【文章內(nèi)容簡介】
terial: bricks, cement, steel, limestone, marble. ● Decoration materials: paint, pigment, coloured drawing or pattern Estimated cost: 200 million 2, Purchasing equipment Fitness equipment, puter equipment, etc. Estimated cost: 150 million 3, staff wages The design team, construction team and management team. Estimated cost: 100 million Expected total costs: 450 million Construction scale and content 1 ,Construction scale The sports center will be built into three layers , a swimming pool and rest area will be built in the outside 2, Construction content ?The first floor: One tennis court , one volleyball court ,one basketball court , one badminton court and the toilet will be built in the i