in system both advanced, and pr actical, and matur e, and r eliable, and do system open, and can extended sex god, both invest ment reasonable, and benefit s best of pur pose, bor der securit y alar m system on site equipment for concentr at ed monit or ed, and cont rol and management, makes t hese equipment o secur it y, and r eliable, and ef ficient o run, M aximize int eligent management r ole to cr eate a saf e, healt hy, f or table and pleasant, and to im prove t he ef ficiency of a good environment and save ener gy, and reduce maintenance personel. Accor ding t o t he project39。s envir onmental needs, and engagement f unctions t o est ablish t he pr oj ect boundary securit y alarm syst em, in a Wor d, t his boundary is a project of the secur it y alar m system is highly automat ed and efficient hospit alit y for a f or table, convenient, and highly secure envir onment. Five, scheme design based on design principles, design specifcations and according to int ernat ional and domest ic st andar ds, and in accordance wit h user needs, as well as drawings and r elated infor mat ion provided by, and j oining t he pr oject 39。s actual sit uat ion and fut ur e development rends, bor der secur ity alarm systems f or t he pr oj ect design. . pr inciple of system and burglar alar m system f rom detectors, r egional dir ectors, and t he alarm contr ol centr e posed of t hr ee part s. It s pr inciples as in t he f ol wing chart : detect or s f or bur glar alarm syst em is inside and out side t he building in key ar eas, im por tant places, pr ot ect ion, when t he pr obe t o ilegal invaders, t he signal t ransmit ted to t he alar m contr ol: sound and light alar m, display address, about the person on dut y after receiving t he alarm, t ake measur es according to t he sit uat ion, t o contr ol t he developm ent of t he sit uation. Ant i thef t alar m system alarm f unct ion i addit ion to t he above, t her e is linkage f unction. Such as: open t he alar m light (including inf r ar ed lamp) , int er active audio and video m at rix cont roler , swit ch on t he alarm camera on the spot, matr ix contr oler TV series of cont rol: monit or displays an im age, video f oot age, mult imedia contr oler aut omatic or human . . 8. 1 t he t hree guarantees per iod war ranty 1, warr ant y 1) ser vice period f rom dat e of accept ance of engineering, a 1 year warr ant y, war ranty processing is pleted wit hin t he r esponse tim e is 48 hours. 2) service wit hin t he warr anty period, we all accessor ies uncondit ional war ranty for all equipm ent and r eplacement, alpar t s f or all equipment ( including all machine par ts) maint enance and part s ar e f ree and pr ovide on sit e cleaning, t est equipment ser vices. During t he warr ant y period, all equipm e
點(diǎn)擊復(fù)制文檔內(nèi)容
公司管理相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號-1