【文章內(nèi)容簡介】
l range of audit method is just the difference between the different. Have focused on this method, the selection of calculation according to construction drawing parts value or higher proportion of investment item of larger quantities. Based, such as stone and brick (wall), reinforced concrete structure (beam, slab, column), wood (Windows), the steel structure (roof, wingceltis, support), and senior decoration, etc.。 Value is low or the proportion of investment for other smaller projects, such as ordinary decoration projects, retail projects (rain loose, aproll, ramps, open ditch, pond, the bin), such as reviewers often deliberately ignored, key verification with the quantity corresponding to the fixed unit price, especially the key audit norm child since the class is easy to confuse the unit price (such as ponent cross section, the monomer volume), followed by the concrete grade, masonry, plastering mortar label nuclear work. This method under the condition of the audit schedule is nervous, often apply to the construction unit construction unit audit budget or the construction unit budget audit design units. The parison method and the method of prehensive audit, work less, but the effect is not very bad, but still belong to rework. 3 and contrast analysis method Due to the above two methods is similar to prepare the construction drawing budget, workload is big, audit cycle is long, the budget staff in the longterm work for another method, namely audit parative analysis method. The method is on the basis of analyzing the accounting settlement data, find the similar regularity of project cost and material consumption, sort out different purposes. Structure is different, different areas of the project cost, consumption quantity indicators. Then, according to these indicators of audit object partition parison, find rules of do not conform to the investment division ponent project, aimed at these subtitle on audit, analyze the cause of the differences. Commonly used indicator has the following several types: (1) single cost index (yuan/m2, yuan/m2, yuan/m,...) 。 (2) division of the project scale: (1), (2) the f