freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

設(shè)備安裝方案(中英文)-資料下載頁

2025-10-09 10:50本頁面

【導(dǎo)讀】本工程共有工藝設(shè)備248臺(tái)套,設(shè)備安裝包括噴油螺桿式空壓機(jī)組、容器、攪拌器、泵、風(fēng)機(jī)、板式換熱機(jī)組、儲(chǔ)罐等,主要分布在生產(chǎn)車間A/B、儲(chǔ)罐區(qū)、公用站房及污水處理站。設(shè)備安裝施工中對(duì)于設(shè)備安裝的中心線,坐標(biāo)位置,水平度,垂直度,標(biāo)高和相對(duì)。距離等各種幾何尺寸,施工驗(yàn)收規(guī)范都有嚴(yán)格要求;施工過程中對(duì)設(shè)備的卸車、存放、運(yùn)輸、吊裝乃至產(chǎn)品保護(hù)采取必要措施。在設(shè)備安裝前對(duì)臨時(shí)建筑運(yùn)輸?shù)?、水源、電源、照明、消。防設(shè)施、主要材料和機(jī)具及勞動(dòng)力應(yīng)有充分準(zhǔn)備和安排。程質(zhì)量檢驗(yàn)評(píng)定標(biāo)準(zhǔn)。OwnerCompany.業(yè)主公司提供的保溫工程施工及驗(yàn)收規(guī)范。工程建設(shè)起重施工規(guī)范》HGJ201-83

  

【正文】 surface ““, Concave surface “+”) (平面外形尺寸(凸臺(tái)取" ",凹面取" +") 177。20 4 Plane Levelness 平面水平度 mm/m 5 Full Length 全長(zhǎng) 10 5 Plumbness 垂直度 mm/m 5 Full Length 全長(zhǎng) 10 6 Anchor Bolt 地腳螺栓 Center Position 中心位置 177。10 Relative Distance of Opening 孔相對(duì)距離 10 7 Embedded Anchor Bolt 預(yù)埋地腳螺栓 Elevation (top) 標(biāo)高(頂) +20 CentertoCenter 中心距 177。2 、 Chip the surface on the foundation after secondary grouting. Depth of the pock marks should not be less than 10mm, Intensity should be 35 marks/dm2, and remove the oil and loosen layer on the surface. Chip the foundation surface at the temporary sizing block, its levelness error should not be more than .05mm/m, which should keep contact with the sizing block evenly. Contact area should not be less than 70%. Chip the contact surface of the foundation with anchor plate, for which contact area should not be less than 50%. 基礎(chǔ)上二次灌漿的表面鏟出麻點(diǎn),其麻點(diǎn)深度要求不小于 10mm,密度為 3~ 5 點(diǎn)/dm2 ,并清理表面的油污和疏松層。放置臨時(shí)墊鐵處的基礎(chǔ)表面鏟平,其水平度偏差不可大于 ,與墊鐵應(yīng)均勻接觸,接觸面積不少于 70% ?;A(chǔ)與錨板的接觸面鏟平,均勻接觸面積不少于 50% 。 、 When package installed pressor is installed during rust proof guarantee period, its internals may not be disassembled for cleaning and washing. 整體安裝的壓縮機(jī)在防銹保證期內(nèi)安裝時(shí),其內(nèi)部可不拆卸清洗。 、 Horizontal deviation of installation for package installed pressor in longitudinal and transversal directions should not be greater than , and measurement should be made on the main spindle exposed part or other datum plane. 整體安裝的壓縮機(jī)縱向和橫向安裝水平偏 差不應(yīng)大于 ,并應(yīng)在主軸外露部分或其它基準(zhǔn)面上進(jìn)行測(cè)量。 、 Disassembling, cleaning and inspecting of pressor parts will be done in accordance with the relative specifications. During reassembly of pressor connecting bolts for all elements should be tightened securely. Locking device must be secure. 對(duì)于壓縮機(jī)零部件的拆裝、清洗、檢查應(yīng)符合有關(guān)規(guī)范的要求。壓縮機(jī)回裝過程中各部件的連接螺栓必須擰緊,鎖緊裝置必須鎖牢。 、 After attached equipment such as buffer tank has been installed, connection will be made to the pressor system after qualified inspection. 附屬設(shè)備如緩沖罐,安裝后 ,應(yīng)在檢查合格后與壓縮機(jī)系統(tǒng)連通。 、 Mixer Installation 攪拌器的安裝 、 For mixer installation, pay attention to the protection of mixing shaft to avoid bending due to external impact, especially during transit and lifting stage of the mixing shaft. 對(duì)于攪拌器安裝,應(yīng)注意保護(hù)好攪拌軸以免受到外 力沖擊導(dǎo)致彎曲,特別在攪拌軸運(yùn)輸階段和吊裝階段一定要注意保護(hù)好。 、 Mixing shaft manufacturer will be required to fabricate special horizontal bracket and fix well during transit. Shaft will be vertically placed for storage for a long time to avoid bending and deformation. Pay attention to the vertical hoisting during lifting stage. 攪拌軸的運(yùn)輸階段要求廠家制作專門的水平托架固定好,長(zhǎng)時(shí)間儲(chǔ)存保管時(shí)應(yīng)對(duì)軸進(jìn)行垂直吊放以免出現(xiàn)彎曲變形,吊裝階段一定注意垂直吊裝。 、 When installing mixer, shaft seal and frame are located on the base frame, so the levelness and concentricity are the essential measuring points. They must be controlled within the allowance range to ensure mixing shaft verticality and connection to speed reducer and passing through shaft seal to enable smooth running. 在攪拌器安裝時(shí),因軸封和機(jī)架定位于底座,所以底座的水平度和同心度是關(guān)鍵測(cè)量點(diǎn),必須控制到誤差范圍內(nèi)。從而保證攪拌軸垂直度 以及與減速器連接又穿過軸封還能順利運(yùn)轉(zhuǎn)。 五、 Method statement and sequence for installation of process equipment at different areas 各工藝設(shè)備安裝區(qū)域的工藝設(shè)備安裝方法和安裝原則 Installation Method: Equipment installed at spacious area shall adopt the method of centralized setting in place by crane. Equipment unable to be set in place directly by crane can be located in place by using chain blocks plus rolling bars. But the ground for civil construction must be effectively protected, pave soft rubber sheet and hard fiber board. Equipment with smaller volume and weight less than 3 tons will be located in place by manual hydraulic forklift for safety. 安裝方法: 寬敞 區(qū)域的設(shè)備采用 汽車 吊機(jī)集中就位方法 ,不能用吊機(jī)直接就位的設(shè)備可以輔助用手拉葫蘆 +滾杠進(jìn)行就位,但必須對(duì)土建地面進(jìn)行有效保護(hù),鋪上軟質(zhì)橡膠板和硬質(zhì)纖維板 。 體積較小和重量小于 3 噸的設(shè)備采用手動(dòng)液壓叉車進(jìn)行安全就位。 Installation Principle: Lifting of equipment will be done in accordance with the sequence such as lower equipment before upper equipment, larger equipment before smaller equipment, inside equipment before outside equipment, heavier equipment before lighter equipment to save energy and reduce consumption. Our pany will choose the technicians and construction teams with rich installation experiences, apply advanced technique and ensure construction quality and schedule to satisfy the requirement of equipment installation. 安裝原則:設(shè)備吊裝先下后上、先大 后小、先里后外、先重后輕合理安排順序,節(jié)能降耗;我公司將選擇安裝經(jīng)驗(yàn)豐富的技術(shù)人員和施工班組 ,采用先進(jìn)技術(shù)確保設(shè)備安裝的施工質(zhì)量和施工進(jìn)度。
點(diǎn)擊復(fù)制文檔內(nèi)容
公司管理相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖鄂ICP備17016276號(hào)-1