【文章內(nèi)容簡介】
delivers above materials and documents, the designer is entitled to decide again the time of delivery of design documents. When the employer alters entrusted design items, scale and conditions, or delivers the wrong materials, or delivers mostly revised materials so that the designer rework for the design, the employer shall pay for rework cost for the designer based on the amount of the work performed by the designer except the supplemental agreement (or contract ) signed separately, and the relevant articles specified again by both parties through the consultation.Prior to signing the contract, if the employer has satisfied to design work which is done by the designer, the employer shall pay the corresponding design charge. During implementation of the Contract, when the employer requests to terminate and cancel the contract, the down payment paid by the employer shall not be returned if the designer doesn’t begin the design work。 if the designer starts the design, the employer shall pay half of design charge in the phase if it is less than half of the actual amount of work performed by the designer。 if it exceeds the half, the full design charge in the phase shall be paid in all. The employer shall pay the down payment in accordance with stipulations of the Contract. Reception of the down payment is the mark of mencement of design work for the designer. If the down payment is not received, the designer is entitled to put off the time of mencement of design work, and postpone accordingly the time of delivery of documents. The Employer should pay charges for design to the Designer at the amount and date provided in this Contract. For each day of overdue payment, 2‰ of the overdue payment shall be paid as damages for overdue payment and the time for delivery by the Designer shall be extended accordingly. Where the delay of payment has exceeded 30 days, the Designer shall have the right to suspend the performance of the work at the next stage and give written notice to the Employer. In case the higher authority or petent department of design approval would not approve the design documents or the engineering construction of this contract is suspended or stopped, the Employer should pay the payable charges for design. The employer requests the designer should deliver the design documents ahead of the time specified by the Contract, it shall need the approval of the designer, and shall not deviate gravely from the rational design period, and the employer shall pay for the crashing charge. The Employer should offer conveniences in aspects of working, living and traffic and necessary laborprotection equipments. The Employer shall be responsible for the national standard drawing, ministerial standard drawing and local standard drawings. The Employer shall bear the expenses for receiving foreign expert in charge of the engineering to the Designer39。s office (including expenses on fax, telephone, copy and office affairs).、標準進行設計,按本合同第六條規(guī)定的內(nèi)容、時間及份數(shù)向發(fā)包人交付設計文件?。?、規(guī)定有關(guān)交付設計文件順延的情況除外).并對提交的設計文件的質(zhì)量負責?! ?5 年。,負責該合同項目的設計聯(lián)絡工作。由于設計人設計錯誤造成工程質(zhì)量事故損失,設計人除負責采取補救措施外,應免收受損失部分的設計費,并根據(jù)損失程度向發(fā)包人支付賠償金,賠償金數(shù)額由雙方商定為實際損失的 \%。,延誤了設計文件交付時間,每延誤一天,應減收該項目應收設計費的千分之二。,設計人要求終止或解除合同,設計人應雙倍返還發(fā)包人已支付的定金。,按規(guī)定參加有關(guān)上級的設計審查,并根據(jù)審查結(jié)論負責不超出原定范圍的內(nèi)容做必要調(diào)整補充。設計人按合同規(guī)定時限交付設計文件一年內(nèi)項目開始施工,負責向發(fā)包人及施工單位進行設計交底、處理有關(guān)設計問題和參加竣工驗收。在一年內(nèi)項目尚未開始施工,設計人仍負責上述工作,可按所需工作量向發(fā)包人適當收取咨詢服務費,收費額由雙方商定。 Responsibilities of the Designer The designer shall perform the design in accordance with provisions of the State and the technical codes and standards stipulated in the Contract, deliver the design documents in accordance with contents, time and number of copies to the employer specified in Article 6 (exclusion of the case where the design documents shall be prolonged