【正文】
(c)...percent of the total contract price for delay exceeding weeks。 the payment of penalties by party b to party a as stipulated in article 9 shll not releve party b of its obligation to deliver the said documents. whenever the delay in delivering the said documents exceeds 6 months, party a shall be entitled to terminate the contract at its discretion and party b shall be obliged to re fund party a all its payments together with the corresponding ingerest at the rate of... percent per annum. if the verification tests fail with the responsibility lying with party b and if,as theresult,party a cannot start normal production with the contract having to be terminated, party b shall erfund all the payments previously made by party a to party b together with the interest at the rate of... percent per annum. if only some aspects of the properties of the product are not up to the standards asstipulated in the contract and the responsibility lies with party b, party b shall 10. 1 all drawings, designs, specifications and all other technical information ln case any part (s) or all of the abovementioned technical information have after the termination of the contract, party a shall have the rigbt to use manufacture,use,and export contract products. party b guarantees that it is the legitimate owner of the patent to the patent to party a. of accusation of infringing the rights of a third party occurs, economicresponsibilities trising therefrom a plete list of party b’s patents and patent applications relevant to ail taxes, customs duties and other excises arising in connection with the in the execution of the contract, any ine made by party b within the if either of the contracting parties is prevented from executing the contract by forcer majeure events such as war, serious flood, fire, typhoon and earthquake, the involred party shall notify the other party by telex or cable within the should the force majeure event last more than one hundred and twenty(120)con all disputes arisint from the execution of or in connection with the cotract can be reached through consultations, then the disputes shall be submitted to the arbitration shall take place in stockholm, sweden, and be conducted by the arbitration award shall be final and binding upon both parties. the arbitiation fee shall be borne by the losing party. if the arbitration involves only a part of the contract, then in the course of arbitration, the execution of the contract shall be continued except the part which is article 15 applicable law articl l6 duration the contrant os signed on may 8, 1993, by authorized represenatives of botb both partfies shallexert their best efforts to obtain the approval within sixty (60) tbe contract shall be valid for ten (10) years beginning from the date of its validity period of the contract. the termination of this contract shall not affect in any way the outstanding party a :_________________ party b:___________________ by_______________ by__________________ 14