freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

預(yù)算審核方法外文翻譯(編輯修改稿)

2024-09-19 20:54 本頁面
 

【文章內(nèi)容簡介】 l range of audit method is just the difference between the different. Have focused on this method, the selection of calculation according to construction drawing parts value or higher proportion of investment item of larger quantities. Based, such as stone and brick (wall), reinforced concrete structure (beam, slab, column), wood (Windows), the steel structure (roof, wingceltis, support), and senior decoration, etc.。 Value is low or the proportion of investment for other smaller projects, such as ordinary decoration projects, retail projects (rain loose, aproll, ramps, open ditch, pond, the bin), such as reviewers often deliberately ignored, key verification with the quantity corresponding to the fixed unit price, especially the key audit norm child since the class is easy to confuse the unit price (such as ponent cross section, the monomer volume), followed by the concrete grade, masonry, plastering mortar label nuclear work. This method under the condition of the audit schedule is nervous, often apply to the construction unit construction unit audit budget or the construction unit budget audit design units. The parison method and the method of prehensive audit, work less, but the effect is not very bad, but still belong to rework. 3 and contrast analysis method Due to the above two methods is similar to prepare the construction drawing budget, workload is big, audit cycle is long, the budget staff in the longterm work for another method, namely audit parative analysis method. The method is on the basis of analyzing the accounting settlement data, find the similar regularity of project cost and material consumption, sort out different purposes. Structure is different, different areas of the project cost, consumption quantity indicators. Then, according to these indicators of audit object partition parison, find rules of do not conform to the investment division ponent project, aimed at these subtitle on audit, analyze the cause of the differences. Commonly used indicator has the following several types: (1) single cost index (yuan/m2, yuan/m2, yuan/m,...) 。 (2) division of the project scale: (1), (2) the f
點(diǎn)擊復(fù)制文檔內(nèi)容
教學(xué)教案相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖片鄂ICP備17016276號-1