freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

供貨商管理概論(編輯修改稿)

2025-02-08 16:58 本頁面
 

【文章內(nèi)容簡介】 cess control audit form.2. The process of vendor OQA(must meet MSL AQL) issued a clear road map withschedule and met the schedule10 issued a clear road map withschedule,but didn39。t meet the schedule4 issue any 0 issued a clear instruction andfollow the instruction exactly withrecord on site30 issued a clear instruction,butthe instruction was not followedexactly on site15 issued a clear instruction,butthe instruction was not followed at allon site5 any instruction issued or actiontaken0Supplier shall have keeping continuous development the Technology to improve the reliability, quality, functionally, Production efficiency/yield and new technology for the Product and process. And e out a clear Road Map toSuppliers should enforce the following items : 1. The improvement action in each 8D report.2. Action plan deciTechnologydevelopment/ roadmapEngineering Change Requests apply to both products and Process. ECRs areused to municate change made to the Form, fit and /or function of theproduct or process used in Producing a product. Mitac requires formal writtennotification and samples fImprovementenforcementCategory 2 sub total(20%)2 TechnologyCategory 1 sub total(30%)Extradeduction: Engineering REV. changecontrol(ECR)1 Quality?評分 考核評分與 TQRDCS 7/7 requirements 65 6/7 requirements 40 5/7 requirements 15 4/7 requirements 0 within 3 days 0 within 35days 15 within 57days 40 beyond 7 days 65 unfavorable responses 35 unfavorable responses 30 than 1 unfavorable responses 10 than 5 unfavorable responses 0 leadership 50 top three 25 of top three 090%~~100% 5080%~~89% 2575%~~79% 10less than 75% 0This assessment is based on the cost information of the market to makesure Mitac can get a good quality material with a good priceThis assessment is based on the ability of the supplier to respond toMitac request to meet program target costs ,Both monthly andquarterly in marketFA/CA1. Problem identification and action plan within 24 hours.2. Containment plan within 48 hours.3. Corrective action plan within 72 hours.4. Problem closure within 1 week.5. All actions executed to planned dates.6. All actions documented via 8D format. cost downtargetWhile Mitac doesn39。t receive qualified 8D expected from suppliers withinspecified period, score deduction is as leftwords.1. Satisfactory answers to your questions?2. The response to your inquiries, The majority of the time, was clear/Concise/acceptable?3. There was a timely acknowledgement to your request for information ?4. Business processes are proactively worked?TechnologyengineeringsupportCategory 3 sub total(15%)4 CostCategory 3 sub total(20%)3 ResponseExtra deduction:8D reply?評分 考核評分與 TQRDCS No delivry Demit 30One time delivery Demit 15More than one time 0No line shut down 30Have line shut down 0all build plan met 204 week build plan met 158 week build plan met 1012 week build plan met 5Failed to meet 12 week build plan 0Consistently meets all change requests 20Change requests are met98% 18Change requests are met95% 15Change requests are met90% 10Change requests are met85% 5Less than 85% 0=15days 0 RMA=1 month 10 monthRMA 20REMARK: Prepared by : Checked by : Approved by : time deliveryOn time delivery erformance is measured over weekly / monthlyperiods,based on must show willingness tosupport Mitac JIT programs.(100% Attainment to bulid plans)This measure
點擊復制文檔內(nèi)容
環(huán)評公示相關推薦
文庫吧 www.dybbs8.com
備案圖片鄂ICP備17016276號-1