freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內(nèi)容

冷凝水管路尺寸計算(編輯修改稿)

2025-07-19 23:44 本頁面
 

【文章內(nèi)容簡介】 ciated with a steam trap station, such as isolation valves, strainer, trap testing chamber, and check valve, can be the same size as the trapping device selected, whatever the discharge line size.A steam trap passing a fullload of 1000 kg/h at 6 bar g saturated steam pressure through a falling discharge line down to a flash vessel at bar g.As the discharge line is nonflooded, the lower figure of 25 mm is selected from the chart (Figure ).Fig. A nonflooded pressurised trap discharge line (refer to Example ) A steam trap passing a fullload of 1000 kg/h at 18 bar g saturated steam pressure through a discharge line rising 5 m up to a pressurised condensate return line at bar g.Add the bar static pressure (5 m head) to the bar condensate pressure to give 4 bar g backpressure. As the discharge line is rising and thus flooded, the upper figure o
點(diǎn)擊復(fù)制文檔內(nèi)容
環(huán)評公示相關(guān)推薦
文庫吧 www.dybbs8.com
備案圖片鄂ICP備17016276號-1