freepeople性欧美熟妇, 色戒完整版无删减158分钟hd, 无码精品国产vα在线观看DVD, 丰满少妇伦精品无码专区在线观看,艾栗栗与纹身男宾馆3p50分钟,国产AV片在线观看,黑人与美女高潮,18岁女RAPPERDISSSUBS,国产手机在机看影片

正文內容

瀝青船技術規(guī)格書船舶(編輯修改稿)

2024-12-04 08:29 本頁面
 

【文章內容簡介】 ................................................................................................................................64 GENERAL..........................................................................................................................................................64 BALLAST SYSTEM ...........................................................................................................................67 BILGE SYSTEM ...................................................................................................................................67 SCUPPER AND DRAINAGE SYSTEM............................................................................................68 Fuel Oil and System .........................................................................................................69 FIRE FIGHTING WASH DOWN SYSTEM .....................................................................................69 AIR AND SOUNDING PIPE ..............................................................................................................73 REMOTE LEVEL AND DRAFT GAUGING SYSTEM ...................................................................73 FRESH WATER SERVICE SYSTEM ................................................................................................74 DISTILLING WATER SYSTEM........................................................................................................74 COMPRESSED AIR SYSTEM FOR DECK SERVICE.....................................................................74 8. AIR CONDITIONING AND VENTILATION .....................................................................................................76 ENGINE ROOM VENTILATION.......................................................................................................76 AIR CONDITIONING SYSTEM ........................................................................................................76 MECHANICAL VENTILATION AND AIR CHANGE RATE ......................................................77 NATURAL VENTILATION...............................................................................................................78 VENTILATION OF SPACE AT CARGO DECK AREA.................................................................78 9. REFRIGERATING PLANT....................................................................................................................................80 10. AUTOMATION, MONITORING AND REMOTE CONTROL ..............................................................81 GENERAL DESCRIPTION .................................................................................................................81 MAIN ENGINE ....................................................................................................................................81 ALARM AND MONITORING SYSTEM.........................................................................................83 ELECTRIC GENERATING PLANT ...................................................................................................85 THERMAL OIL HEATER ..................................................................................................................86 OTHER’S AUXILIARY EQUIPMENT .............................................................................................86 SHIP’S SYSTEM CONTROL .............................................................................................................86 AUTOMATIC TEMPERATURE REGULATION ...........................................................................87 6,300 DWT ASPHALT CARRIER SC509601002SM M III AUTOMATIC CHANGEOVER OF STANDBY PUMP...............................................................87 AUTOMATIC STARTING AND STOPPING OF PUMP ..............................................................87 11. INSTRUMENTATION.................................................................................................................................88 PRESSURE, COMPOUND AND VACUUM GAUGE.....................................................................88 THERMOMETER ................................................................................................................................88 12. SPARE PART AND TOOL..........................................................................................................................89 SUPPLY PRINCIPLE FOR SPARE PART AND TOOL ..................................................................89 ENGINE ROOM INVENTORY ...........................................................................................................89 6,300 DWT ASPHALT CARRIER SC509601002SM M 1 5. MACHINERY GENERAL OF MACHINERY GENERAL The vessel to be designed and constructed as a single screw driven by a diesel engine located aft and in pliance with the requirements of Classification Society. The propelling plant consists of a lowspeed, reversible diesel engine driving a fixed pitch propeller through a fed steel shafting. The propeller shaft to be turned clockwise viewed from aft end of M/E when running ahead. The main electric generating plant consists of two (2) sets of main diesel generator set and one (1) set of emergency diesel generator set. The thermal oil heating plant consists of one (1) set of exhaust gas heater and two (2) sets of oil fired heater. The unattended machinery space to be provided, an airconditioned engine control room to be provided in engine room and to be equipped with engine controls device, main switchboard and other necessary monitoring equipment. SI units to be adopted for design, construction of machineries and measuring units, such as power, pressure, temperature and volume etc.. Pipes/valves flanges to conform to ISO standard. Pipe dimension and
點擊復制文檔內容
環(huán)評公示相關推薦
文庫吧 www.dybbs8.com
備案圖片鄂ICP備17016276號-1