freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

施工單位用總報表(編輯修改稿)

2024-07-31 21:36 本頁面
 

【文章內(nèi)容簡介】 ),經(jīng)我方組織對該質(zhì)量事故進(jìn)行詳細(xì)調(diào)查、分析和研究,現(xiàn)將詳情及處理方案報上,請審查。On , at (works location), there was works qualtity incident, the works quality incident report (item No ) has been issued on , after we investigated, analyzed and studied it, now we submit the details and solution to you, please review.附Attached: 事故詳情及處理方案 Incident Details and Solution。承包單位(章)Contractor(Chop)項(xiàng)目經(jīng)理Project manager 日 期Date 審核意見 Review ments:同意此事故處理方案。Approved the solution for this incident.不同意此事故處理方案,修改后再報。Not approved the solution for this incident,please modify it and resubmit.按以下意見修改后執(zhí)行:To implement it after modified as per the following ments.項(xiàng)目監(jiān)理機(jī)構(gòu)CS/CMC 總監(jiān)理工程師Chief supervision engineer 日 期Date SH/T 主要施工設(shè)備進(jìn)場報審表Major Construction Equipment Mobilization Approval Request工程名稱 Works Title: 編號 Item No: 致 (監(jiān)理單位)To (CS/CMC)我方承擔(dān)的工程,按合同規(guī)定的主要施工設(shè)備、機(jī)具及檢測設(shè)備、工具擬進(jìn)場,并經(jīng)自檢合格,請查驗(yàn)。We contracted the works, we are going to mobilize the major construction equipment and tools as well as the inspection equipment and tools specified by the contract, after the self inspection, they are on spec, please inspect.附Attached:承包單位(章)Contractor(Chop)項(xiàng)目經(jīng)理Project manager 日 期Date 審查意見 Review ments:經(jīng)檢查上述施工設(shè)備、機(jī)具及檢測設(shè)備、工具,符合/不符合施工組織設(shè)計(jì)文件和相關(guān)要求,準(zhǔn)許/不準(zhǔn)許進(jìn)場。According to our inspection, the above equipment, tools and the inspection equipment and tools meet/do not meet the requirements of the construction organization design documents and other rules, site mobilization allowed /site mobilization not allowed.不準(zhǔn)許進(jìn)場原因如下:The reasons for not allowing site mobilization are listed below:項(xiàng)目監(jiān)理機(jī)構(gòu)CS/CMC 總/專業(yè)監(jiān)理工程師Chief/discipline supervision engineer 日 期Date HE/CS-承包商主要設(shè)備設(shè)施性能審查記錄表工程名稱:編號:項(xiàng)目名稱申報時間工程類別測量 □ 勘察 □ 試驗(yàn) □ 承包商名稱合同工程施工 □ 其它 □序號機(jī)具名稱規(guī)格型號數(shù)量使用許可情況設(shè)備狀況來 源備 注項(xiàng)目部審查意見: 項(xiàng)目經(jīng)理: 年 月 日承包商經(jīng)辦人: 年 月 日 (可加附頁) SH/T 單機(jī)試車申請表Premissioning Request工程名稱 Works Title:編號 Item No: 致 (監(jiān)理單位)To (CS/CMC)我方已按合同要求完成了試車準(zhǔn)備工作,經(jīng)自檢合格,請予以檢查,并準(zhǔn)予試車。We have pleted the missionig preparations according to the contract requiremetns, after the self check, the preparations are on spec, please check and approve the Premissioning test.附Attached:承包單位(章)Contractor(Chop)項(xiàng)目經(jīng)理Project manager 日 期Date 審核意見 Review ments:項(xiàng)目監(jiān)理機(jī)構(gòu)CS/CMC 總/專業(yè)監(jiān)理工程師Chief/discipline supervision engineer 日 期Date SH/T 勘察/設(shè)計(jì)費(fèi)用支付報審表Geotech/Design Payment Approval Request工程名稱 Works Title:編號 Item No:致 (監(jiān)理單位)To (CS/CMC)根據(jù)委托設(shè)計(jì)合同第條款,我單位已于年月日交付設(shè)計(jì)文件,建設(shè)單位應(yīng)支付該項(xiàng)勘察/設(shè)計(jì)費(fèi)共(大寫)(小寫:),請予以審核。According to clauses of the Entrusted Design Contract, we have submitted the design documents on ,Owner should make the payment of (amount in words)(say:)for geotech/design, please review.附Attached:勘察/設(shè)計(jì)單位(章)Geotech/Design Unit(Chop)項(xiàng) 目 經(jīng) 理Project manager 日 期Date 審核意見 Review ments:經(jīng)審核同意按合同第條款支付勘察/設(shè)計(jì)費(fèi)共(大寫)(小寫:)。After reviewed, the total payment of (amount in words)(say:)for geotech/design fees are approved to be made as per clause of the contract.項(xiàng)目監(jiān)理機(jī)構(gòu)CS/CMC 總監(jiān)理工程師Chief supervision engineer 日 期Date SH/T 勘察/設(shè)計(jì)進(jìn)度調(diào)整報審表Geotech/Design Schedule Change Approval Request工程名稱 Works Title:編號 Item No:致 (監(jiān)理單位)To (CS/CMC)我單位承擔(dān)的工程的 勘察/基礎(chǔ)工程設(shè)計(jì)/詳細(xì)工程設(shè)計(jì)原定完成,現(xiàn)擬調(diào)整到完成,請予以審查。Geotech/BED/DED of the works contracted by us was scheduled to be pleted on ,Now is rescheduled to pleted on ,Please review and approve it.調(diào)整原因 Change reasons:勘察/設(shè)計(jì)單位(章)Geotech/Design Unit(Chop)計(jì) 劃 工 程 師Planning engineer 項(xiàng) 目 經(jīng) 理Project manager 日 期Date 審查意見 Review ments:同意調(diào)整。Change approved.不同意調(diào)整.Change not approved.根據(jù)下列要求調(diào)整:To be changed as per the following requirements:項(xiàng)目監(jiān)理機(jī)構(gòu)CS/CMC 總監(jiān)理工程師Chief supervision engineer 日 期Date HE/CS-材料現(xiàn)場取樣見證單工程名稱:編號:致 (監(jiān)理單位)下列材料經(jīng)自檢,符合技術(shù)規(guī)范及圖紙要求,擬于 時間 地點(diǎn)取樣、送檢、復(fù)試請你方現(xiàn)場見證。附件:1. 材料清單(材料名稱、規(guī)格、數(shù)量);2. 材料出廠合格證( )份;3. 材料出廠試驗(yàn)報告( )份。取樣內(nèi)容(樣品名稱、數(shù)量、部位及方法等):                  專業(yè)質(zhì)檢員/材料員 承包單位(章)   日 期      見證記錄:   取樣人: 專業(yè)監(jiān)理工程師: 日期:     日   期 HE/CS-工 程 簽 證 單工程名稱:編號:合同號單元名稱專業(yè)簽證單號簽證類型口 業(yè)主委托 口 乙方申請 口 工程師指令 口 其它簽證申請人申請時間 年 月 日受理人完成時間 年 月 日簽證事由:簽證內(nèi)容(工程量計(jì)算、附圖等):                  業(yè)主(章):現(xiàn)場代表:項(xiàng)目負(fù)責(zé)人: 年 月 日監(jiān)理單位(章):專業(yè)工程師:總監(jiān)(代表): 年 月 日承包單位(章)技術(shù)負(fù)責(zé)人:項(xiàng)目負(fù)責(zé)人:年 月 日HE/CS-承包商資質(zhì)、主要(特種作業(yè))人員資格審查記錄表工程名稱:編號:項(xiàng)目名稱申報時間工程類別測量 □ 勘察 □ 設(shè)計(jì) □承包商名稱合同工程試驗(yàn) □ 施工 □ 其它 □企業(yè)性質(zhì)資質(zhì)類別資質(zhì)等級安全生產(chǎn)許可證號體系認(rèn)證編號序 號姓 名年 齡專業(yè)、職稱崗 位
點(diǎn)擊復(fù)制文檔內(nèi)容
環(huán)評公示相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖片鄂ICP備17016276號-1