freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

湖南大學(xué)建筑工程畢業(yè)設(shè)計(jì)-中英文摘要。。(編輯修改稿)

2024-11-12 12:01 本頁面
 

【文章內(nèi)容簡介】 l and exterior level is ,which is linked by the step, The indoor ground elevation is 177。 and the building39。s design life for 50 construction belongs to the first class intensity of anearthquake resistance of buildings is 7, and fireresistant Grade waterproof roofis the second classification: Ⅱ of Structural DesignFoundation: The foundation of the building uses independent engineering: The structure system of this building is Reinforcedconcrete frame seismic fortification intensity is 7 degrees, to design the first group of seismic structure seismic grade is : Except outside wall using fired perforated brick outside, the rest wall bodyadopts concrete hollow carve a piece, the M5 hybrid sand syrup carves to build, the wall is thick 240 section size of the elements : column, 1100mm1100mm。frame girder, 400mm of junior beams which cross section size is 250mm550mm follows vertical direction thicknesses of the first roof slab is 160mm,while the other floor39。s is 120 main method of calculation: the Iteration is used to pute the interiorforce which under the vertical interior force and lateral which is made by the horizontal loads is calculated by Dvalue materials :Concrete: FoundationbedC15Foundation, foundation beams, beams, slab and columnC35Steel:Reinforcing steel bar is HRB400(fy=360N/mm2)Stirrup is HPB300(fy=270N/mm2)Load:Basic wind kN/m2。Basic snow kN/m2。Live load of kN/m2。Live load of Live load of stack39。s 。 of Graduation DesignWith the deepening of the reform of the construction management system, the project construction management more and more attention by people, the management level of enterprise39。s survival and development constraints bee the first elements, and quality, schedule and cost control is one of the most important management on the construction project as an example, the University with actual situation of the project, the construction of each division subdivisional work detailed design the basic theory of progress control from the project management knowledge, the Angle of the project, the pletion acceptance from start to prepare for the progress of the whole process system planning design, use a bar chart and network diagram analysis on schedule, and according to the actual situation proposed the concrete measures to ensure schedule implementation。Quality and security, has formulated strict technology, organizational measures for construction projects, faqs, key problems and set up a corresponding management planning organization, to ensure the quality and safety plans well : Construction project management, Schedule planningreinforced concrete, frame structure, D value method, library第三篇:土木工程畢業(yè)設(shè)計(jì)—教學(xué)樓設(shè)計(jì)—中英文摘要西北工業(yè)大學(xué)教學(xué)樓設(shè)計(jì)學(xué)生姓名:曾凡亮班級(jí):土木0801指導(dǎo)老師:馬斌奇、丁怡潔摘要:本教學(xué)樓共6層,,采用鋼筋混凝土框架結(jié)構(gòu),抗震等級(jí)為二級(jí),抗震設(shè)防烈度為8度,整個(gè)設(shè)計(jì)包括建筑設(shè)計(jì)和結(jié)構(gòu)設(shè)計(jì)兩部分。建筑設(shè)計(jì)部分,首先根據(jù)建筑的使用功能確定建筑的初步布局,包括建筑體形及室內(nèi)空間布置等,然后結(jié)合使用的材料、做法進(jìn)一步確定具體尺寸和平、立面風(fēng)格等。結(jié)構(gòu)設(shè)計(jì)部分,首先根據(jù)建筑設(shè)計(jì)、工藝使用要求、材料供應(yīng)情況以及場地地質(zhì)條件等確定結(jié)構(gòu)布置方案,然后選取一榀典型框架進(jìn)行設(shè)計(jì)計(jì)算。在明確計(jì)算簡圖的前提下,進(jìn)一步確定框架承受的荷載,包括恒載、屋(樓)面活載,在此基礎(chǔ)上進(jìn)行框架內(nèi)力計(jì)算(采用D值法計(jì)算風(fēng)荷載作用下的內(nèi)力,采用彎矩二次分配法計(jì)算豎向荷載作用下的內(nèi)力)、內(nèi)力組合、梁、柱和基礎(chǔ)等構(gòu)件的配筋計(jì)算以及風(fēng)荷載作用下的側(cè)移驗(yàn)算。在上述工作的基礎(chǔ)上,采用制圖軟件AutoCAD 2004繪制了建筑施工圖和結(jié)構(gòu)施工圖。關(guān)鍵詞:鋼筋混凝土框架結(jié)構(gòu);教學(xué)樓;建筑設(shè)計(jì);結(jié)構(gòu)設(shè)計(jì)。Design of the teaching building in Northwestern Polytechnical University Student Name : Ceng Fa
點(diǎn)擊復(fù)制文檔內(nèi)容
語文相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖片鄂ICP備17016276號(hào)-1